HomeMy WebLinkAbout01.04.21 BOS Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
From:Schuman, Amy
To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Kimmelshue, Tod;Lambert, Steve;
Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;
Sweeney, Kathleen;Teeter, Doug
Subject:BOS Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific
Gas and Electric Company,et al.
Date:Monday, January 4, 2021 12:37:25 PM
Please see the email below from FERC.
Amy Schuman
Associate Clerk of the Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120
Twitter | Facebook | YouTube | Pinterest
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, January 4, 2021 12:35 PM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric
Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 1/4/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC),
Washington D.C.:
Filer: Pacific Gas and Electric Company
No Organization Found (as Agent)
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: Pacific Gas and Electric Company Submits Second Part 12D Inspection, Plan and Schedule for
DeSabla-Centerville Hydro Project under P-803.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210104-
5078__;!!KNMwiTCp4spf!QZGz9ZGQ5t-
sGS_dUNT4BnQWJy48jJJ5CPqlvtg2Re663XSW0O7NKrnNyY7FZMqXwO2eKjnqVDs$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!QZGz9ZGQ5t-
sGS_dUNT4BnQWJy48jJJ5CPqlvtg2Re663XSW0O7NKrnNyY7FZMqXwO2eHpPtrjs$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!QZGz9ZGQ5t-
sGS_dUNT4BnQWJy48jJJ5CPqlvtg2Re663XSW0O7NKrnNyY7FZMqXwO2e4GABiOI$
or for phone support, call 866-208-3676.
tƚǞĻƩ DĻƓĻƩğƷźƚƓ 245 Market Street
San Francisco, CA 94105
Mailing Address:
Mail Code N11D
P.O. Box 770000
December 31, 2020
San Francisco, CA 94177
Via Electronic Submittal (E-file)
Mr. Frank L. Blackett P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Round Valley Dam, NATDAM No. CA00346
Second Part 12D Inspection, Plan and Schedule
ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE
Dear Mr. Blackett:
This letter presents Pacific Gas and s and schedules to
address recommendations from the second 5-year Part 12D safety inspection report for Round
Valley Dam, which is part of PG&E DeSabla-Centerville Hydroelectric Project, Federal
Energy Regulatory Commission (FERC) No. 803. PG&E submitted the safety inspection
report, prepared by Independent Consultant Mr. Marc Ryan, P.E., G.E., and dated October
2020, to FERC on November 2, 2020. s and schedules to address the
recommendations are enclosed with this letter (Enclosure 1).
Ongoing shelter-in-place orders issued by the State of California in response to the COVID-19
pandemic require that nonessential PG&E staff work remotely, and hard copy filings are not
practical at this time. If FERC requires hard copies of this letter and/or enclosure, please
contact the license coordinator identified below. If necessary, hard copies will be sent after the
shelter-in-place restrictions have been lifted and PG&E staff have returned to their normal
work locations.
safety engineer, Mr. Ben Fontana, at (530) 762-9459. For general questions, please contact
se coordinator, Ms. Jamie Visinoni, at (530) 215-6676.
Sincerely,
David L. Ritzman, PE, GE
Chief Dam Safety Engineer
Enclosure: CUI//CEII DO NOT RELEASE
1. Plans and Schedules