Loading...
HomeMy WebLinkAbout01.22.21 BOS Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod; Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami; Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Friday, January 22, 2021 8:44:55 AM Good morning, Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, January 22, 2021 6:45 AM Subject: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/21/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits the Authorization Request for Toadtown Canal Undermining Repair Project for the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210121- 5355__;!!KNMwiTCp4spf!S_1L1Ed-Q0IjrsI19ePAbwzbclkCRKptek- nAONbV1SEbDfC03HI9VrkdEkUCZe8dIZYjIUsEv8$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!S_1L1Ed- Q0IjrsI19ePAbwzbclkCRKptek-nAONbV1SEbDfC03HI9VrkdEkUCZe8dIZYIHDkzis$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!S_1L1Ed- Q0IjrsI19ePAbwzbclkCRKptek-nAONbV1SEbDfC03HI9VrkdEkUCZe8dIZYoF86YMg$ or for phone support, call 866-208-3676. tƚǞĻƩ DĻƓĻƩğƷźƚƓ 245 Market Street San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 January 21, 2021 Via Electronic Submittal (E-file) Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Authorization Request for Toadtown Canal Undermining Repair ENCLOSURES CONTAIN CUI//CEII DO NOT RELEASE Dear Mr. Blackett: ) submittal package to repair undermining on the Toadtown Canal, which is part of PG&DeSabla- Centerville Hydroelectric Project, Federal Regulatory Commission (FERC) No. 803. To prevent a future canal failure,the proposed project will repair two adjacent sections of the Toadtown Canal that have been undermined by prior illegal mining activity and ongoing stormwater erosion. The construction will be completed during the spring 2021 Toadtown Canal outage, which is scheduled for April 1, 2021 through May 12, 2021. In support find the project description (Enclosure 1), approved-for-construction drawings (Enclosure 2), and quality control and inspection program (QCIP) (Enclosure 3) enclosed with this letter for FERC review. Ongoing shelter-in-place orders issued by the State of California in response to the COVID-19 pandemic require that nonessential PG&E staff work remotely, and hard copy filings are not practical at this time. If FERC requires two hard copies of the project documents, please contact the license coordinator identified below, and copies will be sent after the shelter-in-place restrictions have been lifted and PG&E staff have returned to their normal work locations. Mr. Frank L. Blackett, P.E., Regional Engineer January 21, 2021 Page 2 If you have technical questions concerning this matter, please contact dam safety engineer, Ms. Kaitlyn Thatcher, at (707) 342-7885, senior project engineer, Mr. Jonathan Edwards, at (530) 896-4400. For general questions, please senior license coordinator, Ms. Jamie Visinoni, at (530) 215-6676. Sincerely, Teri Smyly Manager, FERC Compliance Enclosures: CUI//CEII DO NOT RELEASE 1. Project Description, Toadtown Canal Undermining Project, prepared by PG&E, dated December 9, 2020 2. Approved for Construction Drawings and Specifications, Toadtown Canal Undermining Repair Project, prepared by PACE Engineering, dated March 20, 2020 3. Quality Control and Inspection Program for Toadtown Canal Mitigate Undermining, prepared by PG&E, dated November 30, 2020