Loading...
HomeMy WebLinkAbout11.24.20 Board Correspondence - FW_ General Correspondence issued in FERC P-1061-000,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:Board Correspondence - FW: General Correspondence issued in FERC P-1061-000,et al. Date:Tuesday, November 24, 2020 11:24:49 AM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, November 24, 2020 10:56 AM Subject: General Correspondence issued in FERC P-1061-000,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/24/2020, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-1061-000 P-1121-000 P-1354-000 P-137-000 P-1403-000 P-175-000 P-1962-000 P-1988-000 P-2105-000 P-2106-000 P-2107-000 P-2130-000 P-2155-000 P-2310-000 P-233-000 P-2687-000 P-2735-000 P-619-000 P-77-000 P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: General Correspondence Compliance Directives Description: Letter requesting Pacific Gas and Electric Company to file a response within 45 days re the overdue items for the DeSabla-Centerville Project under P-233 et al. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20201124- 3038__;!!KNMwiTCp4spf!WmJmSJCRAnmQidkTr9Zrb_4Lv8Wm_uo6G2ZzAwwvxVVpzOoMFewdCQEz_EPB1lelOWFug09NRck$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!WmJmSJCRAnmQidkTr9Zrb_4Lv8Wm_uo6G2ZzAwwvxVVpzOoMFewdCQEz_EPB1lelOWFuVBzD_Zs$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!WmJmSJCRAnmQidkTr9Zrb_4Lv8Wm_uo6G2ZzAwwvxVVpzOoMFewdCQEz_EPB1lelOWFuDItcf8Q$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 Office (415) 369-3322 Facsimile November 24, 2020 In reply refer to: Project Nos. 77, 137, 175, 233, 619, 803, 1061, 1121, 1354, 1403, 1962, 1988, 2105, 2106, 2107, 2130, 2155, 2310, 2687, and 2735 Mr. Jan Nimick, Vice President Pacific Gas and Electric Company Mail Code: N11E PO Box 770000 San Francisco, CA 94177-0001 Re: Overdue Items for PG&E Projects Dear Mr. Nimick: This letter is to inform PG&E about several items which our records indicate are currently overdue. The overdue items are listed in the enclosure. In addition, as of the date of this letter, it does not appear that we have yet received a response to either our July 20, 2020 letter regarding overdue items for the DeSabla-Centerville, Battle Creek, McCloud-Pit, and Hat Creek Projects (FERC Project Nos. 803, 1121, 2106, and 2661, respectively), nor our September 16, 2020 letter regarding overdue items for the Rock Creek-Cresta and Poe Project (FERC Project Nos. 1962 and 2107, respectively). ponses to both letters are now overdue. For convenience, the overdue items included in our July 20, 2020 and September 16, 2020 letters which remain outstanding are also listed in the enclosure. Within 45 days of the date of this letter, please submit the overdue items listed in the enclosure or an updated plan and schedule to address the items. PG&E is reminded that submitting required dam safety-related items or extension of time requests to address the items in a timely manner is a matter of compliance with the project licenses. 2 We appreciate your continued safety program. If you have questions, please contact me at (415) 369-3318. Sincerely, Frank L. Blackett, P.E. Regional Engineer Enclosure Overdue Items for PG&E Projects Enclosure FERC Project Nos. 77, 137, 175, 233, 619, 803, 1061, 1121, 1354, 1403, 1962, 1988, 2105, 2106, 2107, 2130, 2155, 2310, 2687, and 2735 Overdue Items Related to 2019 EAP Status Reports (P77, P137, P175, P233, P619, P803, P1061, P1121, P1403, P1962, P1988, P2105, P2106, P2130, P2155, P2310, P2687, and P2735): 1. Due by 8/30/20. Overdue Items Related to 10-Year Spillway Radial Gate Inspection Reports (GIRs) for the Potter Valley (P77), Mokelumne River (P137), Rock Creek-Cresta (P1962), Upper North Fork Feather River (P2105), Drum-Spaulding (P2310), and Pit No. 1 (P2687) Projects: 2. 