HomeMy WebLinkAbout11.24.20 Board Correspondence -FW_ Project Safety Compliance Report submitted in FERC P-1061-019,et al. by Pacific Gas and Electric Company,et al. (2)
From:Schuman, Amy
To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Lambert, Steve;Lucero, Debra;
McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;
Teeter, Doug
Subject:Board Correspondence -FW: Project Safety Compliance Report submitted in FERC P-1061-019,et al. by Pacific
Gas and Electric Company,et al.
Date:Tuesday, November 24, 2020 10:33:38 AM
Please see the email below from FERC.
Amy Schuman
Associate Clerk of the Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120
Twitter | Facebook | YouTube | Pinterest
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, November 17, 2020 9:16 AM
Subject: Project Safety Compliance Report submitted in FERC P-1061-019,et al. by Pacific Gas and Electric
Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 11/16/2020, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC),
Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas and Electric Company (as Agent)
Docket(s): P-1061-019
P-1121-000
P-1354-000
P-137-000
P-1988-000
P-2105-000
P-2130-000
P-2310-000
P-233-000
P-2661-000
P-2687-000
P-2735-000
P-77-001
P-803-000
P-96-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Project Safety Compliance Report
Description: Pacific Gas and Electric Company submits the 2021 Planned Outage Schedule for the Pit - Upper
Hydroelectric Project et al, under P-77, et al.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20201116-
5278__;!!KNMwiTCp4spf!V5mUKjfdeW6O-
Gw4kEZHR63J_ZA52jrIzvnPlwU1a1kVQd1bnaqTyr4yLUwTLiyHaYs9DU__ntE$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!V5mUKjfdeW6O-
Gw4kEZHR63J_ZA52jrIzvnPlwU1a1kVQd1bnaqTyr4yLUwTLiyHaYs9tGuUUts$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!V5mUKjfdeW6O-
Gw4kEZHR63J_ZA52jrIzvnPlwU1a1kVQd1bnaqTyr4yLUwTLiyHaYs9QHCBlwE$
or for phone support, call 866-208-3676.
Power Generation 245 Market Street
San Francisco, CA 94105
Mailing Address:
Mail Code N11D
P.O. Box 770000
San Francisco, CA 94177
November 16, 2020
Via Electronic Submittal (E-File)
Mr. Frank Blackett, P.E., Regional Engineer
San Francisco Regional Office
Federal Energy Regulatory Commission
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: 2021 Planned Outage Schedule
FERC Nos. 77; 96; 137; 233; 803; 1061; 1121; 1354; 1988; 2105; 2130; 2310;
2661; 2687; 2735
Dear Mr. Blackett:
The purpose of this letter is to provide the Federal Energy Regulatory Commission (FERC)
with Pacific Gas and Electric Company's (PG&E) schedule of planned outages in 2021,
which will require dewatering of tunnels, conduits, or penstocks. Enclosed is the outage list
for your review.
The routine maintenance outages will follow prior executed procedures that have previously
been coordinated with your office. Please note that this list is subject to change based on
weather, staffing schedules, water conditions, and other factors that may be beyond PG&E's
control. If changes occur, which impact the planned outages, your staff will be kept
informed.
Should you have any questions or comments, please do not hesitate to contact me at (415)
531-5186.
Sincerely,
Elisabeth Rossi
Supervisor, Hydro Licensing
Enclosure
Enclosure
Page 1
SHASTA AREA
FERC No. REGIONLOCATION DESCRIPTION OF WORK De-Watered Start DateEnd Date
2687Pit -UpperPIT 1 PH U1 -Annual, Penstock9/2/204/30/21
32MW • Rewind/Restack/Pole
Refurb,
• Lower Guide Bearing
Work,
• Gen Relays
• Replace Roof over 11KV
Swgr
• load controller
replacement (dual-unit
outage required)
Possible Cooper RTU
Upgrade
2661 Pit - UpperHAT CREEK PH U2 Annual, GSU transformer Penstock2/15/215/14/21
- 8.5MW replacement, Ohio Brass
replacement, SCADA D20
to Cooper SMP Rpl,
Runner Repairs
1121 Battle Creek CROSS COUNTRY Canal annual / Flume Canal 4/5/21 4/30/21
CANAL Sheets
1121 Battle Creek VOLTA 2 CANAL Canal annualCanal 4/5/21 4/25/21
1121 Battle Creek VOLTA 1 PH U1Annual Al Smith & 4/5/21 4/25/21
Keswick Canal
606 Kilarc- Cow COW CREEK Canal annualCanal 5/17/215/30/21
CANAL
2687 Pit - UpperPIT 1 PH U2 - Annual, Gen Relay Penstock7/1/21 10/17/21
32MW replacement
1121 Cow-Battle COLEMAN CANAL Canal annualCanal 8/2/21 8/22/21
Creek
0233Pit -LowerPIT 5 PH U4 -Annual -Wicket Gate, Penstock9/20/2112/18/21
41MW facing plate and seal ring
Replacement,
Transformer work
DESABLA AREA
FERC No. REGION LOCATION DESCRIPTION OF WORK De-Watered Start DateEnd Date
2105 Feather -Upper CARIBOU PH 1 U1 Cooling Water Repairs & Penstock1/29/212/9/21
- 24MW Bus Differential testing
requires all unit outage.
