Loading...
HomeMy WebLinkAbout01.07.21 BOS Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-1061-019,et al. by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-1061-019,et al. by Pacific Gas and Electric Company,et al. Date:Friday, January 8, 2021 8:06:00 AM Good morning, Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, January 8, 2021 6:35 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-1061-019,et al. by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/8/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas and Electric Company (as Agent) Docket(s): P-1061-019 P-1121-000 P-1354-000 P-137-000 P-175-000 P-1962-001 P-1988-000 P-2105-000 P-2106-000 P-2107-000 P-2130-000 P-2155-001 P-2310-000 P-233-000 P-2687-000 P-2735-000 P-619-000 P-77-001 P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits an extension of time request with a plan and schedule for the overdue items re the Potter Valley Hydroelectric Project et al under P-77, et al. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210108- 5023__;!!KNMwiTCp4spf!RkjpjMtZdDiy1jkn2kzgN_JX0gw5rJO0hvAa2qIslS1rAi9tdfb6be_AfCVZkE5178NN-DpPf6Q$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!RkjpjMtZdDiy1jkn2kzgN_JX0gw5rJO0hvAa2qIslS1rAi9tdfb6be_AfCVZkE5178NNbqRbmZ4$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!RkjpjMtZdDiy1jkn2kzgN_JX0gw5rJO0hvAa2qIslS1rAi9tdfb6be_AfCVZkE5178NNHv5y8uA$ or for phone support, call 866-208-3676. Jan Nimick Generation 12840 Bill Clark Way Vice President Auburn, CA 95602 Generation 805-208-6224 E-Mail: Jan.Nimick@pge.com January 7, 2021 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Overdue Items: Status Update Potter Valley Hydroelectric Project, FERC Project No. 77 Mokelumne River Hydroelectric Project, FERC Project No. 137 Balch Hydroelectric Project, FERC Project No. 175 Pit 3, 4, and 5 Hydroelectric Project, FERC Project No. 233 Bucks Creek-Grizzly Hydroelectric Project, FERC Project No. 619 DeSabla-Centerville Hydroelectric Project, FERC Project No. 803 Phoenix Hydroelectric Project, FERC Project No. 1061 Battle Creek Hydroelectric Project, FERC Project No. 1121 Crane Valley Hydroelectric Project, FERC Project No. 1354 Rock Creek-Cresta Hydroelectric Project, FERC Project No. 1962 Haas-Kings River Hydroelectric Project, FERC Project No. 1988 Upper North Fork Feather River Hydroelectric Project, FERC Project No. 2105 McCloud-Pit Hydroelectric Project, FERC Project No. 2106 Poe Hydroelectric Project, FERC Project No. 2107 Spring Gap-Stanislaus Hydroelectric Project, FERC Project No. 2130 Chili Bar Hydroelectric Project, FERC Project No. 2155 Drum-Spaulding Hydroelectric Project, FERC Project No. 2310 Pit 1 Hydroelectric Project, FERC Project No. 2687 Helms Pumped Storage Hydroelectric Project, FERC Project No. 2735 Dear Mr. Blackett: This letter presents an update on the status of overdue items identified in the Federal Energy Regulatory Commission (FERC) letters to PG&E dated July 20, September 16, and November 24, 2020 for the above-listed projects. The status of each overdue item is provided in enclosure 1. These letters have underscored the importance of timely response in FERC correspondence and PG&E is taking several steps to address all of the overdue and coming due items including: Mr. Frank L. Blackett, P.E. January 7, 2021 Page 2 Developed a multi-phase action plan to establish and maintain compliance with regulatory filings. Performed two cause evaluations to investigate the reason for these overdue items to exist. Implementing corrective actions including increasing resources for our License Compliance and Dam Safety teams. Issued procedures to provide guidance and expectations on responding to regulatory correspondence. Established governance that ensures that any compliance deviation (including overdue items) is