HomeMy WebLinkAboutCF Fire Pump Report CSA 178 12_2019 Durham ib Pump PUMP CHECK REPORT
2313 Durham-Dayton Hwy.
Durham, CA 95938 530.891.4821 CSA#178 -Twin Palms
CUSTOMER NAME: Butte County Fire Dept. DATE: 12/13/2019
Motor Mfg: Franklin HP: 1/2 Meter#:
RPM 3450 Volts 240 Phase 1 Rated Amps: 6
TM 80 Yes No Serial#
PG &E Acct. # Other:
Panel Mfg: Franklin 1/2 HP Control Box NEMA Size:
Type:nX/L n P/W Other:
Pump Mfg: Serial#:
Non-Running Checks: Pump Model Type Submersible
na Lubricant Levels - Service and Change if Necessary
na Oiler Unit and/or Packing
Electrical Leads & Connections- Repair and Tighten as Necessary
Incoming Idle Voltage: W/I Acceptable Limits Unacceptable
Fuses- Replace if Necessary Replaced Size: FRN-R-8
Perform General Clean-Up of Electrical Panel and Motor
Running Checks: Motor winding resistance: O's to ground
Excessive or Unusual Noise Ok/see comments Pressure tank: AP-80
Excessive or Unusual Vibration Ok/see comments Tank condition: ok
Control Devices: H.O.A. Start Switch Time Clock
Frost Start Time Delay Other: PRESS. SWITCH
Amperage: Expected: 6 Pressure setting: 50-70 psi
Actual: R 0.08 Y 5.6 B 5.6 Average: 3.76
Overload Underload Even Load
Bowl Adjustment: N/A Yes No
Comments:
GPS: 39°42' 21.81"N 121° 47'43.33"W
The above readings reflect the site and pump conditions at the time of inspection.
This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system.
S:\Pump Dept. Files\PUMP TESTS& INSPECTIONS\Cal Fire CSA's\178 Twin Palms\178 Reports
Durham '. Pump PUMP CHECK REPORT
2313 Durham-Dayton Hwy.
Durham, CA 95938 530.891.4821 CSA#178 -Twin Palms
CUSTOMER NAME: Butte County Fire Dept. DATE: 12/13/2019
Motor Mfg: Franklin HP: 25 Meter#: 1006782494
RPM 3450 Volts 240 Phase 3 Rated Amps: 64
TM 80 Yes No Serial#
PG &E Acct. # Other:
Panel Mfg: Square D NEMA Size: 3
Type: X X/L P/W Other:
Pump Mfg: Serial#:
Non-Running Checks: Pump Model Manufacturer
Lubricant Levels - Service and Change if Necessary Discharge
na Oiler Unit and/or Packing
Electrical Leads & Connections - Repair and Tighten as Necessary
Incoming Idle Voltage: W/I Acceptable Limits Unacceptable
Fuses - Replace if Necessary Replaced Size: FLNR-100-10
Perform General Clean-Up of Electrical Panel and Motor
Running Checks: Motor winding resistance: O's to ground
Excessive or Unusual Noise Ok/see comments Pressure tank:
Excessive or Unusual Vibration Ok/see comments Tank condition:
Control Devices: H.O.A. Start Switch Time Clock
Frost Start Time Delay Other:
Amperage: Expected: 64 Pressure setting: PRESS SWITCH
Actual: L1 62 L2 58 L3 53.7 Average: 57.9
Overload Underload Even Load
Bowl Adiustment: N/A Yes No
Comments:
GPS: 39°42' 21.81"N 121° 47' 43.33"W
The above readings reflect the site and pump conditions at the time of inspection.
This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system.
S:\Pump Dept. Files\PUMP TESTS&INSPECTIONS\Cal Fire CSA's\178 Twin Palms\178 Reports