Possible Generator
Breaker Replacement
Enclosure
Page 2
2105 Feather -Upper CARIBOU PH 1 U3 Minor Annual, Bucket Penstock1/29/212/23/21
- 24.5MW and Needle Repairs
(Cooling Water Repairs &
Bus Differential testing
requires all unit outage)
Possible Generator
Breaker Replacement
803 Camp 1 BUTTE CANAL Canal annualCanal 3/8/21 4/1/21
803 Camp 1 U CENTERVILLE Canal Annual Canal 3/8/21 4/4/21
CANAL
803 Camp 1 HENDRICKS Canal annual, Canal 4/1/21 5/13/21
CANAL Undermining Repairs and
Liner Repairs, Erosion
Control, Handicap
Repairs
803 Camp 1 TOADTOWN Canal annualCanal 4/1/21 5/13/21
CANAL
2105 Feather -Upper CARIBOU PH 1 U2 Bucket and Needle Penstock6/14/216/21/21
- 24.5MW Repair
2105 Feather -Upper CARIBOU PH 1 U3 Bucket and Needle Penstock6/22/216/29/21
- 24.5MW Repairs
77 Feather -Upper POTTER VALLEY Annual, Breaker work, Penstock7/11/218/6/21
PH U1 - 4.5MW
77 Feather -Upper POTTER VALLEY Annual, Breaker work, Penstock7/11/218/6/21
PH U3 - 2.5MW
77 Feather -Upper POTTER VALLEY Annual, Breaker work, Penstock7/11/218/6/21
PH U4 - 3MW
2105 Feather -Upper CARIBOU PH 1 U2 Bucket and Needle Penstock10/11/21 10/22/21
- 24.5MW Repair, U1 Startup
Testing
2105 Feather -Upper CARIBOU PH 1 U3 Bucket and Needle Penstock10/11/21 10/22/21
- 24.5MW Repair, U1 Startup
Testing
2105 Feather -Upper CARIBOU PH 1 U1 Cooling Water Repairs & Penstock1/29/212/9/21
- 24MW Bus Differential testing
requires all unit outage.