captured in our Corrective Action Program. Developing tools, metrics, and goals to give transparency to leaders and workers for tracking compliance work to completion. Performed independent internal (PG&E), and external (Dam Safety Advisory Board), reviews of the 68 overdue items to evaluate risk significance and verify PG&E's plan to prevent recurrence. The PG&E plan and schedule for the overdue items included in the subject letters is included in Enclosure 1 that presents a summary table listing the FERC referenced 68 overdue items, along efforts and updated schedules to address these items. By way of this letter, PG&E respectfully requests an Extension of Time (EOT) for those items identified in the column Extension of Time Being Requested w/ this Letter" of Enclosure 1. Should you have any technical questions concerning this matter, please contact PG&E Chief Dam Safety Engineer, Mr. David Ritzman, P.E. at (415) 264-1795. For general questions, please contact the Director of Risk and Compliance, Russell Prentice, at (805) 305-5665. Sincerely, Jan Nimick Vice President, Power Generation Enclosure: 1. Status Update Table on Overdue Items ENCLOSURE 1 ENCLOSURE 1 - STATUS OF FERC ITEM RESPONSES EXTENSION OF FINAL EXTENSION OF TIME BEING FERC Item FERC Project MOST RECENT ORIGINAL OVERDUE ITEMS DESCRIPTIONDOCUMENTS PG&E STATUS - 1/7/2021 TIME REQUEST No.CORRESPONDENCE DUE DATEREQUESTED No. FILED (DATE) FILED (DATE) W/THIS LETTER 177, 137, 175, 2019 EAP Status Reports: Response to 7/16/20208/30/2020 Completed: Filed documents to 12/22/2020 233, 619, 803, FERC's 7/16/20 Commentsclose. 1061, 1121, 1403, 1962, 1988, 2105, 2106, 2130, 2155, 2310, 2687, 2735 10-Year Spillway Radial Gate Inspection Reports (GIRs) 277, 137, 1962 Scott Dam, Tiger Creek Dam, Rock Creek 9/22/2020^10/2/2020 Completed: Filed documents to 12/30/2020 and 2310Dam and Lake Fordyce Damclose. 31962, 2105, Cresta Dam, Belden Dam and Pit 1 Dam9/22/2020^10/30/2020 Completed: Cresta Dam and Belden 4/30/2021 and 2687Dam submittals completed (12/30/2020 and 12/29/2020). Ongoing: Pit 1 completed field inspection in December 2020 and currently finalizing report. Potter Valley 4772019 FERC Annual Dam Safety Inspection: 1/16/20203/3/2020 Completed: Filed documents to 12/18/2020 Plan & Scheduleclose. 577Scott Dam: 2014 Part 12D 11/27/2019 & 5/2/2020 Ongoing: Pending completion of 7th 4/30/2021 Recommendations (R-8, R-13, R-39, R-66, R-3/6/2020^Board of Consultants Meeting in Q1 70): Updated Plan & Scheduleof 2021, will file updated schedule with final reports of site-specific probable maximum precipitation and flood studies. 677SSPMP/PMF BOC 3/4/20 conference call: 4/30/20206/14/2020 Completed: Filed documents to 10/19/2020 Response to FERC comments on close. Preparation Package 777Scott Dam: 2019 Part P12D: Updated STID 9/2/2020^9/30/2020 Completed: Filed documents to 12/14/2020 Section 3 (R-27)close. Balch 1 ENCLOSURE 1 - STATUS OF FERC ITEM RESPONSES EXTENSION OF FINAL EXTENSION OF TIME BEING FERC Item FERC Project MOST RECENT ORIGINAL OVERDUE ITEMS DESCRIPTIONDOCUMENTS PG&E STATUS - 1/7/2021 TIME REQUEST No.CORRESPONDENCE DUE DATEREQUESTED No. FILED (DATE) FILED (DATE) W/THIS LETTER 81752019 Part 12D Recommendations Balch Div. 2/5/2020 & 4/30/2020 Completed: Filed documents to 12/31/2020 (R-1, R-2, R-8, R-10, R-11); Balch AB (R-1, R-2/10/2020^close. 9, R-10): STID Revisions Updated Plan & Schedule 91752019 Part 12D Erodibility Assessment 2/5/2020 & 5/31/2020 Ongoing: Filed EOT request.12/24/2020 Reports Balch Div. & AB (R-6): Updated Plan 2/10/2020^ & Schedule 101752019 Part 12D Balch Div. (R-7, R-13, R-14); 2/5/2020 & 9/30/2020 Ongoing: Filed EOT request.12/24/2020 Balch AB (R-7, R-11, R-12): Results of Data 2/10/2020^ Collection Efforts 11175Balch Div. (R-12): Results of 2/5/2020 & 9/30/2020 Ongoing: Filed EOT request.12/24/2020 Documentation Review 2/10/2020^ PMF & Wind-Wave Studies 12233, 1121, Evaluation of Potential effects of 5/29/20207/13/2020 Ongoing: Conducting engineering 6/30/2021 2106, 2688Overtopping effects and a plan & Schedule review and developing plan and for Mitigation against any adverse effectsschedule requirements consistent with 2019 PFMA and 5/29/2020 FERC letter. 