Loading...
HomeMy WebLinkAbout11.30.20 Board Correspondence - FW_ Project Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:Board Correspondence - FW: Project Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Monday, November 30, 2020 4:07:24 PM Good afternoon, Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, November 30, 2020 3:25 PM Subject: Project Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/30/2020, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Safety Compliance Report Description: Pacific Gas and Electric Company submits the Temporary Erosion Controls for the DeSabla-Centerville Hydro Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20201130- 5314__;!!KNMwiTCp4spf!WkFkfcA9Y3UCsxgP0XXa2JQ2jR5K3p4t8Ihfk6BpMZO68gCmp0XagjzE07cKOyXiJCmsnHLyGh4$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!WkFkfcA9Y3UCsxgP0XXa2JQ2jR5K3p4t8Ihfk6BpMZO68gCmp0XagjzE07cKOyXiJCmsuSu6GdY$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!WkFkfcA9Y3UCsxgP0XXa2JQ2jR5K3p4t8Ihfk6BpMZO68gCmp0XagjzE07cKOyXiJCmscKBetzI$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 November 30, 2020 Via Electronic Submittal (E-File) Mr. Frank Blackett, P.E. Regional Engineer Federal Energy Regulatory Commission San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Project, FERC No. 803-CA DeSabla Forebay Dam, NATDAM No. CA00343 Temporary Erosion Controls ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE Dear Mr. Blackett: This letter presents notification of Pacific Gas and Electric plans to install temporary erosion controls at DeSabla Forebay Dam, which is part of DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. In recent years, inspections of DeSabla Forebay Dam have identified areas with limited or no vegetative cover and erosion rills on the downstream face of the dam. PG&E plans to install temporary erosion control measures (e.g., straw wattles/fiber rolls) to limit the potential for additional erosion until permanent mitigation measures can be implemented. Additional background and details on the proposed temporary erosion control installation are enclosed for FERCreview (Enclosure 1). In a letter to your office, dated June 26, 2019, PG&E provided a plan and schedule to address action items identified in the 2018 annual FERC inspection of the DeSabla- Centerville Project. One of the action items included long-term mitigation measures to address the erosion-prone downstream face of the dam. PG&E planned to perform an analysis of alternatives in the first quarter of 2020 and file a status update and information pertaining to the selected alternative with FERC by April 15, 2020. However, the analysis of alternatives was delayed due to impacts from the COVID-19 pandemic. PG&E currently plans to complete the analysis and submit a plan and schedule for installing the long-term erosion protection measures to FERC by January 15, 2021. Mr. Frank Blackett, P.E., Regional Engineer November 30, 2020 Page 2 dam safety engineer, Ms. Aimee Corn, at (530) 894-4792. For general questions, please license coordinator, Ms. Jamie Visinoni, at (530) 215-6676. Sincerely, David L. Ritzman, P.E., G.E. Chief Dam Safety Engineer Enclosure: (CUI//CEII DO NOT RELEASE) 1. DeSabla Forebay Dam Temporary Erosion Mitigation