HomeMy WebLinkAbout01.08.21 BOS Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-1354-000,et al. by Pacific Gas and Electric Company,et al.
From:Schuman, Amy
To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring,
Brian;Ritter,
Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug
Subject:BOS Correspondence - FW: Project Operations Compliance Report submitted in FERC P-1354-000,et al. by Pacific Gas and Electric Company,et al.
Date:Friday, January 8, 2021 2:26:54 PM
See the email below.
Amy Schuman
Associate Clerk of the Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120
Twitter | Facebook | YouTube | Pinterest
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, January 8, 2021 2:05 PM
Subject: Project Operations Compliance Report submitted in FERC P-1354-000,et al. by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 1/8/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
No Organization Found (as Agent)
Docket(s): P-1354-000
P-1962-001
P-2107-000
P-619-000
P-77-001
P-803-000
P-96-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Project Operations Compliance Report
Description: Pacific Gas and Electric Company submits Control of Debris from the 2020 Fire Season under P-77, et. al.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210108-
5228__;!!KNMwiTCp4spf!Wpj3UKjAcJ1zDFJapZW16jWwEpm54IXeDHzsA5whfhwmCsededU60lEfBK0KHxG4RaPbWE5EQ9k$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Wpj3UKjAcJ1zDFJapZW16jWwEpm54IXeDHzsA5whfhwmCsededU60lEfBK0KHxG4RaPbWpEeaXc$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Wpj3UKjAcJ1zDFJapZW16jWwEpm54IXeDHzsA5whfhwmCsededU60lEfBK0KHxG4RaPbWd2zTaE$
or for phone support, call 866-208-3676.
tƚǞĻƩ DĻƓĻƩğƷźƚƓ 245 Market Street
San Francisco, CA 94105
Mailing Address:
Mail Code N11D
P.O. Box 770000
San Francisco, CA 94177
January 8, 2021
Via Electronic Submittal (E-File)
Mr. Frank Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Control of Debris from the 2020 Fire Season
FERC Project Nos. 77-CA, 96-CA, 619-CA, 803-CA, 1354-CA, 1962-CA, 2107-CA
ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE
Dear Mr. Blackett:
This letter responds to the Federal Energy Regulatory Commission (FERC) November
24, 2020 letter requesting that Pacific Gas and Electric Company (PG&E) provide
information regarding potential impacts that may exist throughout PG&E hydroelectric
system as a result of the 2020 fire season.
request for information, PG&E has enclosed a summary of its
FERC projects located within areas that experienced wildfires in 2020, specific information
regarding assessment of the affectedareas, and PG&E efforts to protect project
features (Enclosure 1).
dam safety engineer, Mr. Ben Fontana, at (530) 762-9459. For general questions, please
Ms. Jamie Visinoni, at (530) 215-6676.
Sincerely,
Elisabeth Rossi
Supervisor, Hydro Licensing
Enclosure: CUI//CEII DO NOT RELEASE
1. PG&E Response Control of Debris from the 2020 Fire Season