13233, 1121, Seven items due within 90 days of FERC 12/20/2019^8/27/2020 Ongoing: Conducting substantial 6/30/2021 2106, 2688acceptance of studiesrevisions to plan and schedule based on 5/29/2020 FERC letter outlining recommended updates to 2019 PFMA. 2019 Annual Spillway Gate Operation Certificates 14233, 2106, 2019 annual spillway gate operation certs: 9/10/202010/25/2020 Completed: Filed documents to 12/30/2020 2687Response to Commentsclose. Pit No. 3, 4 and 5 15233Pit 3 Dam: Fault 3432 PFMA Workshop 5/31/2019^6/30/2020 Ongoing: Final PFMA report 4/30/2021 Reportundergoing internal review. 16233Pit 3 & 5 Diversion Dam: Plan & schedule 8/13/20209/27/2020 Ongoing: Analysis required to 4/30/2021 for damaged downstream areascomplete prior to update of plan and schedule. 2 ENCLOSURE 1 - STATUS OF FERC ITEM RESPONSES EXTENSION OF FINAL EXTENSION OF TIME BEING FERC Item FERC Project MOST RECENT ORIGINAL OVERDUE ITEMS DESCRIPTIONDOCUMENTS PG&E STATUS - 1/7/2021 TIME REQUEST No.CORRESPONDENCE DUE DATEREQUESTED No. FILED (DATE) FILED (DATE) W/THIS LETTER 17233Pit 5 Open Channel: Plan & Schedule for 8/18/202010/2/2020 Ongoing: Analysis required to 4/30/2021 complete prior to update of plan and completing recommendations from the Focused Spillway Assessment schedule. (no response received to FERC’s 8/18/20 letter). DeSabla Centerville 18803Round Valley Dam: Revised DPP*4/2/21095/17/2019 Ongoing: Filed EOT request.12/29/2020 19803Philbrook Dam: Revised DPP*5/2/20196/17/2019 Ongoing: Filed EOT request.12/29/2020 20803DeSabla Forebay Dam: Additional 10/23/201912/7/2019 Completed: Filed documents to 11/30/2020 information for temporary erosion close. measures on downstream face* 21803DeSabla Forebay Dam: Selected alternative 6/26/2019^4/15/2020 Ongoing: Filed EOT request.11/30/2020 for long-term erosion mitigation on downstream face* 22803Hendricks Head Dam: Repair Plan to 5/29/2020^6/30/2020 Ongoing: Revised construction 4/30/2021 address seeppackage under development for final internal review prior to approval. 23803Round Valley Dam: Log Boom Construction 5/26/2020^7/31/2020 Ongoing: Revised construction 4/30/2021 Packagepackage under development for final internal review prior to approval. 24803Round Valley Dam: Plan & Schedule for 7/14/20208/28/2020 Ongoing: Plan and schedule 4/30/2021 Focused Spillway Assessment undergoing internal review. recommendations (no response received to FERC’s 7/14/20 letter) 25803Philbrook Dam: Memorandum/a regarding 7/14/20208/28/2020 Ongoing: Plan and schedule 4/30/2021 subterranean water flow and plan and undergoing internal review. schedule for completing recommendations from the Focused Spillway Assessment Phoenix 261061Resource agency documentation for the 8/5/20209/19/2020 Completed: Filed documents to 12/31/2020 Phoenix Powerhouse Ground Grid Safety close. Improvements Battle Creek 3 ENCLOSURE 1 - STATUS OF FERC ITEM RESPONSES EXTENSION OF FINAL EXTENSION OF TIME BEING FERC Item FERC Project MOST RECENT ORIGINAL OVERDUE ITEMS DESCRIPTIONDOCUMENTS PG&E STATUS - 1/7/2021 TIME REQUEST No.CORRESPONDENCE DUE DATEREQUESTED No. FILED (DATE) FILED (DATE) W/THIS LETTER 271121Coleman Intake Siphon No. 1: Final 12/31/191/8/2021 Ongoing: Filed EOT request.1/6/2021 Construction Report for Automated Trash Rake Project 281121Coleman Forebay: Results of 2019 3/28/2019 & 1/31/2020 Ongoing: Plan and schedule 2/26/2021 Subsurface Investigation results and plan 12/30/2019^undergoing internal review. and schedule for completing seepage and stability analyses 291121Salmon and Steelhead Restoration Project 1/14/2020^2/10/2020 Completed: Filed documents to 1/5/2021 Phase 1B: Final Construction Report*close. 