HomeMy WebLinkAbout01.27.21 BOS Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
From:Schuman, Amy
To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett,
Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug
Subject:BOS Correspondence - FW: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
Date:Wednesday, January 27, 2021 1:18:37 PM
Please see the email below from FERC.
Amy Schuman
Associate Clerk of the Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120
Twitter | Facebook | YouTube | Pinterest
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, January 27, 2021 12:50 PM
Subject: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 1/27/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
No Organization Found (as Agent)
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Project Operations Compliance Report
Description: Pacific Gas and Electric Company submits Updated Supporting Technical Information Document for the DeSabla Centerville Hydroelectric Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210127-
5173__;!!KNMwiTCp4spf!Sgi6WlJhGC6hJoVf79C9sv4BchY25AdJBz9NnqtXTx6NSRFRaKjNg15ArLQkr_-E0Mhc-KW5bjk$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Sgi6WlJhGC6hJoVf79C9sv4BchY25AdJBz9NnqtXTx6NSRFRaKjNg15ArLQkr_-
E0MhcazCGPx0$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Sgi6WlJhGC6hJoVf79C9sv4BchY25AdJBz9NnqtXTx6NSRFRaKjNg15ArLQkr_-
E0Mhcog0wXeg$
or for phone support, call 866-208-3676.
245 Market Street
tƚǞĻƩ DĻƓĻƩğƷźƚƓ
San Francisco, CA 94105
Mailing Address:
Mail Code N11D
P.O. Box 770000
San Francisco, CA 94177
January 27, 2021
Via Electronic Submittal (E-File)
Mr. Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Round Valley Dam, NATDAM No. CA00346
Updated Supporting Technical Information Document
ENCLOSURE CONTAINS CUI/CEII DO NOT RELEASE
Dear Mr. Blackett:
This letter presents an updated supporting technical information document (STID) for Round
DeSabla-Centerville
Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. A copy of the
updated STID (Revision 1, dated January 2021) is provided as Enclosure 1 with this letter.
The enclosed STID includes updates and revisions to address Recommendations 13, 16, 17,
18, 21, 23, and 24 (R-13, R-16, R-17, R-18, R-21, R-23, and R-24) from the second 5-year
Part 12D safety inspection report for Round Valley Dam, which was prepared by Independent
Consultant Mr. Marc Ryan, P.E., G.E., and dated October 2020. PG&E submitted its plans and
schedules to address these recommendations in a letter to your office dated December 31,
2020.
For reference, R-13, R-16, R-17, R-18, R-21, R-23, and R-24 are copied below:
R-13: Update Section 2, Project Description, to change all references to the Butte
Powerhouse to Toadtown Powerhouse.
R-16: Update Figure 2-7 (DWG No. 364028, Rev. 1) with DWG No. 364028, Rev. 5.
R-17: Add DWG No. 357627 showing that the seepage collection pipe from the right side
was routed over the low-level outlet.
R-18: Update text to include the fact that some of the 1994 seepage collection pipes are
4-inches in diameter, the vault was not installed and there are instead 5 separate
discharge points, the permeable material used in the filter blanket is not Caltrans
Mr. Frank L. Blackett, P.E., Regional Engineer
January 27, 2021
Page 2
Class 1B permeable material. Add discussion of how the seepage collection pipe
from the right side was routed over the low-level outlet.
R-21: It is recommended either adding references to Figures 5-3a and 5-3b in the text of
Section 5.1 of the STID or removing the figures.
R-23: It is recommended that Section 7 of the STID should be updated to the most recent
DSSMP/R.
R-24: It is recommended that Section 10 of the STID should be updated to include all
correspondence between PG&E and FERC for the last 5 years.
Section 2 of the STID has been revised to change references to the Butte Powerhouse to
Toadtown Powerhouse (per R-13), update Figure 2-7 (i.e., replace Drawing No. 364028, Rev.
1 with Drawing No. 364028, Rev. 5, per R-16), include relevant drawings showing the seepage
collection pipes (per R-17), and provide additional details pertaining to the seepage collection
system (per R-18). In Section 5, PG&E added references to Figures 5-3a (now Figure 5-2) and
5-3b (now Figure 5-3) in Section 5.1 (per R-21). PG&E also updated Section 7 to include the
most recent (2019 record year) dam safety surveillance and monitoring plan and report (per R-
23) and Section 10 to include correspondence between PG&E and FERC for the last 5 years
(per R-24). Accordingly, PG&E believes that R-13, R-16, R-17, R-18, R-21, R-23, and R-24
have been satisfactorily addressed and no further action is necessary.
Ongoing shelter-in-place orders issued by the State of California in response to the COVID-19
pandemic require that nonessential PG&E staff work remotely, and hard copy filings are not
practical at this time. If FERC requires hard copies of this letter and/or enclosures, please
contact the license coordinator identified below. If necessary, hard copies will be sent after the
shelter-in-place restrictions have been lifted and PG&E staff have returned to their normal
work locations.
safety engineer, Ms. Aimee Corn, at (303) 921-2020. For general questions, please contact
-6676.
Sincerely,
David L. Ritzman, P.E., G.E.
Chief Dam Safety Engineer
Enclosure: CONTAINS CUI//CEII DO NOT RELEASE
Round Valley Dam Supporting Technical Information Document, Revision 1, dated January
2021 (electronic file provided in 11 parts)