Loading...
HomeMy WebLinkAbout11.24.20 Board Correspondence - FW_ Project Safety Compliance Report submitted in FERC P-2088-000 by Individual No Affiliation,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:Board Correspondence - FW: Project Safety Compliance Report submitted in FERC P-2088-000 by Individual No Affiliation,et al. Date:Tuesday, November 24, 2020 12:22:26 PM Good afternoon, Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, November 24, 2020 12:05 PM Subject: Project Safety Compliance Report submitted in FERC P-2088-000 by Individual No Affiliation,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/24/2020, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Individual No Affiliation South Feather Water & Power Agency (as Agent) Docket(s): P-2088-000 Lead Applicant: South Feather Water and Power Agency Filing Type: Project Safety Compliance Report Description: Phase III Spillway Assessment for Little Grass Valley Dam Inspection Report under P-2088. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20201124- 5115__;!!KNMwiTCp4spf!Vsf5j64dcYzWv98xDhVzoGEDCMzh09KQUwqiukylDtwYNdY1M1pYWGCLi4n7cR_cHs2SwoHQ15E$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Vsf5j64dcYzWv98xDhVzoGEDCMzh09KQUwqiukylDtwYNdY1M1pYWGCLi4n7cR_cHs2SjkTZL5I$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Vsf5j64dcYzWv98xDhVzoGEDCMzh09KQUwqiukylDtwYNdY1M1pYWGCLi4n7cR_cHs2SfObRlEE$ or for phone support, call 866-208-3676. November 23, 2020 Electronically Filed Frank L. Blackett, P.E., Regional Engineer 100 First Street, Suite 2300 San Francisco, CA 94105 RE: South Feather Power Project (FERC No. 2088) Little Grass Valley Dam Phase 3 Spillway Inspection Report Dear Mr. Blackett, While preparing a response to your letter dated October 1, 2020 requesting a status update on the independent consultant’s recommendation to the STID and DSSMP at Sly Creek Dam, it was noted that this Agency has not received follow-up correspondence or acceptance of the June 2019 Phase 3 Spillway Assessment for Sly Creek Dam or Little Grass Valley Dam, compiled by McMillen Jacobs and Associates. Due to staff turnover, it is possible that the reports were not properly submitted to you, therefore, the Sly Creek Dam report was submitted on November 13, and this transmittal accompanies the submission of the Little Grass Valley Dam spillway assessment for your review. If you have any questions related to this transmittal, please feel free to contact me at (530) 534-1221 x 265, or via email at kmckillop@southfeather.com. Sincerely, South Feather Water and Power Agency Kristen McKillop Regulatory Compliance c. Rath Moseley, General Manager Dan Leon, Power Division Manager