HomeMy WebLinkAboutB18-2232 CF Overhead Sprinkler Test 2018 New Age
•lreProtection. Inc.
California License#C16 811027 Email; newagefire(dcomcast.net
1250 Market St.,Suite J Ph #530.923.2211
Yuba City, CA. 95991
Correction Letter
December 12,2016
Gridley Spin& Sport
1788 Hwy 99
Gridley,CA 95948
Comment Date; December 9,2016
1. Pipe size for fabrication limits put on plan
2. Detail added showing seismic bracing.
3. Areas where seismic is needed shown on plans.
4. There are no drop ceiling as per Owner.
5. There is no mezzanine as per Owner.
6. A five year inspection and certification to be completed before finishing.
7. Inspection will be completed before concealment of ceiling area.
8. The sprinkler system will be monitored and inspected before Final Inspection.
Dated; December 12,2016
Sincerely; e7:4;'i e7GG40
CAL
Butte County Fire Department
FIRE
-Ncr— ,,E co,, Fire Prevention Bureau
�JiY Sri
176 Nelson Avenue Oroville,CA 95965
, ',, Office 530.538.7888 Butte County
www.buttecountv.net/fire
Fire Sprinkler Inspection Checklist
This Checklist outlines general requirements. Information contained herein applies to typical instances and may
not address all circumstances.
Reference nu e-icim�ers following workkssheet st�atem / e ran NFPA code section unless otherwise specified.
Y N N/A
General
tJen❑ ❑ 1.Approved drawing and above-ground piping certification documents are on site.
�❑ ❑ 2. Underground supply testing and flushing is witnessed and underground piping certification is
provided. Flushing requirements shall be 880 GPM for 6 in., 1,560 GPM for 8 in., 2,440 GPM for
10 in., 3,520 for 12 in., have them pitot and calculate that flow and confirm the velocity is at
least 10 ft/sec
Vii ❑ 3. Hydrostatic test: wet system, 200 PSI for 2 hours and it should include the FDC piping.
❑ ❑ Er 4. Hydrostatic test:dry and double interlock system: 200 PSI for 2 hours and a 40 PSI air leak test
for 24 hours with less than 1.5 PSI loss, 16.2.2.
�/
❑ ❑ Q 5. Backflow prevention device is installed in accordance with the approved set of plans and
forward flow tested 16.2.5.
04❑ 6.Systems subject to pressures greater than 150 PSI shall be hydrostatically tested at 50 PSI
above system working pressure, 16.2.1.2.
I/
❑ ❑ 7. Operational test of the dry-pipe valve is performed and the quick opening device(500+gallon
systems) is tested, 750+gallon system must trip within 60 seconds.
❑ ❑ 8. PRVs are tested at maximum and normal inlet pressures or as specified be the manufacturer,
the supply pressure is recorded on the certificate, a relief valve is on the discharge side and
gauges on each side of the valve, 16.2.4.
1
CAL
Butte County Fire Department
FIRE s-ce t, AE„, Fire Prevention Bureau
176 Nelson Avenue Oroville, CA 95965
. Office 530.538.7888 Butte County
RE JC SG'
www.buttecountv.net/fire "'E> ti `
RISER ROOM
YV:]
N N/A
❑ 9.The main drain is routed to the exterior with a turned down elbow or an inside drain capable
of handling the water flow.A flow test is performed.The main drain pipe is%in.or greater for a
riser up to 2 in., 1%in. or greater for a riser 2% in.to 3%in., 2 in.for a riser 4 in.or greater,
8.15.2.4, 16.2.3.4.
YZ ❑ 10.Water control valves and flow switches are electronically supervised and tested, IFC 903.4
there are 7 exceptions: 13D systems, limited area systems, 13R systems where supply is
common to the sprinkler and the domestic system.
❑ ❑ l-/ 11. Paddle type water flow is not allowed for dry, preaction or deluge systems.
