HomeMy WebLinkAbout11.04.20 CalRecycle NTP_Camp Fire Tree Removal Contract for Unincorporated Butte County From:Page, Laura To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Lambert, Steve;Lucero, Debra; Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Cc:Hatcher, Casey Subject:CalRecycle NTP/Camp Fire Tree Removal Contract for Unincorporated Butte County Date:Wednesday, November 4, 2020 1:19:51 PM Attachments:2020_11_04_DRR20047_NTP CTL.pdf image001.png Good afternoon Chairman Lambert and Supervisors of the Board, Please find attached to this email the Notice to Proceed for the Camp Fire Tree Removal Contract for the parcels located in the unincorporated areas of Butte County. C.T.L. Forestry Management, Inc. th dba Ceres Forestry (CTL) was awarded the contract today, November 4, 2020. A similar contract was awarded to SUKUT/ODIN/P31/J W Bamford Joint Venture (SOPB) for the Town of Paradise parcels. I will share the commencement of field operations as soon as I am apprised. This is wonderful news for the County, Town and region. All the best, Laura Page Deputy Administrative Officer Incident Commander, Hazard Tree Removal Program P.O. Box 3390, Chico, CA 95927-3390 lpage@buttecounty.net State of CaliforniaCalifornia Environmental ProtectionAgency M E M O R A N D U M To:Jeff Holland, PresidentDate: 4 November 2020 6069 Enterprise Drive Diamond Springs, California 95619 Jarrod Ramsey-Lewis, PE, CFE Contract Manager From: DEPARTMENT OF RESOURCESRECYCLING ANDRECOVERY (CalRecycle) Subject:Notice to Proceed (NTP) for Contract No. DRR20047 Congratulations on being awarded the contract for Hazard Tree Removalfor the Camp Fire, Butte County(Contract No. DRR20047). This Notice to Proceed authorizes C.T.L Forestry Management, Inc. dba Ceres Forestry (CTL)to start incurring reimbursable costs effective the executed contract date for contract number DRR20047. The purpose of this NTP is to allow CTLto begin organizing and making all necessary arrangements to start work on November 6,2020. CTLisresponsible forcomplying with the terms and conditions of the signed 213 Agreement between CTLand CalRecycle.Additionally, CTLis responsible formanaging itscontractors, subcontractors, and other agents and ensuring their compliance with the contract provisions. Operational priorities which must occur prior to commencement of work include the following: 1.Apply and obtain all California Department of Forestry and Fire Protection (CalFire) Timber Harvest Plan Exemption Requirementspursuant to the Forest Practice Rules under 14 CCR 1104.1(b), including but not limited,Public Agency, Public and Private Utility ROW Exemption and 14 CCR 1038(b),10% Dead, Dying, Diseased Trees,or the 2020 Exemption 14 CCR 1038(g) Post-Fire Recovery Exemption.Upon receipt of this this Notice to Proceed (NTP), please contact the Ramzi Ibrahim (916-926-9536) of the State Environmental Team to obtain draft exemptions for your review, consideration, and submission to CalFire.This application to CalFire shall be completed immediately.Provide written notification to the Incident Management Team, the State Environmental Team,and the Contract Manager of your submission of the relevant documents to CalFire. Notice To Proceed4November2020 DRR20047 Prior to commencing tree felling, you are also required to obtain coverage under the California Regional Water Quality Control Board, Central Valley(RWQCB) General Order No. R5-2017-0061 (General Timber Order). Projects meeting certain eligibility criteria in the General TimberOrder relating to CalFire exemptions are automatically enrolled under the General Timber Orderand must comply with the conditions in the General Timber Order.The State Environmental Team can assist you with working with the RWQCB.Provide written notification to the Incident Management Team, the State Environmental Team, and the Contract Manager when you obtain coverage under the General Timber Order; and 2.Your planning and operations team shall contact the State’s Operation and Planning team to coordinate and establish preliminary planning needs, including, but not limited to, “runway” schedules for public right of way trees and private property trees, processing/log storage yard operations, end use facility staffing, underground