Loading...
HomeMy WebLinkAbout11.30.20 Board Correspondence - FW_ Project Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:Board Correspondence - FW: Project Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Monday, November 30, 2020 1:56:27 PM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, November 30, 2020 12:35 PM Subject: Project Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/30/2020, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Safety Compliance Report Description: Pacific Gas and Electric Company submits the Monthly Construction Status Report No. 6 - Lower Bucks Dam Upstream Geomembrane Project for the Bucks Creek Hydro Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20201130-5213__;!!KNMwiTCp4spf!Q5H37OyNSzM5B1_UJ2JzE1-WjkrvUJVn_UU- Yh7CUTtDOqagFZZEui1wp89IECYSikKfDOHPEg4$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Q5H37OyNSzM5B1_UJ2JzE1- WjkrvUJVn_UU-Yh7CUTtDOqagFZZEui1wp89IECYSikKfrV4rQbQ$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Q5H37OyNSzM5B1_UJ2JzE1- WjkrvUJVn_UU-Yh7CUTtDOqagFZZEui1wp89IECYSikKfwiNqy0M$ or for phone support, call 866-208-3676. November 30, 2020 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E. Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105 RE: Bucks Creek Hydroelectric Project (FERC No. 619) Monthly Construction Status Report No. 6 Lower Bucks Dam Upstream Geomembrane Project ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE Dear Mr. Blackett: Monthly Construction Status Report for the Lower Bucks Dam Upstream Geomembrane Project Bucks Creek Hydroelectric Project (FERC No. 619). A May 7, 2020 letter from the Federal Energy Regulatory Commission (FERC) provided PG&E authorization to proceed with the project and also requested that PG&E file monthly reports to document the progress of construction. Enclosed you will find a copy of the sixth monthly construction report for the Lower Bucks Dam Upstream Geomembrane Project which details the construction activities during the month of October 2020. senior project engineer, Jeff Jukkola, at (530) 624-8640. For general questions, please senior license coordinator, Jamie Visinoni, at (530) 215-6676. Sincerely, Elisabeth Rossi Supervisor, Hydro Licensing Enclosure: CUI//CEII DO NOT RELEASE