Loading...
HomeMy WebLinkAbout01.08.21 BOS Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-137-000,et al. by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian; Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-137-000,et al. by Pacific Gas and Electric Company,et al. Date:Friday, January 8, 2021 1:51:11 PM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, January 8, 2021 1:35 PM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-137-000,et al. by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/8/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas and Electric Company (as Agent) Docket(s): P-137-000 P-1988-000 P-2130-000 P-2310-000 P-77-001 P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits an Status Update and Extension of Time Request for the Potter Valley Hydroelectric Projects, et under P-77. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210108- 5208__;!!KNMwiTCp4spf!TX6okYx0lomUx498LgYjVK3BtK604_1eA32iufTxz7q1oP5YNc3QcyIbN2b3Ub2X_fPtRIB4MDE$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!TX6okYx0lomUx498LgYjVK3BtK604_1eA32iufTxz7q1oP5YNc3QcyIbN2b3Ub2X_fPtdkDmz9M$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!TX6okYx0lomUx498LgYjVK3BtK604_1eA32iufTxz7q1oP5YNc3QcyIbN2b3Ub2X_fPtj0xPlPs$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 January 8, 2021 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Coming Due Items: Status Updateand Extension of Time Request Potter Valley Hydroelectric Project, FERC Project No. 77 Mokelumne River Hydroelectric Project, FERC Project No. 137 DeSabla-Centerville Hydroelectric Project, FERC Project No. 803 Haas-Kings River Project, FERC Project No. 1988 Spring Gap-Stanislaus Hydroelectric Project FERC Project No. 2130 Drum-Spaulding Hydroelectric Project, FERC Project No. 2310 Dear Mr. Blackett: Pacific Gas and Electric Company (PG&E) has reviewed the upcoming Federal Regulatory Commission (FERC) compliance items coming due by January 31, 2021. The enclosed table of upcoming due items (Enclosure 1) presents a summary table listing the items, them. By way of this letter, PG&E respectfully requests an extension of time for these items. Should you have any technical questions concerning this matter, please contact PG&E Chief Dam Safety Engineer, Mr. David Ritzman, P.E. at (415) 264-1795. For general questions, please contact me at (415) 531-5186. Sincerely, Elisabeth Rossi Supervisor, Hydro License Compliance Enclosure: 1. Table of Upcoming Due Items ENCLOSURE 1 MOST RECENT EXTENSION OF TIME FERC Project No.OVERDUE ITEMSCORRESPONDEDUE DATEPG&E STATUS BEING REQUESTED NCETHIS LETTER 772019 11th PART 12D INSPECTION- SCOTT 9/1/20201/31/2021Evaluation is in progress. Additional time needed to finalize the evaluation for the Independent 6/30/2021 DAM R-30: Contingency Plan for LeaksConsultant review. 772019 11th PART 12D INSPECTION- SCOTT 9/1/20201/31/2021Delays in instrumentation upgrades this fall that impacted the planning of this recommendation, which is 6/30/2021 DAM R-12: Flow Measurement System tied to R-9. Additional time needed to coordinate efforts to address this recommendation. Install 77 2019 11th PART 12D INSPECTION- SCOTT 9/1/20201/31/2021Coordinating with ATS to set inspection date to inspect the weir extensions with a push camera. 6/30/2021 DAM R-10: Weir E-1A, B, and C ExtensionsAdditional time needed to coordinate and finalize scope. 772019 11th PART 12D INSPECTION- SCOTT 9/1/20201/31/2021Delays in instrumentation upgrades this fall that impacted the planning of this recommendation, which is 6/30/2021 DAM R-9: Gallery Piezometerstied to R-12. Additional time needed to coordinate efforts to address this recommendation. 2310 2018 PART 12D INSPECTION- FORDYCE R-1/22/20201/31/2021FERC has requested additional structural analysis of the back wall of the valve house. The outcome of the 10/31/2021 15: patch rear wall of valve housenew alaysis may impact the repair methods used for the crack in the back wall. Requesting an extension of time to allow for new analysis to be complete prior to finalizing crack repair plan. 1372017 11th P12D INSPECTION-LOWER BEAR 12/8/20201/31/2021Consultant is working to address PG&E comments. Additional time needed to finalize the report on 6/30/2021 DAM F-6 PMF Overtopping Studyerosion potential. 1372017 11th P12 Inspection - Salt Springs F-2 9/28/20201/31/2021Consultant is revising final report based on comments from PG&E. The final report will need internal 6/30/2021 Evaluate Potential for PMF Overtoppingreview and will be provided to part 12D consultant for acceptance prior to submitting to FERC. 2310 2018 PART 12D INSPECTION- WISE FB R-5: 4/6/20201/31/2021Desktop study and field reconnaissance are complete. Additional analysis is planned in conjunction with 2/28/2021 Update OPM w/ spill capacitythe ongoing project to mitigate potential impacts of water spilling over the service spillway to address Recommendation No. 1 from the fourth Part 12D safety inspection. PG&E is currently preparing a status update for Recommendation No. 1 from the fourth Part 12D safety inspection and respectfully requests an extension of time to provide additional detail for this item until the pending update for Recommnedation 1 is complete. 1372017 11th P12d Insp- Lake Tabeaud Dam R-10/21/20201/31/2021Consultant is working to address PG&E comments. Additional time needed to finalize the report on the 6/30/2021 5: perform a hydraulic analysisextent of spillway erodibility. 1372017 11th P12d Insp- Lake Tabeaud Dam R-8/25/20201/31/2021PG&E has received concurrence from the IC with the stability analysis conducted by PG&E Geosciences. 6/30/2021 9: stability analysis of the spillway weirThe results of the stability analysis conclude the spillway is unstable with flashboards installed. Request an EOT to allow time to coordinate with stakeholders to determine if permanent removal of the flashboards is to be pursued. 2130Stanislaus Forebay East Dam LLO 10/15/20202/1/2021Report preparation is in progress. 4/16/2021 Abandonment Final Construction Report 19882020 Third 10-Year Detailed Radial Gate 7/8/20201/31/2021PG&E has initiated an in-depth review and condition assessment of the performance of the Gate 1 fixed 9/30/2021 Inspection Report Haas-Kings River hoist motor. PG&E performed additional field testing of the hoist motor in August 2020 during annual Hydroelectric Project Wishon Dam R-3: maintenance and spillway gate operations. The results of this field testing and spillway gate operation Perform additional in-depth testing of and were shared with FERC in a letter dated December 28, 2020. Because of delays in scheduling additional calculations for the Gate 1 fixed hoist site investigations, additional time is needed to review and identify methods of modifying the amperage motortesting instrumentation points at Gate 1. Additional field testing, following winter and spring months when access to the spillway is regained, is needed.