Loading...
HomeMy WebLinkAbout01.04.21 BOS Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Kimmelshue, Tod;Lambert, Steve; Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia; Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Monday, January 4, 2021 12:37:25 PM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, January 4, 2021 12:35 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/4/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company Submits Second Part 12D Inspection, Plan and Schedule for DeSabla-Centerville Hydro Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210104- 5078__;!!KNMwiTCp4spf!QZGz9ZGQ5t- sGS_dUNT4BnQWJy48jJJ5CPqlvtg2Re663XSW0O7NKrnNyY7FZMqXwO2eKjnqVDs$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!QZGz9ZGQ5t- sGS_dUNT4BnQWJy48jJJ5CPqlvtg2Re663XSW0O7NKrnNyY7FZMqXwO2eHpPtrjs$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!QZGz9ZGQ5t- sGS_dUNT4BnQWJy48jJJ5CPqlvtg2Re663XSW0O7NKrnNyY7FZMqXwO2e4GABiOI$ or for phone support, call 866-208-3676. tƚǞĻƩ DĻƓĻƩğƷźƚƓ 245 Market Street San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 December 31, 2020 San Francisco, CA 94177 Via Electronic Submittal (E-file) Mr. Frank L. Blackett P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Second Part 12D Inspection, Plan and Schedule ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE Dear Mr. Blackett: This letter presents Pacific Gas and s and schedules to address recommendations from the second 5-year Part 12D safety inspection report for Round Valley Dam, which is part of PG&E DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. PG&E submitted the safety inspection report, prepared by Independent Consultant Mr. Marc Ryan, P.E., G.E., and dated October 2020, to FERC on November 2, 2020. s and schedules to address the recommendations are enclosed with this letter (Enclosure 1). Ongoing shelter-in-place orders issued by the State of California in response to the COVID-19 pandemic require that nonessential PG&E staff work remotely, and hard copy filings are not practical at this time. If FERC requires hard copies of this letter and/or enclosure, please contact the license coordinator identified below. If necessary, hard copies will be sent after the shelter-in-place restrictions have been lifted and PG&E staff have returned to their normal work locations. safety engineer, Mr. Ben Fontana, at (530) 762-9459. For general questions, please contact se coordinator, Ms. Jamie Visinoni, at (530) 215-6676. Sincerely, David L. Ritzman, PE, GE Chief Dam Safety Engineer Enclosure: CUI//CEII DO NOT RELEASE 1. Plans and Schedules