Loading...
HomeMy WebLinkAbout02.09.21 BOS Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod; Lucero, Debra;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen; Teeter, Doug Subject:BOS Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, February 9, 2021 11:37:56 AM Please see the email correspondence below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, February 9, 2021 9:25 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/9/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits Updated Supporting Technical Information Documents for the Bucks Storage Dam for the Bucks Creek-Grizzly Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210209- 5074__;!!KNMwiTCp4spf!WGpEk-VofrAKtArR9buAE02BN0niBl3KgB8_jOhZkS4nx_TPK_fPVH9XrB4Cke- wxk83bTEz7n0$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!WGpEk- VofrAKtArR9buAE02BN0niBl3KgB8_jOhZkS4nx_TPK_fPVH9XrB4Cke-wxk83sgqb0Rs$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!WGpEk- VofrAKtArR9buAE02BN0niBl3KgB8_jOhZkS4nx_TPK_fPVH9XrB4Cke-wxk83NaB166A$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 February 9, 2021 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek-Grizzly Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 Updated Supporting Technical Information Document ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE Dear Mr. Blackett: This letter presents Pacific Gas and Electric Company (PG&E) Revision 4 to the supporting technical information document (STID) for Bucks Storage Dam, which is part of PG&E Bucks Creek-Grizzly Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. The updated STID is enclosed with this letter (Enclosure 1). Ongoing shelter-in-place orders issued by the State of California in response to the COVID-19 pandemic require that nonessential PG&E staff work remotely, and hard copy filings are not practical at this time. If FERC requires hard copies of this letter and/or enclosure, please contact the license coordinator identified below. If necessary, hard copies will be sent after the shelter- in-place restrictions have been lifted and PG&E staff have returned to their normal work locations. safety engineer, Mr. Ben Fontana, at (530) 762-9459. For general questions, please contact , Ms. Jamie Visinoni, at (530) 215-6676. Sincerely, Teri Smyly Manager, FERC Compliance Enclosure: CUI//CEII DO NOT RELEASE 1. Bucks Storage Dam Supporting Technical Information Document, Revision 4, dated December 2020