Loading...
HomeMy WebLinkAbout01.08.21 BOS Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-1354-000,et al. by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Project Operations Compliance Report submitted in FERC P-1354-000,et al. by Pacific Gas and Electric Company,et al. Date:Friday, January 8, 2021 2:26:54 PM See the email below. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, January 8, 2021 2:05 PM Subject: Project Operations Compliance Report submitted in FERC P-1354-000,et al. by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/8/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-1354-000 P-1962-001 P-2107-000 P-619-000 P-77-001 P-803-000 P-96-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits Control of Debris from the 2020 Fire Season under P-77, et. al. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210108- 5228__;!!KNMwiTCp4spf!Wpj3UKjAcJ1zDFJapZW16jWwEpm54IXeDHzsA5whfhwmCsededU60lEfBK0KHxG4RaPbWE5EQ9k$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Wpj3UKjAcJ1zDFJapZW16jWwEpm54IXeDHzsA5whfhwmCsededU60lEfBK0KHxG4RaPbWpEeaXc$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Wpj3UKjAcJ1zDFJapZW16jWwEpm54IXeDHzsA5whfhwmCsededU60lEfBK0KHxG4RaPbWd2zTaE$ or for phone support, call 866-208-3676. tƚǞĻƩ DĻƓĻƩğƷźƚƓ 245 Market Street San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 January 8, 2021 Via Electronic Submittal (E-File) Mr. Frank Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Control of Debris from the 2020 Fire Season FERC Project Nos. 77-CA, 96-CA, 619-CA, 803-CA, 1354-CA, 1962-CA, 2107-CA ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE Dear Mr. Blackett: This letter responds to the Federal Energy Regulatory Commission (FERC) November 24, 2020 letter requesting that Pacific Gas and Electric Company (PG&E) provide information regarding potential impacts that may exist throughout PG&E hydroelectric system as a result of the 2020 fire season. request for information, PG&E has enclosed a summary of its FERC projects located within areas that experienced wildfires in 2020, specific information regarding assessment of the affectedareas, and PG&E efforts to protect project features (Enclosure 1). dam safety engineer, Mr. Ben Fontana, at (530) 762-9459. For general questions, please Ms. Jamie Visinoni, at (530) 215-6676. Sincerely, Elisabeth Rossi Supervisor, Hydro Licensing Enclosure: CUI//CEII DO NOT RELEASE 1. PG&E Response Control of Debris from the 2020 Fire Season