301121Macumber Dam: 2020 Spillway Toe 7/28/201710/31/2020 Ongoing: Evaluation report 2/26/2021 Evaluation Reportundergoing internal review. Crane Valley 311354Crane Valley Dam: Status update and plan 5/28/2019^4/30/2020 Ongoing: Filed EOT request.1/4/2021 and schedule for completing the outlet tower retrofit design Rock Creek Cresta 321962Rock Creek Cresta Dam: 2019 FERC annual 3/12/20204/27/2020 Ongoing: Plan and schedule 4/30/2021 dam safety inspection: Plan and schedule undergoing internal review. for addressing the follow-up items Haas-Kings 331988Wishon Dam Part 12D (R-10): Updated plan 2/7/2020^4/30/2020 Completed: Filed documents to 12/29/2020 and schedule to provide STID Section 4 close. revision 341988Courtright Dam P12D (R-7): Feasibility study 2/10/2020^9/30/2020 Ongoing: Filed EOT request.12/29/2020 for modifying the parapet wall manways 351988Courtright Dam Part 12D (R-8): Results of 2/10/2020^9/30/2020 Ongoing: Filed EOT request.12/29/2020 data collection efforts as a first step to evaluating the potential for overtopping 4 ENCLOSURE 1 - STATUS OF FERC ITEM RESPONSES EXTENSION OF FINAL EXTENSION OF TIME BEING FERC Item FERC Project MOST RECENT ORIGINAL OVERDUE ITEMS DESCRIPTIONDOCUMENTS PG&E STATUS - 1/7/2021 TIME REQUEST No.CORRESPONDENCE DUE DATEREQUESTED No. FILED (DATE) FILED (DATE) W/THIS LETTER 361988Wishon Dam Part 12D (R-7): Investigation 2/7/2020^9/30/2020 Ongoing: Filed EOT request.12/29/2020 and evaluation report for the LLO butterfly valve seat ring bolt failure 371988Wishon Dam Part 12D (R-8): Feasibility 2/7/2020^9/30/2020 Ongoing: Filed EOT request.12/29/2020 Study for modifying Parapet Wall Manways 381988Wishon Dam Part 12D (R-11): Results of 2/7/2020^9/30/2020 Ongoing: Filed EOT request.12/29/2020 data collection efforts as a first step to evaluating the potential for overtopping 391988Courtright & Wishon Dams: Plan and 9/16/202010/31/2020 Ongoing: Contracting additional 4/30/2021 schedule to address Focused Spillway analysis support for plan and Assessment Report recommendationsschedule development. McCloud Pit 402106Iron Canyon Dam: Final Construction 11/30/201911/15/2020 Completed: Filed documents to 12/30/2020 Report for Iron Canyon Right Abutment close. Storm Damage Repair 412106Iron Canyon Dam: Geotechnical Data 6/24/201911/1/2019 Ongoing: Report undergoing 2/26/2021 Report for Iron Canyon Post-Construction internal review. Instrumentation Installation* 422106Pit 7 Dam: Updated structural analysis and 12/31/2019^6/30/2020 Completed: Filed requested 12/30/2020 plan and schedule for completing an documents. alternatives analysis for retrofit of the spillway radial gates 432106Pit 6 Dam: Updated structural analysis and 12/31/2019^10/31/2020 Completed: Filed requested 12/30/2020 plan and schedule for completing an documents. alternatives analysis for retrofit of the spillway radial gates 442106McCloud Spillway: Alternatives analysis 9/11/202010/31/2020 Ongoing: Alternatives analysis 2/26/2021 report and status update to support report undergoing internal review. remediation 452106Pit 6 Dam: Final Construction Report for 9/3/2020^1/1/2018 Completed: Filed documents to 12/28/2020 Spillway Apron Repair Projectclose. 