Tr"LI ❑ 12. 24 hour monitoring service agency or remote supervising station or proprietary supervising
�� station received signals, IFC 903.4.1.
td LI ❑ 13.Water flow alarm is tested and initiates an alarm within 5 minutes, located in accordance
—/ with the approved set of plans, and it is properly signed, 16.2.3.1.
I!❑ ❑ 14. High-rise: each floor system shall have water flow device with a test connection and be
�/ connected to the fire alarm system.
L�"LJ ❑ 15. Permanent system identification signs for each control valve and what portion of the
_ building each valve serves is provided, 6.7.4.
❑ ❑ L�'/ 16. Permanent hydraulic nameplate is attached to the riser, 16.5.1.
❑ ❑ TV 17. Riser in a multistory structure is supported at the lowest level, each alternate level, above
� and below offsets,and at the top,9.2.5.3.
Imo'LI ❑ 18. If flexible couplings are used, supports above the lowest level are designed in accordance
� with the approved plans to prevent an upward thrust of the piping, 9.5.3.2.
l2 1 ❑ 19. Gauges are above and below riser check valve, 7.1.1.2.
2
c-2!...R Butte County Fire Department
FIRE
.� kt °0 Fire Prevention Bureau
_= 176 Nelson Avenue Oroville,CA 95965 Butte County
,,m,'„ Office 530.538.7888
www.buttecountv.net/fire '` `
FDC
YV NN N/A
fit"❑ ❑ 20. FDC capped and permanently signed with system type,the required pressure to support the
system if the pressure demand is equal to or greater than 150 PSI, and area or building served,
8.16.2.4.7.
t� Cl t❑ 21. FDC has check valve and drip valve, 8.16.2.5.
C LJ ❑ 22. FDC for wet single riser system connects to the system side,8.16.2.4.
❑ ❑ LW 23. FDC for wet multi-riser system connects after the main system shutoff valve, 8.16.2.4.
❑ ❑ CY 24. FDC for dry system connects between the indicating and dry-pipe valves.
f❑ 25. FDC pipe complies with the size indicated on the plans; FDC is 18 in.to 48 in. above grade
and properly supported 8.16.2.
SPRI LERS
I ❑ ❑ 26. P
spare Spare sprinklers—Provide at least 6 sprinklers for systems designed with 300 or less
p P
sprinklers; 12 spare sprinklers for system designed using 300 to 1000 sprinklers,and 24 spare
� sprinklers for systems designed using more than 1000 sprinklers, 6.2.9.
E1T LI 27. Replacement wrench(s)are provided, 6.2.9.
0
0 28.Sprinklers shall be a minimum of 4 inches from the wall and be properly spaced, 8.6.3.3.
Lr L1 ■ 29.Sprinkler is equipped with a guard if it subject to damage.
P. ■ ❑ 30.Sprinklers are not painted or covered.
❑ ❑ 31. ESFR upright deflectors are a minimum 7 in.above the top of the pipe,8.12.5.3.2.1.
❑ ❑ I!Y' 32. EFSR sprinklers are at least 1 ft. horizontally from the bottom edge of bar joist or open truss
and at least 3 ft. above the top of the storage level,8.12.6.
LT C� 33.The proper type and temperature sprinklers are used and match plans.
34. Escutcheon plates are installed.
Z 35.5 Sprinklers are not obstructed, 8.5.5-8.12.5.
P
3
Butte County Fire Department
CAL
FIRE �E CoU Fire Prevention Bureau
176 Nelson Avenue Oroville,CA 95965 Butte County
> sY,E Office 530.538.7888
•eatta4a.,a•
www.buttecountv.net/fire
PIPE:HANGERS,SEISMIC,AND PENETRATIONS
Y N A
❑ 36. Piping layout and pipe size are the same as the plans.
❑ 37. Pipe penetrations have proper clearance 2 in.for pipe 1in.to 3% in.,4 in.for pipe 4 in. and
larger, 9.3.
®'❑ ❑ 38.When flexible couplings are used in risers, above and below floor penetrations of multi-story
structures, near penetrations of concrete or masonry walls,and near expansion joints,their
location is in accordance with Section 9.3.2.3 (1)-(4).
