Good afternoon Supervisors,
Please see the email below from FERC.
Amy Schuman
Associate Clerk of the Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120
Twitter | Facebook | YouTube | Pinterest
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, October 6, 2020 2:34 PM
Subject: General Correspondence issued in FERC P-2088-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 10/1/2020, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-2088-000
Lead Applicant: South Feather Water and Power Agency
Filing Type: General Correspondence
Compliance Directives
Description: Letter to South Feather Water and Power Agency providing comments on the Eleventh Independent
Consultant's Safety Inspection Report and the Potential Failure Mode Analysis Addendum for Sly Creek Dam, which
is part of the South Feather Proj. under P-2088.
To view the document for this Issuance, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20201001-
3077__;!!KNMwiTCp4spf!S9wdymQmnJneckQ-p3KjEmYcgP-NrActF-
D2nfWsfdO3z0U8tFVR4wg0TpVFP7yY95fVhXC_zZc$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!S9wdymQmnJneckQ-
p3KjEmYcgP-NrActF-D2nfWsfdO3z0U8tFVR4wg0TpVFP7yY95fVhNz4-h4$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!S9wdymQmnJneckQ-
p3KjEmYcgP-NrActF-D2nfWsfdO3z0U8tFVR4wg0TpVFP7yY95fVzR4IzTg$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105-3084
(415) 369-3300 Office (415) 369-3322 Facsimile
October 1, 2020
In reply refer to:
Project No. 2088-CA
Mr. Rath Moseley
General Manager
South Feather Water and Power Agency
2310 Oro-Quincy Highway
Oroville, CA 95965
Re: Eleventh Sly Creek Dam
Dear Mr. Moseley:
submitted the Eleventh Indeport (CSIR) and
the Potential Failure Mode Analysis Addendum for Sly Creek Dam, which is part of the
South Feather Project, FERC No. 2088. We have completed our review of the submittal,
and we have the following comment:
The independent consultantecommendation regarding updates to the STID
including the DSSMP and a post-earthquake analysis of the Ogee spillway
have not yet been fully addressed. Submit an updated plan and schedule to
complete this recommendation.
Please submit a plan and schedule for addressing the comment within 30 days
after the date of this letter. We appreciate your cooperation in this aspect of the
If you have any questions, please contact Mr.
Ricardo Galdamez at (415) 369-3310.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer