Loading...
HomeMy WebLinkAbout01.08.21 BOS Correspondence - FW_ Supplemental_Additional Information submitted in FERC P-2088-000 by Individual No Affiliation,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod; Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami; Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Supplemental/Additional Information submitted in FERC P-2088-000 by Individual No Affiliation,et al. Date:Friday, January 8, 2021 8:06:40 AM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, January 8, 2021 5:25 AM Subject: Supplemental/Additional Information submitted in FERC P-2088-000 by Individual No Affiliation,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/8/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Individual No Affiliation South Feather Water & Power Agency (as Agent) Docket(s): P-2088-000 Lead Applicant: South Feather Water and Power Agency Filing Type: Supplemental/Additional Information Description: South Feather Water and Power Agency submits responses to the December 8, 2020 comments on the 11th Independent Consultant's Safety Inspection Report etc. for the South Feather Power Projectunder P-2088. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210108- 5012__;!!KNMwiTCp4spf!WRY0eyQC8V6o-G- HUBNSAejf5GO8QtqrwSziT8BihWtXAe4q8IMsFDJxjljthmnQHaS_Ig_fQ9A$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!WRY0eyQC8V6o- G-HUBNSAejf5GO8QtqrwSziT8BihWtXAe4q8IMsFDJxjljthmnQHaS_1WvN2so$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!WRY0eyQC8V6o-G- HUBNSAejf5GO8QtqrwSziT8BihWtXAe4q8IMsFDJxjljthmnQHaS_zvvavDc$ or for phone support, call 866-208-3676. January 7, 2021 Electronically Filed Frank L. Blackett, P.E., Regional Engineer 100 First Street, Suite 2300 San Francisco, CA 94105 RE:South Feather Power Project (FERC No. 2088) South Fork Power Project STID updates Dear Mr. Blackett, This letter serves as a response to your letter dated December 9, 2020 providing comments on the submission of the Seismic Stability Evaluation of Sly Creek Dam, and associated letter dated January 31, 2017 from Mr. Kyle Morgado, formerly of this Agency. Additionally, you provided further correspondence on December 30, 2020 requesting a plan and schedule for updates to the STIDs for the Little Grass Valley, Lost Creek, Sly Creek, Ponderosa, and Miners Ranch Dam. Your comments for each specific dam will be addressed and submitted to you no later than March 31, 2021, the annual due date for revisions to Agency STIDs. If you have any questions related to this transmittal, please feel free to contact me at (530) 534-1221 . x 265, or via email at kmckillop@southfeather.com Sincerely, South Feather Water and Power Agency Kristen McKillop Compliance and Regulatory Manager cc: Rath Moseley, General Manager Dan Leon, Power Division Manager January 7, 2021 Electronically Filed Frank L. Blackett, P.E., Regional Engineer 100 First Street, Suite 2300 San Francisco, CA 94105 RE:South Feather Power Project (FERC No. 2088) Lost Creek Dam – Eleventh Independent Consultant’s Safety Inspection Report Dear Mr. Blackett, This letter serves as a response to your letter dated December 8, 2020 providing comments on a the submission of the the 11th Independent Consultant’s Safety Inspection Report (Part 12D report) and Potential Failure Mode Analysis (PFMA) Addendum Report for Lost Creek Dam, and associated letter dated December 13, 2017 from Mr. Kyle Morgado, formerly of this Agency. Your comments will be addressed and submitted to you no later than February 26, 2021. If you have any questions related to this transmittal, please feel free to contact me at (530) 534-1221 . x 265, or via email at kmckillop@southfeather.com Sincerely, South Feather Water and Power Agency Kristen McKillop Compliance and Regulatory Manager cc: Rath Moseley, General Manager Dan Leon, Power Division Manager