Loading...
HomeMy WebLinkAbout02.01.21 BOS Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-2105-000,et al. by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lambert, Steve;Lucero, Debra;McCracken, Shari;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami; Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-2105-000,et al. by Pacific Gas and Electric Company,et al. Date:Monday, February 1, 2021 9:01:52 AM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, February 1, 2021 6:05 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-2105-000,et al. by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/1/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas and Electric Company (as Agent) Docket(s): P-2105-000 P-2155-001 P-2310-000 P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits Status Update and Request for Extension of Time under P-2310, et. al. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210201- 5020__;!!KNMwiTCp4spf!QXrPRdFbr2CVh8HOpeShOV2YEmDEhWbYos8m8PEynpqoCW3t2dHWsR_y6cn_UGKGQVrfwarglGo$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!QXrPRdFbr2CVh8HOpeShOV2YEmDEhWbYos8m8PEynpqoCW3t2dHWsR_y6cn_UGKGQVrfyBPgDx8$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!QXrPRdFbr2CVh8HOpeShOV2YEmDEhWbYos8m8PEynpqoCW3t2dHWsR_y6cn_UGKGQVrfEBpak_s$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 January 29, 2021 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 Re: Status Update and Request for Extension of Time Drum-Spaulding Hydroelectric Project, FERC No. 2310 DeSabla-Centerville Hydroelectric Project, FERC No. 803 Upper North Fork Feather River Hydroelectric Project, FERC No. 2105 Chili Bar Hydroelectric Project, FERC No. 2155 Dear Mr. Blackett: In accordance with ongoing efforts for continuous improvement in achieving timely responses to filings requested in numerous letter presents in Enclosure 1, an update on the status of efforts to address near-term coming due items. The status of efforts for items for not yet resolved includes Extension of Time (EOT) requests. Should you have any technical questions concerning this matter, please contact PG&E chief dam safety engineer, Mr. Dave Ritzman, at (415) 264-1795. For general questions, please contact Manager of FERC Compliance, Teri Smyly, at (415) 624-4218. Sincerely, Teri Smyly Manager, FERC Compliance Enclosure: Status Update and Extension of Time Request Time Date for 3/15/20211/31/20221/31/20225/30/20215/30/20214/30/20216/30/20218/31/20218/31/2021 Requested Extension of PG&E Status for Extension of Time Request Developing a plan and schedule to from their 12/16/2020 letter. Evaluating potential alternatives for reducing inflows and dewatering the gallery.Completing investigation on waterproofing the gallery access doors as part of the gallery study proposed in relation to R-4. New ladder rung installed on the spillway access ladder and will provide photos. Rocks in the spillway channel broken up and will provide photos. Report preparation is in progress. Completed the hydraulic modeling and analysis of the spillway channel and are currently reviewing the results of the analysis with the ICs. Currently working on the design package for the construction project to complete erosion protection improvements for the spillway channel. Currently working on the design package for the construction project to remove the trees during construction of the erosion protection. 1/13/20218/27/20208/27/20205/18/20203/29/20192/19/20192/19/2019 12/30/201912/30/2019 Most Recent Correspondence Date 01/30/202101/31/202101/31/202101/31/202101/31/202102/09/202102/28/202102/28/202102/28/2021 Current Due 830083828972828972830083830083824709829193830152830152 Dam Number ENCLOSURE 1 - STATUS UPDATE AND EXTENSION OF TIME REQUEST Description Fordyce Dam Geotechnical Investigation: Response to FERC comments2019 11th P12D Inspection Chili Bar: R4 - Gallery drainage study2019 11th P12D Inspection Chili Bar: R6 - Evaluate waterproofing gallery doors2018 P12D Inspection Fordyce: R-10 - Spillway Channel Access2018 P12D Inspection Fordyce: R-11 - Remove Boulders From SpillwayCaribou 1 Penstock Shotcrete Project Final Construction Report2018 P12D Inspection Halsey AB: R2 - Perform spillway routing study2018 P12D Inspection Upper Peak Lake: R-1 Armor masonry wall 2018 11th P12d Inspection-Upper Peak Lake: R-9 Vegetation adjacent to spillway No. 231021552155231023102105231023102310 FERC Project Time Date for 5/30/2021 Requested Extension of PG&E Status for Extension of Time Request Continuing investigation and evaluation of potential sources of the ponded water through the fall of 2020. A technical memorandum presenting the findings from the evaluation is currently being prepared for the ICs to review. 8/27/2020 Most Recent Correspondence Date 02/28/2021 Current Due 830083 Dam Number Description 2018 P12D Inspection Fordyce: R-16. Measure leakage through valvehouse. No. 2310 FERC Project