Loading...
HomeMy WebLinkAbout01.05.21 BOS Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod; Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami; Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, January 5, 2021 1:49:04 PM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, January 5, 2021 1:45 PM Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/4/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company Submits Delegation of Authority regarding Section 106 for the Grizzly Forebay Dam Access Improvements Project for the Bucks Creek-Grizzly Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210104- 5380__;!!KNMwiTCp4spf!T_hOkek-UFcu07I4dP4HzDmNdZ5zdirpQNgHSoJQeH3G_pGp7P0VvpPasd- QIylcsqowKX4yqyM$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!T_hOkek- UFcu07I4dP4HzDmNdZ5zdirpQNgHSoJQeH3G_pGp7P0VvpPasd-QIylcsqowKa4Ebb4$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!T_hOkek- UFcu07I4dP4HzDmNdZ5zdirpQNgHSoJQeH3G_pGp7P0VvpPasd-QIylcsqowCFjqEqU$ or for phone support, call 866-208-3676. tƚǞĻƩ DĻƓĻƩğƷźƚƓ 245 Market Street San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 January 4, 2021 Via Electronic Submittal (E-File) Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission st 888 1 Street NE Washington, DC 20426 RE: Bucks Creek-Grizzly Hydroelectric Project (FERC No. 619) Delegation of Authority regarding Section 106 for the Grizzly Forebay Dam Access Improvements Project Dear Secretary Bose: Pacific Gas and Electric Company (PG&E) operates the Bucks Creek-Grizzly Hydroelectric Project (FERC No. 619) (Project) located within Plumas County, CA. The proposed work performed on the hydroelectric Project will require permission from the Federal Energy Regulatory Commission (FERC), and therefore will constitute an undertaking as per 36 CFR 800. Access to the remote Grizzly Forebay Dam is challenging, especially in winter months. The site is only accessible during the summer to early fall. The right side of the dam, right abutment and intake are accessible from an unimproved access road off Grizzly Forebay Route 24A. However, the overpour spillway prevents access to the left side of the dam, which can only be accessed by boat. PG&E has identified several access and safety issues at Grizzly Forebay Dam that need to be addressed for operations, maintenance, dam safety inspectors, survey personnel and to improve general safety. Construction is anticipated to begin in July 2021, with completion by October 2021. To perform the necessary construction, consultation will be required with the State Historic Preservation Officer (SHPO). PG&E requests that FERC, as the lead federal agency for undertakings related to this Project, delegate authority to PG&E to carry out tasks necessary for compliance with Section 106 of the National Historic Preservation Act (Section 106), as allowed under 36 CFR 800.2(c)(4). If granted authority, PG&E will act on behalf of FERC and perform all consultation with the California State Office of Historic Preservation, the USDA Forest Service Plumas National Forest (the land-holding agency, Ms. Kimberly D. Bose, Secretary January 4, 2021 Page 2 on which a portion of the Project is located), and federally recognized Native American tribes, as appropriate. If you concur with this request, please respond in writing. Should you have any questionsSenior Cultural Resources Specialist, Kathleen Forrest at (916) 583-5568. Sincerely, Elisabeth Rossi Hydro Licensing Supervisor