Loading...
HomeMy WebLinkAbout01.27.21 BOS Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Wednesday, January 27, 2021 1:18:18 PM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, January 27, 2021 1:05 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/27/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits the Updated Supporting Technical Information Document for the DeSabla- Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20210127-5181__;!!KNMwiTCp4spf!Qg2y2KSN9VybByQtTX4E5zV5p6Kgtse- 13I2yxLKZACTo4zCGlRXXCgL7_iOb4hVQJmPjfb19IE$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Qg2y2KSN9VybByQtTX4E5zV5p6Kgtse- 13I2yxLKZACTo4zCGlRXXCgL7_iOb4hVQJmPFKi_yT4$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Qg2y2KSN9VybByQtTX4E5zV5p6Kgtse- 13I2yxLKZACTo4zCGlRXXCgL7_iOb4hVQJmPQ-R-pSk$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 January 27, 2021 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Updated Supporting Technical Information Document ENCLOSURE CONTAINS CUI/CEII DO NOT RELEASE Dear Mr. Blackett: This letter presents an updated supporting technical information document (STID) for Philbrook Dam, which is part of PG&E) DeSabla- Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. A copy of the updated STID (Revision 5, dated January 2021) is provided as Enclosure 1 with this letter. The enclosed STID includes updates and revisions to address Recommendations 13 and 14 (R-13 and R-14) from the 11th 5-year Part 12D safety inspection report for Philbrook Dam, which was prepared by Independent Consultant Mr. Marc Ryan, P.E., G.E., and dated October 2020. PG&E submitted its plans and schedules to address R-13 and R-14 in a letter to your office dated December 31, 2020. For reference, R-13 and R-14 are copied below: R-13: It is recommended that the observation from the 2016 gate inspection should be added to Section 9 of the STID. R-14: It is recommended that Section 10 of the STID be updated to include all correspondence between PG&E and FERC for the last 5 years. PG&E has updated Section 9 of the STID to include a summary of the 2016 detailed radial gate inspection (per R-13) and Section 10 of the STID to include correspondence between Mr. Frank L. Blackett, P.E., Regional Engineer January 27, 2021 Page 2 PG&E and FERC for the last 5 years (per R-14). Accordingly, PG&E believes that R-13 and R-14 have been satisfactorily addressed and no further action is necessary. Ongoing shelter-in-place orders issued by the State of California in response to the COVID-19 pandemic require that nonessential PG&E staff work remotely, and hard copy filings are not practical at this time. If FERC requires hard copies of this letter and/or enclosure, please contact the license coordinator identified below. If necessary, hard copies will be sent after the shelter-in-place restrictions have been lifted and PG&E staff have returned to their normal work locations. Should you have any technical ques dam safety engineer, Ms. Aimee Corn, at (303) 921-2020. For general questions, please -6676. Sincerely, David L. Ritzman, P.E., G.E. Chief Dam Safety Engineer Enclosure: CUI//CEII DO NOT RELEASE 1. Philbrook Dam Supporting Technical Information Document, Revision 5, dated January 2021 (electronic file provided in 11 parts)