Loading...
HomeMy WebLinkAbout11.02.20 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Lambert, Steve;Lucero, Debra; McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen; Teeter, Doug Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Monday, November 2, 2020 2:47:50 PM Good afternoon, Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, November 2, 2020 2:35 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/2/2020, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Eleventh Part 12D Safety Inspection Report for the DeSabla-Centerville Hydro Project of Pacific Gas and Electric Company under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20201102- 5195__;!!KNMwiTCp4spf!W9YYREsl-AVI2Soz_bCtO4CLN_fgigInsBdnf4ZvNOU6lNn- 9HUp11RNxKPspkTwvqiKApdA1cY$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!W9YYREsl- AVI2Soz_bCtO4CLN_fgigInsBdnf4ZvNOU6lNn-9HUp11RNxKPspkTwvqiKHU7Epc8$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!W9YYREsl- AVI2Soz_bCtO4CLN_fgigInsBdnf4ZvNOU6lNn-9HUp11RNxKPspkTwvqiKWqDGRpE$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 November 2, 2020 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Eleventh Part 12D Safety Inspection Report ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE Dear Mr. Blackett: This letter presents the eleventh Part 12D safety inspection report for Philbrook Dam, which is part of DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. The dam was inspected and the safety inspection report was prepared under the direction of Mr. Marc Ryan, P.E., G.E., in accordance with FERC Order No. 122. FERC authorized Mr. Ryan to serve as the independent consultant (IC) for Philbrook Dam in a letter dated May 22, 2020. Copies of the safety inspection report are enclosed with this letter (Enclosure 1). In accordance with Part 12D, Section 12.39,of the FERC regulations, PG&E will submit a plan and schedule for addressing the recommendations provided in the safety inspection report. The plan and schedule will be submitted to your office by December 31, 2020. As a result of the ongoing shelter-in- response to COVID-19 pandemic, nonessential PG&E staff are working remotely, the enclosed documents, please contact the license coordinator identified below, and copies will be sent after the shelter-in-place restrictions have been lifted and PG&E Mr. Frank L. Blackett, P.E., Regional Engineer November 2, 2020 Page 2 Should you have any questions or need further information concerning the technical aspects on this matter, please contact dam safety engineer, Ms. Aimee Corn, at (530) 894-4792. For senior license coordinator, Ms. Jamie Visinoni, at (530) 514-3911. Sincerely, Elisabeth Rossi Supervisor, Hydro Licensing Enclosure: CUI//CEII DO NOT RELEASE 1. Eleventh Safety Inspection Report, Philbrook Dam, prepared by Gannett Fleming and Slate and dated October 2020 cc: via ESFT Site Ms. Sharon Tapia, Chief Division of Safety of Dams Department of Water Resources