ZZ❑ 39. Minimum clearance around pipes penetrating construction element listed in 9.3.4.1 is in
accordance with 9.3.4.2 unless the requirements of 9.3.4.3—9.3.4.5 are met.
(U� ❑ 40.A seismic separation assembly is provided at building seismic joints, 9.3.3.
❑ ❑ 41. Lateral sway bracing spacing is in compliance with the approved set of plans,9.3.5.3.3
Special CA amendment"Lag screws or powder-driven fasteners shall not be used to attach
braces to the building structure.
p'❑ ❑ 42. Lateral sway bracing is within 20 ft.of the end of the pipe,9.3.5.3.2.Special CA amendment
"where pipe is used for sway bracing,it shall have a wall thickness of not less than Schedule 40.
❑ ❑ 43.Spacing does not exceed 80 ft.for longitudinal sway bracing,which is required for feed and
cross mains, and the last brace is within 40 ft. of the end of the pipe,9.3.5.4.1 and 9.3.5.4.3.
Cal'❑ ❑ 44.A four-way sway brace spacing is not greater than 25 ft. and a four way brace is located at
the top of the riser if the top of the riser exceeds 3 ft. in length, 9.3.5.5.
[ '❑ ❑ 45. Longitudinal and lateral bracing is provided for each run of pipe between the change of pipe
direction unless the pipe run is less than 12 ft.,9.3.5.11.
[� ❑ ❑ 46.Sprigs greater than 4 ft.are restrained from lateral movement, 9.3.6.5.
❑ ❑ 12" 47.Splayed seismic bracing wire,wrap-around u-hooks,or lateral sway bracing shall not exceed
30 ft.spacing and are used to restrict sprinkler movement that could impact the building,
equipment or finishing materials,9.3.6.4.
❑ ❑ C� 48. Restraining straps are on all C-clamps and the strap is bolted through if there is not a lip on
the beam,9.3.7.1.
❑ 49. Branch lines have one hanger per section of pipe,9.2.3.2.
❑ ❑ 50. Mains and cross mains have one hanger between each branch line and at the end of the
main.
4
Butte County Fire Department
s . s ,IC, C04 Fire Prevention Bureau
444404,-, �J tii
` :- 176 Nelson Avenue Oroville,CA 95965 Butte County
—Y,, Office 530.538.7888
www.buttecountv.net/fire
Y N /A
❑ ❑ 51.The maximum distance between the end sprinkler and hanger is 36 in.for 1in. pipe,48 in.
or 1% in., and 60 in.for 1%in. pipe and greater,9.2.4.
❑ 0 52. Risers in multistory buildings have supports at the lowest level,at each alternate level,
elow offsets, and at the top,9.2.5.3.
0 0 53. Risers in vertical shafts or buildings with ceiling greater than 25 ft. have support for each
pipe section.
[y❑ ❑ 54. Hangers are not within 3 in. of upright sprinklers,9.2.3.3.
DRY AND PR/E-ACTION SYSTEMS
0 0 L�' 55. Dry system compressor,fill line, pressure gauges, check valve and shutoff valve and relief
valve are installed in accordance with 7.2.6.2.The system fills the system within 30 minutes,
V
7.2.6.2.2.
❑ ❑ 56. Preaction and deluge systems are tripped by activation of the detection system.
❑ ❑ 57. Riser room is heated, 7.2.5.
❑ ❑ 58.Air pressure is set according to the manufacture instruction document or at least 20 PSI
above the trip pressure,7.2.6.7.1.
❑ ❑ 7 59. Preaction systems exceeding 20 sprinklers shall be supervised in accordance with 7.3.2.3.1.
❑ ❑ 60. Non-interlock and double interlock preaction systems supervise pipe pressure to maintain a
minimum internal pressure of 7 PSI, 7.3.2.3.2.
Additional Comments: 6/)
7-C4-4e6/
(-1,,,,,A,26 '---7_1„.0 4e,"_,/, c_.. /.--__
Inspection Date: /0 - /5
Approved or Disapproved
inspector , ,--- rir