Loading...
HomeMy WebLinkAbout01.28.21 BOS Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod; Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami; Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Thursday, January 28, 2021 3:18:42 PM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, January 28, 2021 2:45 PM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/28/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits Grizzly Forebay Dam-Low Level Outlet Modification Final Construction Report for Creek-Grizzly Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210128- 5207__;!!KNMwiTCp4spf!Uvs8p_P44O5N-I- uXDxPWyOb_IZ4YBSCilQXLpSuH8RpiQz_TXbZlnaVL32yOTxnltUYT9U0rAc$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Uvs8p_P44O5N-I- uXDxPWyOb_IZ4YBSCilQXLpSuH8RpiQz_TXbZlnaVL32yOTxnltUYAeW9B9A$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Uvs8p_P44O5N-I- uXDxPWyOb_IZ4YBSCilQXLpSuH8RpiQz_TXbZlnaVL32yOTxnltUYNcXRdkk$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 January 28, 2021 San Francisco, CA 94177 Via Electronic Submittal (E-File) Hard copy to follow via U.S. Mail Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek-Grizzly Hydroelectric Project, No. 619-CA Grizzly Forebay Dam Low Level Outlet Modification Final Construction Report ENCLOSURE CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION (CUI//CEII) - DO NOT RELEASE Dear Mr. Blackett: In a letter to Pacific Gas and Electric Company (PG&E), dated May 8, 2020, the Federal Energy Regulatory Commission (FERC) granted authorization for construction of PG&E Grizzly Forebay Dam Low Level Outlet Modification project, part of the Bucks Creek-Grizzly Hydroelectric Project, FERC No. 619. Construction of the Grizzly Forebay Dam Low Level Outlet Modification project was completed on September 2, 2020. Enclosed you will find the Final Construction Report which includes as-built drawings and verified construction certifications from the Design Engineer, Quality Control Manager, and Licensee (PG&E). Due to the ongoing shelter-in-place orders issued by the State of California in response to the COVID-19 pandemic, non-essential PG&E staff are currently working remotely, and hard copy filings are not possible at this time. If you require a hard copy of the letter and/or enclosure, please provide this request in your response and copies will be sent after the shelter-in-place restrictions have been lifted and PG&E staff have returned to their normal work locations. Should you have questions, license coordinator, Jamie Visinoni, at (530) 215-6676. Sincerely, Teri Smyly Manager, FERC Compliance Enclosure: CUI//CEII DO NOT RELEASE 1. Final Construction Report