Possible Generator
Breaker Replacement
Enclosure
Page 3
2105 Feather -Upper CARIBOU PH 1 U3 Minor Annual, Bucket Penstock1/29/212/23/21
- 24.5MW and Needle Repairs
(Cooling Water Repairs &
Bus Differential testing
requires all unit outage)
Possible Generator
Breaker Replacement
CENTRAL AREA
FERC No. REGION LOCATION DESCRIPTION OF WORK De-Watered Start DateEnd Date
2310 Drum -UpperDRUM PH 1 U1 - Annual, Replace TSV By-Penstock1/4/21 1/24/21
12MW pass
2310 Drum -UpperDRUM PH 1 U3 - Annual - Penstock joint Penstock2/1/21 2/21/21
12MW repairs
2310 Drum -UpperDRUM PH 1 U4 - Annual - Penstock joint Penstock2/1/21 2/21/21
17MW repairs
2310 Drum -UpperDUTCH FLAT PH Annual Tunnel, Penstock 3/1/21 3/21/21
U1 - 22MW
2310 Drum -UpperSo. YUBA CANAL Canal annualCanal 3/22/214/11/21
2310 Drum -LowerHALSEY PH U1 - • Annual, Penstock4/5/21 12/31/21
13.5MW • Runner and Wicket
Gates Replacement
• Reinsulate Field Poles
2310 Drum -UpperALTA U1 -1MW Annual, Penstock/forebay 5/10/215/23/21
draw down (need
to coordinate with
PCWA)
2310 Drum -UpperTOWLE CANAL Canal annualPenstock/forebay 5/10/215/23/21
draw down (need
to coordinate with
PCWA)
2310 Drum -UpperSPAULDING 3 PH Annual, Switchgear Penstock5/24/218/7/21
U1 - 6.5MW Replacement. Possible
RIG outage
2310 Drum -UpperLAKE VALLEY CNL Canal annualCanal 6/21/217/2/21
2310 Drum -LowerNEWCASTLE PH Annual, TSV Seal, Cooling Penstock8/1/21 8/26/21
U1 - 12MW Water Flow Meters
2310 Drum -UpperDRUM CANAL Canal annual, YB-93 Canal 9/13/2110/3/21
upgrade (need to
coordinate with PCWA)
2310 Drum -LowerBEAR RIVER Canal annualCanal 10/15/21 11/24/21
CANAL
2310 Drum -LowerSOUTH CANAL Canal annualCanal 10/15/21 11/24/21
Enclosure
Page 4
2310 Drum -LowerWISE CANAL Canal annualCanal 10/15/21 11/24/21
137 Motherlode ELECTRA PH U2 - RewindPenstock10/4/203/12/21
30MW
137 Motherlode WEST POINT PH Annual, PSV Tunnel, Penstock 4/5/21 5/10/21
U1 - 14MW inspection/tunnel
drain/Penstock
Inspection
2130 Motherlode PHILIDELPHIA Canal annualCanal 8/16/219/10/21
DITCH
137 Motherlode SALT SPRINGS PH Annual Tunnel Penstock 10/4/2110/24/21
U2 - 34MW
1061 Motherlode MAIN TUOLOMNE Canal annualCanal 10/4/2110/17/21
SOUTH AREA
FERC No. REGION LOCATION DESCRIPTION OF WORK De-Watered Start DateEnd Date
96 Kings - Crane KERCKHOFF PH 2 • Annual, Tunnel 1/4/21 4/30/21
Valley U1 - 154MW • Alignment Check (Need Penstock
to add project, data
needs to be analyzed)
• Runner Welding
• Tunnel
Drain/Inspection
•TSV seal replacement
• TSV actuator overhaul
• TSV shuttle valves and
strainer (need a project)
• Major draft tube
repairs (replace O-ring)
• Penstock Root Valve
replacement
• De-watering valves and
other key valves
• Replace Main Guide
Bearing RTD’s ( oil
wicking out of RTD
Sleeve on main bearing
tub)
•Upper tub oil sampling
port (install)
•Kidney loop system
• Gen Relay and Xfmr
Relay Mgmt. System
1354 Kings - Crane A.G. WISHON PH Annual Penstock7/5/21 8/29/21
Valley U3 - 3.2MW
1354 Kings - Crane A.G. WISHON PH Annual, Needle Penstock 7/5/21 8/29/21
Valley U4 - 3.2MW maintenance
1354 Kings - Crane DITCH #1 Canal annualCanal 7/5/21 8/15/21
Valley
Enclosure
Page 5
1354 Kings - Crane DITCH #2 Canal annualCanal 7/5/21 8/15/21
Valley
1354 Kings - Crane DITCH #3 Canal annualCanal 7/5/21 8/15/21
Valley
1354 Kings - Crane BROWNS DITCH Canal annualCanal 8/23/2110/1/21
Valley
1988 Kings - Crane HAAS PH U1 -Annual, Penstock Drain Penstock11/29/21 1/23/22
Valley 72MW to allow TSV strainer
Replacement and Field
Poles to be brought in
through the tailrace
2735 HelmsHELMS PH U2 - ROV Tunnel Inspection (3 Tunnel, Penstock 10/3/2110/8/21
407MW unit outage)
2735 HelmsHELMS PH U3 - ROV Tunnel Inspection (3 Tunnel, Penstock 10/3/2110/8/21
407MW unit outage)
2735HelmsHELMS PH U1 - Breaker Maintenance Tunnel, Penstock 10/3/2110/11/21
407MW (Mech heads and
interruptors) ROV Tunnel
Inspection (3 unit
outage)