Loading...
HomeMy WebLinkAbout12.08.20 Board Correspondence - FW_ General Correspondence issued in FERC P-2088-000 From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:Board Correspondence - FW: General Correspondence issued in FERC P-2088-000 Date:Tuesday, December 8, 2020 3:34:10 PM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, December 8, 2020 2:15 PM Subject: General Correspondence issued in FERC P-2088-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/8/2020, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2088-000 Lead Applicant: South Feather Water and Power Agency Filing Type: General Correspondence Compliance Directives Description: Letter to South Feather Water and Power Agency providing comments on the 11th Independent Consultant's Safety Inspection Report and Potential Failure Mode Analysis Addendum Report for Lost Creek Dam, etc. under P-2088. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20201208- 3095__;!!KNMwiTCp4spf!TugIB9RrqJyMmQdK9BoH4GwViAb8y1FfuYYR7B-JAUzGdypbvOQPvVh4eyiXWZopy4LwkWpGsGU$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!TugIB9RrqJyMmQdK9BoH4GwViAb8y1FfuYYR7B- JAUzGdypbvOQPvVh4eyiXWZopy4LwgBXB2v4$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!TugIB9RrqJyMmQdK9BoH4GwViAb8y1FfuYYR7B- JAUzGdypbvOQPvVh4eyiXWZopy4LwNlyHukE$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 Office (415) 369-3322 Facsimile December 8, 2020 In reply refer to: Project No. 2088-CA Mr. Rath Moseley General Manager South Feather Water and Power Agency 2310 Oro-Quincy Highway Oroville, CA 95965 Dear Mr. Moseley: Re: Eleventh Lost Creek Dam Dear Mr. Moseley: This is in response to your letter dated December 13, 2017 that submitted the 11th and Potential Failure Mode Analysis (PFMA) Addendum Report for Lost Creek Dam, which is part of the South Feather Hydroelectric Project, FERC No. 2088. We have reviewed the report, and we have the following comments: 1. The categories of the Potential Failure Modes No. 1, 2, 3, 4, and 5 should be revisited during the next PFMA review session due to the recent modifications of the dam. 2. As indicated in our May 5, 2017 Part 12 reminder letter, SFWPA is reminded that a plan and schedule to address the independent consultant recommendations was due not later than 60 days after the filing of the Part 12 report. Please submit an updated plan and schedule to address all of the independent consultant recommendations including the recommendations that have been completed. 2 Our review of the Part 12D Report concludes that the scope and content of the report satisfies the requirements of Part 12, Subpart D, §12.37 of Title 18 of the Code of Federal Regulations. The Part 12D Report was found to be prepared in general accordance with the Engineering Guidelines Chapter 14. Within 30 days of the date of this letter, please provide a plan and schedule to address our comments. We appreciate your cooperation in this aspect of the ou have any questions, please contact Mr. Ricardo Galdamez at (415) 369-3310. Sincerely, Frank L. Blackett, P.E. Regional Engineer