Loading...
HomeMy WebLinkAbout12.28.20 BOS Correspondence - FW_ Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Kimmelshue, Tod;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. Date:Monday, December 28, 2020 9:40:13 AM Good morning Supervisors, Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, December 24, 2020 10:55 AM Subject: Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/23/2020, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company PGE (as Agent) Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Annual Spill Gate Testing Report Description: Annual Spillway Gate Operation Certificate for Poe Dam of Pacific Gas and Electric Company under P-2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20201223- 5219__;!!KNMwiTCp4spf!UwKSRq6rJ7Si2KEGA7pR6kRDhIgJUXeRSIGD3tm_KqVPyywTBAZG-n73jIB4srYIJFHI8xqWRX8$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!UwKSRq6rJ7Si2KEGA7pR6kRDhIgJUXeRSIGD3tm_KqVPyywTBAZG- n73jIB4srYIJFHIyN2oXfI$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!UwKSRq6rJ7Si2KEGA7pR6kRDhIgJUXeRSIGD3tm_KqVPyywTBAZG- n73jIB4srYIJFHIIjmlbms$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 December 23, 2020 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E. Regional Engineer San Francisco Regional Office Federal Energy Regulatory Commission 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Poe Hydroelectric Project, FERC No. 2107 Annual Spillway Gate Operation Certificates ENCLOSURES CONTAIN CUI//CEII - DO NOT RELEASE Dear Mr. Blackett: Enclosed is the notarized certificate for the 2020 spillway gate operations for the following dam: FERC Project Dam Name Gate Type No. of Gates Poe Project Poe Radial 5 (FERC No. 2107) The certificate is being submitted pursuant to Part 12, Subpart E, Section 12.44 (b) of (Enclosure 1). In accordance with Chapter 14, Appendix L of the guidelines, annual spillway gate certificates should provide comment on apparent trends or unusual amperage readings. Phase current and voltage plots for all five gates are included in Enclosure 2. Amperage measurements for the radial bypass gate were below the motor amperage rating of 5.9 amps and averaged 4.5 amps. Voltage variations varied by 1.3V and were reasonably consistent with previous performance. Amperage measurements for gates 1 through 4, motors 1 and 2 were all approximately 12 amps. Amperage rating for these motors is 17.2 amps; therefore, there was no amperage exceedance for these motors. Previous years testing indicates similar results. Voltage variations were nominal during the 2020 gate testing. Variations in the results over the past five years are likely due to variant operational consistencies. Mr. Frank L. Blackett, P.E. December 23, 2020 Page 2 Dam & Civil Program Lead, Roy Arnold, at (559) 575-5122. For general questions, Mr. Matthew Joseph, at (415) 264-5244. Sincerely, Elisabeth Rossi Supervisor, Hydro Licensing Enclosures: (CONTAINS CUI/CEII DO NOT RELEASE) 1. Poe Dam 2020 Annual Spillway Gate Operation Certificate 2. Poe Dam (2020) Phase Current and Voltage Plots