Loading...
HomeMy WebLinkAbout12.02.20 Board Correspondence - FW_ Emergency Action Plan submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:Board Correspondence - FW: Emergency Action Plan submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Wednesday, December 2, 2020 1:02:49 PM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, December 2, 2020 11:45 AM Subject: Emergency Action Plan submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/2/2020, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas and Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Emergency Action Plan Description: Pacific Gas and Electric Company submits the 2020 Emergency Action Plan Update for the Bucks Creek Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20201202- 5124__;!!KNMwiTCp4spf!Wap2Hes_3fnC7N6BLwNznCxFPfpLD0iMEAXVuo6HWiGvrQbjjG7sJqTlpko-BM-sXgjpUPCWmR0$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Wap2Hes_3fnC7N6BLwNznCxFPfpLD0iMEAXVuo6HWiGvrQbjjG7sJqTlpko- BM-sXgjpwc_CYiw$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Wap2Hes_3fnC7N6BLwNznCxFPfpLD0iMEAXVuo6HWiGvrQbjjG7sJqTlpko-BM- sXgjp4Mb6iGc$ or for phone support, call 866-208-3676. 245 Market Street, Room 1150 Power Generation San Francisco, CA 94105 Mail Code N11C P.O. Box 770000 San Francisco, CA 94177 December 2, 2020 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer San Francisco Regional Office Federal Energy Regulatory Commission 100 First Street, Suite 2300 San Francisco, CA 94105-3084 SUBJECT: Bucks Creek Project, FERC No. 619, Books1-3 2020 Emergency Action Plan Update ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Mr. Blackett: Pacific Gas and Electric Company (PG&E) has performed a review and update of the Emergency Action Plan (EAP) for FERC No. 619, covering the EAP dams listed in enclosure 3, and is hereby submitting this update electronically. Due to the ongoing shelter-in-place orders issued by the State of California in response to the COVID-19 pandemic, non-essential PG&E staff are currently working remotely, and hard copy filings are not possible at this time. PG&E has updated the following pages: Front Matter: Binder Cover Front Matter: Inside Cover Front Matter: Bookholder List Front Matter: Page iv, Revision Log Section B: Page B-3, Notification Flowchart Section E: Pages E-6, E-8, and E-10, Emergency Response Process Tables Section F: Pages F-4 and F-5, Activation of Flowchart Table Section H: Pages H-1 through H-6: Flood Flow and Time Estimate Tables Appendix G: Acronyms and Terms This filing has been organized such that if you print one copy of enclosure 1 double-sided (Cover Pages for Books 1-3)and three copies of enclosure 2 double-sided (Revised EAP Pages), you should be able to easily update your EAP binder(s) with these revised pages. Please update your EAP binder(s) with these revised pages and remove and destroy the outdated pages. All modifications or additions to the EAP content are highlighted for your convenience. Mr. Frank L. Blackett, P.E., Regional Engineer December 2, 2020 Page 2 If FERC requires a hard copy of this letter and/or enclosures, please contact the EAP Coordinator and copies will be sent after the shelter-in-place restrictions have been lifted and PG&E staff have returned to their normal work locations. Additionally, we ask that you take a moment to review your agency’s contact information on the notification flowchart (Section B) and on the Bookholder List (found in the EAP prior to the Table of Contents). If you have any questions, please contact me at (530) 616-1079, or email AWH9@pge.com. Sincerely, Andrew Hagen EAP Coordinator/Public Safety Specialist Power Generation Enclosures: (ENCLOSURES CONTAIN CUI//CEII) •Enclosure 1: Books 1-3 Cover pages (print 1 copy for binders 1-3) •Enclosure 2: Revised EAP Pages (print 3 copies for binders 1-3) •Enclosure 3: Dams Included in EAP Update AWH9 (530.616.1079) 2020-12-01 PGE-TO-FERC Bucks Creek EAP 2020 Update