10-year GIRs for Scott Dam (P77), Tiger Creek Afterbay Dam (P137), Rock Creek Dam (P1962), and Fordyce Dam (P2310): Due by 10/2/20, according to 3. 10-year GIRs for Cresta Dam (P1962), Belden Dam (P2105), and Pit No. 1 Forebay Dam (P2687): Due by 10/30/20 Overdue Items for the Potter Valley Project (P77): 4. Plan and schedule for addressing the follow-up items from the 2019 FERC annual dam safety inspection: Due by 3/3/20 (no response received to FER follow-up letter). 5. Updated plan and schedule to address 2014 Tenth Part 12D recommendations for Scott Dam (R-8, R-13, R-39, R-66, R-70): Due by 5/2/20 6. Response to FERC comments on the preparation package for the March 4, 2020 SSPMP/PMF BOC conference call: Due by 6/14/20 (no response received to ). 7. Updated STID Section 3 associated with 2019 Eleventh Part 12D recommendation R-27: Due by 9/30/20 Overdue Items for the Balch Project (P175): 8. Updated plan and schedule to provide STID revisions to address 2019 Eleventh Part 12D recommendations for Balch Diversion (R-1, R-2, R-8, R-10, R-11) and 1 of 9 Overdue Items for PG&E Projects Enclosure FERC Project Nos. 77, 137, 175, 233, 619, 803, 1061, 1121, 1354, 1403, 1962, 1988, 2105, 2106, 2107, 2130, 2155, 2310, 2687, and 2735 Balch Afterbay (R-1, R-9, R-10): Due by 4/30/20, and 2/10/20 letters. 9. Updated plan and schedule to submit updated erodibility assessment reports associated with 2019 Eleventh Part 12D recommendation R-6 for both Balch Diversion and Balch Afterbay: Due by 5/31/20, 2/10/20 letters. 10. Results of data collection efforts as a first step to address 2019 Eleventh Part 12D recommendations for Balch Diversion (R-7, R-13, R-14) and Balch Afterbay (R-7, R-11, R-12): Due by 9/30/20 11. Results of documentation review related to Balch Diversion recommendation R- 12: Due by 9/30/20, accordin Overdue Items Related to Probable Maximum Flood (PMF) and Wind-Wave Studies for Selected Dams in the McCloud River, Pit River, and Battle Creek Watersheds (P233, P1121, P2106, and P2687): 12. Evaluation of potential effects of overtopping at several of the dams and a plan and schedule for mitigating against any adverse effects: Due by 7/13/20 (no . 13. Per December 20, 2019 plan and schedule, the following items were to be completed within 90 days of FERC acceptance of the PMF and wind-wave studies, or by 8/27/20: a. A plan and schedule for updating the Supporting Technical Information Documents (STIDs) for Pit No. 3 Diversion and Pit No. 5 Open Conduit (P233), North Battle Creek and Macumber (P1121), McCloud and Iron Canyon (P2106), and Pit No. 1 Forebay (P2687) Dams. b. A plan and schedule for determining whether the PMF is the appropriate Inflow Design Flood (IDF) for North Battle Creek Dam (P1121). c. A plan and schedule for performing hydraulic analyses of the spillway at Macumber Dam (P1121). d. A plan and schedule for evaluating potential measures to mitigate against overtopping at Macumber Dam (P1121). 