Loading...
HomeMy WebLinkAboutCF Fire Pump Report CSA 172 12_2019 Duch m . Pump PUMP CHECK REPORT 2313 Durham-Dayton Hwy. Durham, CA 95938 530.891.4821 CSA#172 Autumn Park Subdivision CUSTOMER NAME: Butte County Fire Dept. DATE: 12/12/19 Motor Mfg: Franklin HP: 2 Meter#: RPM Volts 240 Phase 1 Rated Amps: TM 80 Yes No Serial# PG &E Acct. # Other: Panel Mfg: Franklin control box NEMA Size: Type: X/L P/W Other: Pump Mfg: Serial#: Non-Running Checks: Pump Model Manufacturer na Lubricant Levels-Service and Change if Necessary na Oiler Unit and/or Packing Electrical Leads & Connections - Repair and Tighten as Necessary Incoming Idle Voltage: W/I Acceptable Limits Unacceptable Fuses- Replace if Necessary Replaced Size: 15 amp Perform General Clean-Up of Electrical Panel and Motor Running Checks: Motor winding resistance: Excessive or Unusual Noise Ok Excessive or Unusual Vibration Ok Control Devices: X H.O.A. Start Switch Time Clock Frost Start Time Delay Other: Press. Sw. 40-60 Amperage: Expected: 9.8 Actual: Red: 2 Yellow: 11.3 Black: 10.4 Average: 7.9 Overload Underload Even Load Bowl Adiustment: N/A nYes No Comments: GPS: 39°48'7.51"N 121°53'40.31"W The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions,nor warranty any part of the existing system. S:\Pump Dept.Files\PUMP TESTS&INSPECTIONS\Cal Fire CSA's\172 Autumn Park\172 Reports Durham . Pump PUMP CHECK REPORT 2313 Durham-Dayton Hwy. Durham, CA 95938 530.891.4821 CSA#172 Autumn Park Subdivision CUSTOMER NAME: Butte County Fire Dept. DATE: 12/12/19 Motor Mfg: Franklin HP: 25 Meter#: X11162 RPM 3450 Volts 460 Phase 3 Rated Amps: 75max TM 80 flYes X No Serial # PG &E Acct. # Other: Panel Mfg: Furnas NEMA Size: 3 Type: X/L P/W Other: Discharge Mfg: Fabricated steel 6" Serial#: Non-Running Checks: Pump Model Manufacturer na Lubricant Levels -Service and Change if Necessary na Oiler Unit and/or Packing Electrical Leads & Connections - Repair and Tighten as Necessary Incoming Idle Voltage: W/I Acceptable Limits Unacceptable Fuses- Replace if Necessary Replaced Size: 100 amp MCP Perform General Clean-Up of Electrical Panel and Motor Running Checks: Motor winding resistance: 1.2 Megs to ground Excessive or Unusual Noise Ok Excessive or Unusual Vibration Ok Control Devices: X H.O.A. X Start Switch Time Clock Frost Start Time Delay Other: Pres. Sw. Amperage: Expected: 75.0 max Actual: L1: 73.6 L2: 71.8 L3: 72.8 Average: 72.73 Overload Underload Even Load Bowl Adjustment: N/A Yes nNo Comments: High idle voltage. 490V, 492V, 490V Gate broken GPS: 39°48'7.51"N 121°53'40.31"W The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions,nor warranty any part of the existing system. S:\Pump Dept. Files\PUMP TESTS&INSPECTIONS\Cal Fire CSA's\172 Autumn Park\172 Reports