Policy and Procedures
Policy Title: Water/Sewer Connection Fees
Policy Number: 1.210
Adopted: September 16, 2014
New Meter Installation Rates*
FY 2013/2014
Class I Class II Class III Class IV
1” $ 8,872.78 $ 9,269.85 $ 9,468.38 BID
Type A
1” $ 12,211.01 $ 13,323.31 $ 13,839.08 BID
Type B
1 ½” $ 18,027.83 $ 19,213.88 $ 19,865.61 BID
2” $ 38,730.83 $ 40,005.66 $ 40,671.61 BID
3” $ 61,889.46 $ 63,670.54 $ 64,780.83 BID
4” $ 94,205.09 $ 96,235.73 $ 97,535.85 BID
6” $158,157.43 $160,569.74 $162,192.04 BID
*For multiple units please see attached spreadsheet
Type A/B: Type A customers utilize the flow characteristics of a ¾” meter, but are
required to install a 1” meter per the California Fire Code, while Type B customers have
the potential to utilize a 1” flow meter to capacity.
Class I: Drop-in Connection – Includes a connection within infrastructure already
developed by others.
Class II: Main Side Connection – Includes a water connection which ties into the TWSD
water main on the same side of the road as the main line.
Class III: Cross Side Connection – Includes a water connection which ties into the TWSD
water main on the other side of the road as the main line. A road crossing is required.
Class IV: Jurisdictional – Includes a water connection which ties into the TWSD water
main within a roadway which required coordination with Caltrans, Butte County, City of
Oroville or other local jurisdiction.
Policy 1.210 / Page 1 of 2
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Sewer Connections**
FY 2013/2014
ZONE A ZONE B
$10,284.20 $10,411.92
50.00 PERMIT 50.00 PERMIT
$10,334.20 $10,461.92
125.00 LATERAL 125.00 LATERAL
$10,459.20 $10,586.92
** Extension fees on some properties.
This policy was approved at the September 16, 2014 Board of Directors meeting by the
following votes.
Following vote:
Ayes: Directors Hatley, Pulley, Taggart, Thompson and Reynolds
Nayes:
Abstentions:
Absent:
_____________________________
Ernest Reynolds, President
_______________________________
Jayme Boucher, Secretary
Policy 1.210 / Page 2 of 2
Policy 7165 Page 1 of 3
Thermalito Water & Sewer District
Policy and Procedures
Policy Title: Planning and Inspection Fees and Bonds
Policy Number: 7165
Adopted:
Review and Inspection Fees
The Owner will pay all direct and indirect costs incidental to review by Thermalito Water
and Sewer District or by its consultants or agents calculations, plans, specifications, cost
estimates, property descriptions, right-of-ways, and easement verification, permits and
for the complete improvement of water and sewer systems and will pay all direct and
indirect costs incidental to the construction inspection, permits, licenses, bonds, easement
verification expenses, administration and the preparation of “As-Built” drawings. All fee
deposit calculations shall be rounded to the nearest whole dollar amount. Without
limiting the foregoing, Thermalito Water and Sewer District engages an engineering firm
to review all plans, specifications and legal descriptions and to inspect and accept works
of improvement, the fees and costs of which shall be paid by the Owner.
Planning Review Fees
Concurrently with the submittal of calculations, plans, specifications, cost estimates, legal
property descriptions and legal utility easements to Thermalito Water and Sewer District
for conceptual review, the Owner will advance in cash or check funds for Plan Review
and the Plan Checking Fee Advance calculated in accordance with the following
schedules:
Plan Review – Concept Acceptance (non-refundable)
1. Parcel Maps (TID’s Contracted Engineer will determine and assess fee by time
and labor for each review.)
2. Subdivision (TID’s Contracted Engineer will determine and assess fee by time
and labor for each review.)
3. Utility Easement verifications for water or sewer (TID’s Contracted Engineer will
determine and assess fee by time and labor for each review.
Plan Checking Fee Advance
Preliminary Construction Estimate Plan Checking Fee Advance Amount
Less than $10,000 5% of estimate ($250 minimum)
$10,000 - $100,000 1% of estimate ($500 minimum)
Greater than $100,000 ¾% of estimate ($1,000 minimum)
Policy 7165 Page 3 of 3
plans and specifications. The Bonds will remain in full force and effect until such time as
Thermalito Water and Sewer District accepts the Improvement System. Thermalito Water
and Sewer District will permit the conversion of a Performance Bond to a Maintenance
Bond.
Maintenance Bond
As a condition precedent to the acceptance of the complete improvement system, the
Owner shall furnish either a corporate surety maintenance bond of an acceptable surety
company, authorized to do business in the State of California, or an irrevocable letter of
credit issued by a banking firm acceptable to Thermalito Water and Sewer District.
Alternative methods of bonding may be utilized upon the approval of the Thermalito
Water and Sewer District Board of Directors. The bond shall protect Thermalito Water
and Sewer District against the results of faulty materials, poor workmanship, or defective
equipment. The bond shall be for a period of three (3) years after acceptance of the
project. Said bond or letter of credit shall be in a sum as shown in the table below:
Project Construction Costs Percentage
Up to $100,000 40
$100,000 to $1,000,000 30
Greater than $1,000,000 20