HomeMy WebLinkAbout11.30.20 Board Correspondence - FW_ Project Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
From:Schuman, Amy
To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Lambert, Steve;Lucero, Debra;McCracken,
Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug
Subject:Board Correspondence - FW: Project Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric
Company,et al.
Date:Monday, November 30, 2020 1:56:27 PM
Please see the email below from FERC.
Amy Schuman
Associate Clerk of the Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120
Twitter | Facebook | YouTube | Pinterest
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, November 30, 2020 12:35 PM
Subject: Project Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments,
clicking on links, or replying..
On 11/30/2020, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
No Organization Found (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Project Safety Compliance Report
Description: Pacific Gas and Electric Company submits the Monthly Construction Status Report No. 6 - Lower Bucks Dam
Upstream Geomembrane Project for the Bucks Creek Hydro Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20201130-5213__;!!KNMwiTCp4spf!Q5H37OyNSzM5B1_UJ2JzE1-WjkrvUJVn_UU-
Yh7CUTtDOqagFZZEui1wp89IECYSikKfDOHPEg4$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Q5H37OyNSzM5B1_UJ2JzE1-
WjkrvUJVn_UU-Yh7CUTtDOqagFZZEui1wp89IECYSikKfrV4rQbQ$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Q5H37OyNSzM5B1_UJ2JzE1-
WjkrvUJVn_UU-Yh7CUTtDOqagFZZEui1wp89IECYSikKfwiNqy0M$
or for phone support, call 866-208-3676.
November 30, 2020
Via Electronic Submittal (E-File)
Mr. Frank L. Blackett, P.E.
Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105
RE: Bucks Creek Hydroelectric Project (FERC No. 619)
Monthly Construction Status Report No. 6 Lower Bucks Dam Upstream
Geomembrane Project
ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE
Dear Mr. Blackett:
Monthly Construction
Status Report for the Lower Bucks Dam Upstream Geomembrane Project
Bucks Creek Hydroelectric Project (FERC No. 619). A May 7, 2020 letter from the Federal
Energy Regulatory Commission (FERC) provided PG&E authorization to proceed with the
project and also requested that PG&E file monthly reports to document the progress of
construction.
Enclosed you will find a copy of the sixth monthly construction report for the Lower Bucks
Dam Upstream Geomembrane Project which details the construction activities during the
month of October 2020.
senior project engineer, Jeff Jukkola, at (530) 624-8640. For general questions, please
senior license coordinator, Jamie Visinoni, at (530) 215-6676.
Sincerely,
Elisabeth Rossi
Supervisor, Hydro Licensing
Enclosure: CUI//CEII DO NOT RELEASE