5 ENCLOSURE 1 - STATUS OF FERC ITEM RESPONSES EXTENSION OF FINAL EXTENSION OF TIME BEING FERC Item FERC Project MOST RECENT ORIGINAL OVERDUE ITEMS DESCRIPTIONDOCUMENTS PG&E STATUS - 1/7/2021 TIME REQUEST No.CORRESPONDENCE DUE DATEREQUESTED No. FILED (DATE) FILED (DATE) W/THIS LETTER Poe 4621072019 FERC annual dam safety inspection: 4/6/20205/21/2020 Ongoing: Plan and schedule 4/30/2021 Plan and schedule for addressing the follow- undergoing internal review. up items Spring Gap Stanislaus 472130Strawberry Dam: Part 12D (R-6): Updated 12/31/2018^4/30/2020 Ongoing: Filed EOT request.12/29/2020 stability analyses of the spillway 482130Relief & Strawberry Dams: Plan and 9/16/202010/31/2020 Ongoing: Contracting additional 4/30/2021 schedule to address Focused Spillway analysis support for plan and Assessment Report recommendations. (no schedule development. response received to FERC’s 9/16/20 letter) Drum Spaulding 492310Rock Creek & Wise FB: 49 .Plan and 11/6/201812/21/2018 Rock Creek Ongoing: PG&E will 4/30/2021 schedule for addressing follow-up items No. investigate the oak tree and provide 16 and 17 , respectively) from the 2018 a specific evaluation of the subject FERC annual dam safety inspection: (no oak tree, along with a plan and response received on these items from schedule if necessary, for FERC FERC’s 11/6/18 follow-up letter).review by 4/30. Wise FB Complete: Vegetation removed. 502310L. Spaulding Dam 1: Evaluation of the 2/22/2019^1/31/2020 Completed: Filed documents to 12/18/2020 feasibility of installing a weir to measure close. seepage through the left abutment (Tenth Part 12D recommendation R- 8): Due by 1/31/20, according to PG&E’s 2/22/19 letter. 512310Halsey AB: Focused Spillway Assessment: 1/8/20202/22/2020 Ongoing: Developing 4/30/2021 Plan and schedule to address documentation to address recommendations from and FERC recommendations and plan and comments: Due by 2/22/20 (no response schedule if necessary to meet them. received to FERC’s 1/8/20 letter). 6 ENCLOSURE 1 - STATUS OF FERC ITEM RESPONSES EXTENSION OF FINAL EXTENSION OF TIME BEING FERC Item FERC Project MOST RECENT ORIGINAL OVERDUE ITEMS DESCRIPTIONDOCUMENTS PG&E STATUS - 1/7/2021 TIME REQUEST No.CORRESPONDENCE DUE DATEREQUESTED No. FILED (DATE) FILED (DATE) W/THIS LETTER 522310Halsey FB 1: Focused Spillway Assessment: 1/8/20202/22/2020 Ongoing: Developing 4/30/2021 Plan and schedule to address documentation to address recommendations from and FERC recommendations and plan and comments: Due by 2/22/20 (no response schedule if necessary to meet them. received to FERC’s 1/8/20 letter). 532310Fordyce, Spaulding 2 & Drum AB: 2019. 1/29/20203/14/2020 Completed: Filed documents to 12/29/2020 Response to FERC comments on the 2019 close. annual spillway gate operation certificates: Due by 3/14/20 (no response received to FERC’s 1/29/20 letter). 542310Upper Peak Lake: Seismic stability and 2/19/2019^3/31/2020 Ongoing: Filed EOT request.8/27/2020 deformation analysis (Eleventh Part 12D recommendation R-3): Due by 3/31/20, 552310Fordyce: Response to FERC comments on 3/17/20205/1/2020 Ongoing: PG&E obtaining 2/26/2021 the structural analysis of the rear valve engineering contract support to house wall: Due by 5/1/20 (no response complete plan and schedule required received to FERC’s 3/17/20 letter). for response. 562310Fuller Lake Dam: Assess the appropriate 3/25/20205/9/2020 Ongoing: Assessment undergoing 2/26/2021 monitoring frequency for obtaining internal review. accurate readings of Weir YB-12A: Due by 5/9/20 (no response received to FERC’s 3/25/20 letter). 572310Upper Peak Lake Dam: Assess seepage flow 3/25/20205/9/2020 Ongoing: Report undergoing 2/26/2021 monitoring options following rehabilitation internal review. of the spillway and masonry wall: Due by 5/9/20 (no response received to FERC’s 3/25/20 letter). 7 ENCLOSURE 1 - STATUS OF FERC ITEM RESPONSES EXTENSION OF FINAL EXTENSION OF TIME BEING FERC Item FERC Project MOST RECENT ORIGINAL OVERDUE ITEMS DESCRIPTIONDOCUMENTS PG&E STATUS - 1/7/2021 TIME REQUEST No.CORRESPONDENCE DUE DATEREQUESTED No. FILED (DATE) FILED (DATE) W/THIS LETTER 582310Meadow Lake Dam: Supplement to 4/24/20206/8/2020 Ongoing: Study undergoing internal 2/26/2021 Liquefaction Sensitivity Seismic Stability review. Study: (Tenth Part 12D recommendation R- 7): Due by 6/8/20 (no response received to FERC’s 4/24/20 letter). 