locates, and Department of Transportation (DOT) fleet inspection processes. Upon receipt of thisNTP, please contact the Operations Chief, Stephen Eto, at 916-693-7429 to arrange this meeting. You are also required to produce the following documents prior to the commencement of work: 1.Copies of all log storage and processing/staging yard permits; 2.Copies of all end use facility permits; 3.Copies of all Land Use Agreement(s) for Temporary Log Storage and Processing Site/Equipment Laydown yard facilities used to fulfill DRR20047; 4.Copies of Letter(s) of Commitment from end use facilities; 5.List of equipment anticipated for use to perform the work, including the type, model, size, year, and other pertinent information, the number of pieces of equipment, and whether each piece is owned or rented; 6.Work plandemonstrating how the Contractor plans to conduct their work, including schedules for implementation of log storage and processing yards, number crews and wood material transport trucks and their mobilization/demobilization during the operation; 7.Provide all other required permits including, but not limited to the following: a.Land use permits b.Storm water Prevention Pollution Plans c.Industrial Waste Permits, if applicable d.Road encroachment permits e.Any required (local, regional, state, or Federal) Operational permits f.As necessary environmental resource and historical preservation consultation for laws and regulations identified in 4.0 Environmental Compliance Framework –Table 1 of the Environmental Protection Plan. 8.Provide proof of bonding: Attach a notarized statement from the bonding company or companies your organization proposes to use, stating that the surety shall unconditionally guarantee the Contractor’s performance in all respects of the terms, conditions and provisions of DRR20047 tothe extent of a minimum of fifty percent (50%) of the total Agreement amount. The notarized statement shall guarantee that Page 2of 3 Notice To Proceed4November2020 DRR20047 the surety will execute the Faithful Performance Bond and Payment Bond requirement. This bond must guarantee Contractor’s compliancewith the terms of the Agreement. 9.Illness and Injury Prevention Plan;and 10.Verification of insurance coverage. Furnish the State with original certificates and amendatory endorsements effecting coverage as required by DRR20047. All certificates and endorsements are to be received and approved by the State before work commences. The State reserves the right to require complete, certified copies of all required insurance policies, including endorsements affecting the coverage required by these specifications at any time. Any required endorsements requested by the State must be physically attached to all requested certificates of insurance and not substituted by referring to such coverage on the certificate of insurance. You are expected to mobilize your Project Manager and Key Superintendents within forty- eight (48) hours of receiving this Notice to Proceed (NTP). Within five (5) working days of receiving this Notice to Proceed each Contractor shall mobilize a minimum of ten (10) Hazard Tree Removal Crews to their respective Contract Areas, as directed by the Incident Management Team. Upon receipt of this NTP, please notify the contract manager and thehazard tree removal IMT, Arcadis, U.S., Inc., and Tetra Tech, Inc.of your expected deployment date. Additionally, CalRecycle requeststhat CTLschedule aremote introductory meeting between CTLIMT, Arcadis’ IMT, Tetra Tech, Inc.and the State’s IMT. General topics expected to be discussed include onboarding training, data management, operational needs, planning needs, coordination with the finance and administrative consultant (DRR19104), and deployment schedule. Please contact me to schedule the introductory meeting. I will be the contract managerfor DRR20047. Please keep me informed of changes to your staff contacts, address, phone number, etc. If you have any questions, please contact me at (916) 693-3673or Jarrod.Ramsey-Lewis@CalRecycle.ca.gov. Cc: James Eisert, Arcadis-U.S., Inc., James.Eisert@Arcadis.com Betty Kamara, TetraTech, Inc., Betty.Kamara@Tetratech.com Ramzi Ibrahim, Environmental Lead, CalOES, Ramzi.Ibrahim@caloes.ca.gov Page 3of 3