Loading...
HomeMy WebLinkAbout01.29.21 BOS Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy; Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Friday, January 29, 2021 1:06:04 PM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, January 29, 2021 1:05 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 1/29/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits the11th Part 12D Safety Inspection Report for the Bucks Creek-Grizzly Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210129- 5280__;!!KNMwiTCp4spf!RE7d0HppgLSgydfLirqLNfrv8CruujSSos5juWBBvotXtY0bVANRxv8laV9LHBsOGsSIOPlANsA$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!RE7d0HppgLSgydfLirqLNfrv8CruujSSos5juWBBvotXtY0bVANRxv8laV9LHBsOGsSIc- V3nyA$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling- help.asp__;!!KNMwiTCp4spf!RE7d0HppgLSgydfLirqLNfrv8CruujSSos5juWBBvotXtY0bVANRxv8laV9LHBsOGsSIMq14XCM$ or for phone support, call 866-208-3676. tƚǞĻƩ DĻƓĻƩğƷźƚƓ 245 Market Street San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 January 29, 2021 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek-Grizzly Hydroelectric Project, FERC No. 619-CA Bucks Diversion (Lower Bucks Lake) Dam, NATDAM No. CA00331 11th Part 12D Safety Inspection Report ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE Dear Mr. Blackett: This letter presents the 11th Part 12D safety inspection report for Bucks Diversion (Lower Bucks Lake) Bucks Creek-Grizzly Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. The dam was inspected and the safety inspection report was prepared under the direction of Mr. William Rettberg, P.E., and Mr. Chad M. Masching, P.E., in accordance with FERC Order No. 122. FERC authorized Mr. Rettberg and Mr. Masching to serve as the independent consultants (IC) for Bucks Diversion Dam in a letter dated June 2, 2020. FERC granted an extension of time for the submittal of the safety inspection report, from November 1, 2020 to February 1, 2021, in a letter to PG&E dated October 15, 2020. Copies of the safety inspection report are enclosed with this letter (Enclosure 1). In accordance with Part 12D, Section 12.39, of the FERC regulations, PG&E will submit a plan and schedule for addressing the ICs recommendations provided in the safety inspection report. The plan and schedule will be submitted to your office by April 2, 2021. As a result of the ongoing shelter-in-place orders issued by the State of Californi response to COVID-19 pandemic, nonessential PG&E staff are working remotely, and enclosed documents, please contact the license coordinator identified below, and copies will be sent after the shelter-in-place restrictions have been lifted and PG&E staff have Mr. Frank L. Blackett, P.E., Regional Engineer January 29, 2021 Page 2 Should you have any questions or need further information concerning the technical aspects on this matter, please contsenior dam safety engineer, Mr. Ben Fontana, at (530) 762-9459. coordinator, Ms. Jamie Visinoni, at (530) 215-6676. Sincerely, Teri Smyly Manager, FERC Compliance Enclosure: CUI//CEII DO NOT RELEASE 1. Eleventh Safety Inspection Report, Bucks Diversion Dam, prepared by GEI Consultants and dated January 2021 cc: via ESFT Ms. Sharon Tapia, Chief Department of Water Resources Division of Safety of Dams