2 of 9 Overdue Items for PG&E Projects Enclosure FERC Project Nos. 77, 137, 175, 233, 619, 803, 1061, 1121, 1354, 1403, 1962, 1988, 2105, 2106, 2107, 2130, 2155, 2310, 2687, and 2735 e. A plan and schedule for performing a stability analysis of the masonry spillway section during hydrologic loading at Macumber Dam (P1121). f. A plan and schedule for determining whether the PMF is the appropriate IDF for Iron Canyon Dam (P2106). g. A plan and schedule for developing the flow profile in the spillway at Pit No. 1 Forebay Dam (P2687). Overdue Items Related to the 2019 Annual Spillway Gate Operation Certificates for the Pit No. 3, 4, and 5 (P233), McCloud-Pit (P2106), and Pit No. 1 (P2687) Projects: 14. Response to FERC comments on the 2019 annual spillway gate operation certificates: Due by 10/25/20 Overdue Items for the Pit No. 3, 4, and 5 Project (P233): 15. Fault 3432 Potential Failure Modes Analysis (PFMA) workshop report for Pit No. 3 Dam: Due by 6/30/20 16. Plan and schedule for addressing damaged areas downstream from Pit No. 3 and Pit No. 5 Diversion Dams: Due by 9/27/20 8/13/20 letter). 17. Plan and schedule for completing the recommendations from the Focused Spillway Assessment for Pit No. 5 Open Conduit Dam: Due by 10/2/20 (no Overdue Items for the DeSabla-Centerville Project (P803): 18. Revised Drilling Program Plan (DPP) for Round Valley Dam: Due by 5/17/19 (no . (Note: This item was included in 19. Revised DPP for Philbrook Dam: Due by 6/17/19 (no response received to . (Note: and it remains outstanding.) 20. More information regarding temporary erosion measures to be installed on downstream face of DeSabla Forebay Dam, and obtain FERC authorization prior to beginning the work: Due by 12/7/19 3 of 9 Overdue Items for PG&E Projects Enclosure FERC Project Nos. 77, 137, 175, 233, 619, 803, 1061, 1121, 1354, 1403, 1962, 1988, 2105, 2106, 2107, 2130, 2155, 2310, 2687, and 2735 letter). (Note: outstanding.) 21. Selected alternative for long-term erosion mitigation on the downstream face of DeSabla Forebay Dam: Due by 4/15/20. (Note: outstanding.) 22. Repair plan to address the seep at Hendricks Head Dam: Due by 6/30/20, 23. Construction package for a new log boom system at Round Valley Dam: Due by 7/31/20. 24. Plan and schedule for completing the recommendations from the Focused Spillway Assessment for Round Valley Dam: Due by 8/28/20 (no response received to 25. Memorandum/a regarding subterranean water flow and plan and schedule for completing the recommendations from the Focused Spillway Assessment for Philbrook Dam: Due by 8/28/20 Overdue Items for the Phoenix Project (P1061): 26. Resource agency documentation for the Phoenix Powerhouse Ground Grid Safety Improvements: Due by 9/19/20 (no response received to ). Overdue Items for the Battle Creek Project (P1121): 27. Final Construction Report for Coleman Intake Siphon No. 1 Automated Trashrake Project: Due within 90 days following the completion of construction, as (should have been submitted by December 2019 based on estimated September 2019 project completion). (Note: remains outstanding.) 28. Results of 2019 Coleman Forebay subsurface investigations, including a plan and schedule for completing seepage and stability analyses: Due by 1/31/20, according . (Note: 7/20/20 letter, and it remains outstanding.) 4 of 9 Overdue Items for PG&E Projects Enclosure FERC Project Nos. 77, 137, 175, 233, 619, 803, 1061, 1121, 1354, 1403, 1962, 1988, 2105, 2106, 2107, 2130, 2155, 2310, 2687, and 2735 29. Final Construction Report for Battle Creek Salmon and Steelhead Restoration Project, Phase 1B: Due by 2/10/20. (Note: 30. 