592310Spaulding Lake Dam #3: Report justifying 4/24/20206/8/2020 Ongoing: Report undergoing 2/26/2021 PG&E’s determination that there is no need internal review to upgrade the weirs downstream: (Ninth Part 12D recommendation R- 1.3.4.5): Due by 6/8/20 (no response received to FERC’s 4/24/20 letter). 602310Wise FB Dam: Hydraulic sensitivity analysis: 4/24/20206/8/2020 Ongoing: Analysis undergoing 2/26/2021 (Fourth Part 12D recommendation R-1): internal review. Due by 6/8/20 (no response received to FERC’s 4/24/20 letter). 612310Wise FB Dam: Plan and schedule for 3/29/2019^7/31/2020 Ongoing: Plan and schedule 2/26/2021 upgrading the instrumentation and undergoing internal review. monitoring systems, adding an automatic shutoff at the intake, and/or improving the downstream spill channel: (Fifth Part 12D recommendations R-4, R-6, and R- 7, respectively): Due by 7/31/20, according to PG&E’s 3/29/19 letter 622310Halsey FB Dam 1: Review of the static 3/29/2019^8/28/2020 Ongoing: Analysis undergoing 2/26/2021 stability analysis for the right abutment internal review. section: (Eighth Part 12D recommendation R-11): Due by 8/28/20, according to PG&E’s 3/29/19 letter. 8 ENCLOSURE 1 - STATUS OF FERC ITEM RESPONSES EXTENSION OF FINAL EXTENSION OF TIME BEING FERC Item FERC Project MOST RECENT ORIGINAL OVERDUE ITEMS DESCRIPTIONDOCUMENTS PG&E STATUS - 1/7/2021 TIME REQUEST No.CORRESPONDENCE DUE DATEREQUESTED No. FILED (DATE) FILED (DATE) W/THIS LETTER 632310Halsey FB Dam 2: Deformation Analysis of 7/15/20208/29/2020 Ongoing: Analysis undergoing 2/26/2021 the Modified Embankment are valid: Due internal review. by 8/29/20 (no response received to FERC’s 7/15/20 letter). 642310Halsey FB Dam 2: Internal video inspection 3/29/2019^9/30/2020 Ongoing: COVID19 impact to 6/30/2021 report for the subdrain system: (Eighth Part inspections schedules associated 12D recommendation R-6): Due by 9/30/20, with subdrain system. Updating according to PG&E’s 3/29/19 letter.timeline to reflect delay and resulting plan and schedule associated with findings. 652310Halsey FB Dam1: Review of existing 2/28/2020^11/1/2020 Ongoing: Analysis completed, 6/30/2021 information regarding subsurface developing report for independent conditions and the liquefaction consultant review and comment. susceptibility of the foundation materials: (Eighth Part 12D recommendation R-1): Due by 11/1/20, according to PG&E’s 2/28/20 letter. 662310Wise FB: Review of existing information 2/28/2020^11/1/2020 Ongoing: Analysis completed, 6/30/2021 regarding subsurface conditions and the developing report for independent expected seismic performance of the consultant review and comment. foundation materials: (Fifth Part 12D recommendation R-10): Due by 11/1/20, according to PG&E’s 2/28/20 letter. 672687Pit 1 FB Dam: Plan and schedule for 4/28/20206/12/2020 Ongoing: Implementing actions to 2/26/2021 addressing comments from the Ninth Part address comments. 12D report : Due by 6/12/20 (no response received to FERC’s 4/28/20 letter). 9 ENCLOSURE 1 - STATUS OF FERC ITEM RESPONSES EXTENSION OF FINAL EXTENSION OF TIME BEING FERC Item FERC Project MOST RECENT ORIGINAL OVERDUE ITEMS DESCRIPTIONDOCUMENTS PG&E STATUS - 1/7/2021 TIME REQUEST No.CORRESPONDENCE DUE DATEREQUESTED No. FILED (DATE) FILED (DATE) W/THIS LETTER 682687Pit 1 FB Dam: Supplemental spillway 9/15/202010/30/2020 Completed: Filed documents to 1/7/2021 inspection report and plan and schedule for close. completing the recommendations from the Focused Spillway Assessment : Due by 10/30/20 (no response received to FERC’s 9/15/20 letter). 10