From:Schuman, Amy
To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter,
Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug
Subject:Board Correspondence - FW: Emergency Action Plan submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
Date:Wednesday, December 2, 2020 1:02:49 PM
Please see the email below from FERC.
Amy Schuman
Associate Clerk of the Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120
Twitter | Facebook | YouTube | Pinterest
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, December 2, 2020 11:45 AM
Subject: Emergency Action Plan submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 12/2/2020, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas and Electric Company (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Emergency Action Plan
Description: Pacific Gas and Electric Company submits the 2020 Emergency Action Plan Update for the Bucks Creek Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20201202-
5124__;!!KNMwiTCp4spf!Wap2Hes_3fnC7N6BLwNznCxFPfpLD0iMEAXVuo6HWiGvrQbjjG7sJqTlpko-BM-sXgjpUPCWmR0$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Wap2Hes_3fnC7N6BLwNznCxFPfpLD0iMEAXVuo6HWiGvrQbjjG7sJqTlpko-
BM-sXgjpwc_CYiw$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Wap2Hes_3fnC7N6BLwNznCxFPfpLD0iMEAXVuo6HWiGvrQbjjG7sJqTlpko-BM-
sXgjp4Mb6iGc$
or for phone support, call 866-208-3676.
245 Market Street, Room 1150
Power Generation
San Francisco, CA 94105
Mail Code N11C
P.O. Box 770000
San Francisco, CA 94177
December 2, 2020
Via Electronic Submittal (E-File)
Mr. Frank L. Blackett, P.E., Regional Engineer
San Francisco Regional Office
Federal Energy Regulatory Commission
100 First Street, Suite 2300
San Francisco, CA 94105-3084
SUBJECT: Bucks Creek Project, FERC No. 619, Books1-3
2020 Emergency Action Plan Update
ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE
Dear Mr. Blackett:
Pacific Gas and Electric Company (PG&E) has performed a review and update of the
Emergency Action Plan (EAP) for FERC No. 619, covering the EAP dams listed in
enclosure 3, and is hereby submitting this update electronically. Due to the ongoing
shelter-in-place orders issued by the State of California in response to the COVID-19
pandemic, non-essential PG&E staff are currently working remotely, and hard copy filings
are not possible at this time.
PG&E has updated the following pages:
Front Matter: Binder Cover
Front Matter: Inside Cover
Front Matter: Bookholder List
Front Matter: Page iv, Revision Log
Section B: Page B-3, Notification Flowchart
Section E: Pages E-6, E-8, and E-10, Emergency Response Process Tables
Section F: Pages F-4 and F-5, Activation of Flowchart Table
Section H: Pages H-1 through H-6: Flood Flow and Time Estimate Tables
Appendix G: Acronyms and Terms
This filing has been organized such that if you print one copy of enclosure 1 double-sided
(Cover Pages for Books 1-3)and three copies of enclosure 2 double-sided (Revised EAP
Pages), you should be able to easily update your EAP binder(s) with these revised pages.
Please update your EAP binder(s) with these revised pages and remove and destroy the
outdated pages. All modifications or additions to the EAP content are highlighted for your
convenience.
Mr. Frank L. Blackett, P.E., Regional Engineer
December 2, 2020
Page 2
If FERC requires a hard copy of this letter and/or enclosures, please contact the EAP
Coordinator and copies will be sent after the shelter-in-place restrictions have been lifted
and PG&E staff have returned to their normal work locations.
Additionally, we ask that you take a moment to review your agency’s contact information
on the notification flowchart (Section B) and on the Bookholder List (found in the EAP
prior to the Table of Contents).
If you have any questions, please contact me at (530) 616-1079, or email
AWH9@pge.com.
Sincerely,
Andrew Hagen
EAP Coordinator/Public Safety Specialist
Power Generation
Enclosures: (ENCLOSURES CONTAIN CUI//CEII)
•Enclosure 1: Books 1-3 Cover pages (print 1 copy for binders 1-3)
•Enclosure 2: Revised EAP Pages (print 3 copies for binders 1-3)
•Enclosure 3: Dams Included in EAP Update
AWH9 (530.616.1079) 2020-12-01 PGE-TO-FERC Bucks Creek EAP 2020 Update