2020 Spillway Toe Evaluation Report for Macumber Dam: Due by 10/31/20, as Overdue Items for Crane Valley Project (P1354): 31. Status update and plan and schedule for completing the outlet tower retrofit design at Crane Valley Dam: Due by 4/30/20 Overdue Items for the Rock Creek-Cresta Project (P1962): 32. Plan and schedule for addressing the follow-up items from the 2019 FERC annual dam safety inspection: Due by 4/27/20 3/12/20 follow-up letter). (Note: remains outstanding.) Overdue Items for the Haas-Kings River Project (P1988): 33. Updated plan and schedule to provide STID Section 4 revision for Wishon Dam (Eleventh Part 12D recommendation R-10): Due by 4/30/20, according to 34. Feasibility study for modifying the parapet wall manways at Courtright Dam (Eleventh Part 12D recommendation R-7): Due by 9/30/20 2/10/20 letter. 35. Results of data collection efforts as a first step to evaluating the potential for overtopping at Courtright Dam (Eleventh Part 12D recommendation R-8): Due by 9/30/20 36. Investigation and evaluation report for the LLO butterfly valve seat ring bolt failure at Wishon Dam (Eleventh Part 12D recommendation R-7): Due by 9/30/207/20 letter. 37. Feasibility study for modifying the parapet wall manways at Wishon Dam (Eleventh Part 12D recommendation R-8): Due by 9/30/20, according to 2/7/20 letter. 5 of 9 Overdue Items for PG&E Projects Enclosure FERC Project Nos. 77, 137, 175, 233, 619, 803, 1061, 1121, 1354, 1403, 1962, 1988, 2105, 2106, 2107, 2130, 2155, 2310, 2687, and 2735 38. Results of data collection efforts as a first step to evaluating the potential for overtopping at Wishon Dam (Eleventh Part 12D recommendation R-11): Due by 9/30/207/20 letter. 39. Plan and schedule to address Focused Spillway Assessment Report recommendations for Courtright and Wishon Dams: Due by 10/31/20 (no response received to ). Overdue Items for the McCloud-Pit Project (P2106): 40. Final Construction Report for Iron Canyon Right Abutment Storm Damage Repair: Due within 90 days following the completion of construction, as submitted by 11/16/19 based on 8/16/19 project completion). (Note: This item 41. Geotechnical Data Report for Iron Canyon Post-Construction Instrumentation Installation: No specific due date but should have been submitted in November 2019 according . (Note: outstanding.) 42. Updated structural analysis and plan and schedule for completing an alternatives analysis for retrofit of the spillway radial gates at Pit No. 7 Dam: Due by 6/30/20, 43. Updated structural analysis and plan and schedule for completing an alternatives analysis for retrofit of the spillway radial gates at Pit No. 6 Dam: Due by 10/31/20 44. Alternatives analysis report and status update to support remediation of the McCloud spillway: Due by 10/31/20 45. Final Construction Report for Pit No. 6 Spillway Apron Repair Project: Due by 10/31/20(Note: This item was included in outstanding.) 6 of 9 Overdue Items for PG&E Projects Enclosure FERC Project Nos. 77, 137, 175, 233, 619, 803, 1061, 1121, 1354, 1403, 1962, 1988, 2105, 2106, 2107, 2130, 2155, 2310, 2687, and 2735 Overdue Items for the Poe Project (P2107): 46. Plan and schedule for addressing the follow-up items from the 2019 FERC annual dam safety inspection: Due by 5/21/20 follow-up letter). (Note: remains outstanding.) Overdue Items for the Spring Gap-Stanislaus Project (P2130): 47. Updated stability analyses of the spillway at Strawberry Dam (Eleventh Part 12D recommendation R-6): Due by 4/30/20 48. Plan and schedule to address Focused Spillway Assessment Report recommendations for Relief and Strawberry Dams: Due by 10/31/20 (no response received to /16/20 letter) Overdue Items for the Drum-Spaulding Project (P2310): 49. Plan and schedule for addressing follow-up items No. 16 and 17 (for Rock Creek and Wise Forebay Dams, respectively) from the 2018 FERC annual dam safety inspection: Due by 12/21/18 (no response received on these items 11/6/18 follow-up letter). 