Loading...
HomeMy WebLinkAbout02.01.21 BOS Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Monday, February 1, 2021 10:33:36 AM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, February 1, 2021 10:25 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/1/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas and Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submit 11th Part 12D Safety Inspection, Recommendation 8, Request for Extension of Time for the DeSabla-Centerville Hydroelectric Project Philbrook Dam under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210201- 5113__;!!KNMwiTCp4spf!Ttj0PDNfBoE9Dm_YSsEBIZmTwBZD9gbApWIj6tf5Lw2w_oFPLSiyHheY4BEsiiMoN1__V54FU3k$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Ttj0PDNfBoE9Dm_YSsEBIZmTwBZD9gbApWIj6tf5Lw2w_oFPLSiyHheY4BEsiiMoN1__p79J4gU$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Ttj0PDNfBoE9Dm_YSsEBIZmTwBZD9gbApWIj6tf5Lw2w_oFPLSiyHheY4BEsiiMoN1__FbUDtqM$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 February 1, 2021 San Francisco, CA 94177 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 11th Part 12D Safety Inspection, Recommendation 8 Request for Extension of Time Dear Mr. Blackett: This letter requests an extension of time, to November 30, 2025, to complete action items related to Recommendations 8 (R-8) from the 11thPart 12D safety inspection report for Philbrook Dam, which is part of Pacific Gas and Electric Company DeSabla- Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. For reference, R-8 is copied below (in italics) with an updated plan and schedule to address the recommendation. R-8: Update Section 2, Project Description with the spillway rating curve and zero freeboard capacity using the results of the 2017 spillway routing study. PG&E filed the 2017 probable maximum flood study (prepared by HDR) with FERC on March 15, 2017 and is awaiting comment. PG&E will submit to FERC a plan and schedule for updating Section 2 of the Philbrook Dam supporting technical information document (STID) to include the spillway rating curve and zero freeboard capacity within 90 days after receiving notice that FERC has accepted the results of the study. If FERC has not accepted the study before the next Part 12D safety inspection, PG&E will review the status of the study with the next Part 12D independent consultant by November 1, 2025. Should you have any technical questions concerning this matter, please contact me at (415) 264-1795. FERC compliance manager, Ms. Teri Smyly, at (415) 624-4218. Sincerely, David L. Ritzman, P.E., G.E. Chief Dam Safety Engineer