50. Evaluation of the feasibility of installing a weir to measure seepage through the left abutment of Lake Spaulding Dam No. 1 (Tenth Part 12D recommendation R- 8): Due by 1/31/20 51. Plan and schedule to address recommendations from and FERC comments on the Focused Spillway Assessment for Halsey Afterbay Dam: Due by 2/22/20 (no 52. Plan and schedule to address recommendations from and FERC comments on the Focused Spillway Assessment for Halsey Forebay Dam No. 1: Due by 2/22/20 (no 53. Response to FERC comments on the 2019 annual spillway gate operation certificates for Lake Fordyce, Lake Spaulding No. 2, and Drum Afterbay Dams: Due by 3/14/20 1/29/20 letter). 7 of 9 Overdue Items for PG&E Projects Enclosure FERC Project Nos. 77, 137, 175, 233, 619, 803, 1061, 1121, 1354, 1403, 1962, 1988, 2105, 2106, 2107, 2130, 2155, 2310, 2687, and 2735 54. Seismic stability and deformation analysis for Upper Peak Lake Dam (Eleventh Part 12D recommendation R-3): Due by 3/31/20 letter. 55. Response to FERC comments on the structural analysis of the rear valve house wall at Lake Fordyce Dam: Due by 5/1/20 3/17/20 letter). 56. Assess the appropriate monitoring frequency for obtaining accurate readings of Weir YB-12A at Fuller Lake Dam: Due by 5/9/20 (no response received to 57. Assess seepage flow monitoring options following rehabilitation of the spillway and masonry wall at Upper Peak Lake Dam: Due by 5/9/20 (no response received 58. Supplement to Liquefaction Sensitivity Seismic Stability Study for Meadow Lake Dam (Tenth Part 12D recommendation R-7): Due by 6/8/20 (no response received 59. the weirs downstream from Lake Spaulding Dam No. 3 (Ninth Part 12D recommendation R- 1.3.4.5): Due by 6/8/20 60. Hydraulic sensitivity analysis for Wise Forebay Dam (Fourth Part 12D recommendation R-1): Due by 6/8/20 letter). 61. Plan and schedule for upgrading the instrumentation and monitoring systems, adding an automatic shutoff at the intake, and/or improving the downstream spill channel at Wise Forebay Dam (Fifth Part 12D recommendations R-4, R-6, and R- 7, respectively): Due by 7/31/20 62. Review of the static stability analysis for the right abutment section at Halsey Forebay Dam No. 1 (Eighth Part 12D recommendation R-11): Due by 8/28/20, 63. Confirmation of whether the material properties used in the 1999 Stability and Deformation Analysis of the Modified Embankment for Halsey Forebay Dam No. 2 are valid: Due by 8/29/20 8 of 9 Overdue Items for PG&E Projects Enclosure FERC Project Nos. 77, 137, 175, 233, 619, 803, 1061, 1121, 1354, 1403, 1962, 1988, 2105, 2106, 2107, 2130, 2155, 2310, 2687, and 2735 64. Internal video inspection report for the subdrain system at Halsey Forebay Dam No. 2 (Eighth Part 12D recommendation R-6): Due by 9/30/20, according to 65. Review of existing information regarding subsurface conditions and the liquefaction susceptibility of the foundation materials beneath Halsey Forebay Dam No. 1 (Eighth Part 12D recommendation R-1): Due by 11/1/20, according to 66. Review of existing information regarding subsurface conditions and the expected seismic performance of the foundation materials beneath Wise Forebay Dam (Fifth Part 12D recommendation R-10): Due by 11/1/20 2/28/20 letter. Overdue Items for the Pit No. 1 Project (P2687): 67. Plan and schedule for addressing comments from the Ninth Part 12D report for Pit No. 1 Forebay Dam: Due by 6/12/20 letter). 68. Supplemental spillway inspection report and plan and schedule for completing the recommendations from the Focused Spillway Assessment for Pit No. 1 Forebay Dam: Due by 10/30/20 9 of 9