HomeMy WebLinkAbout02.11.21 BOS Correspondence - FW_ Supplemental_Additional Information submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
From:Schuman, Amy
To:Alpert, Bruce; Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Kimmelshue, Tod; Lucero, Debra; Paulsen, Shaina; Pickett, Andy; Ring, Brian; Ritter, Tami;
Rodas, Amalia; Sweeney,
Kathleen; Teeter, Doug
Subject:BOS Correspondence - FW: Supplemental/Additional Information submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
Date:Thursday, February 11, 2021 1:45:48 PM
Please see the email below from FERC.
Amy Schuman
Associate Clerk of the Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120
Twitter | Facebook | YouTube | Pinterest
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, February 11, 2021 1:45 PM
Subject: Supplemental/Additional Information submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 2/11/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
No Organization Found (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Supplemental/Additional Information
Description: Pacific Gas and Electric Company submits Phase 2 Investigation Work Plan, Response to Comments for Bucks Creek-Grizzly Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210211-
5169__;!!KNMwiTCp4spf!RVV7eqxLBcgRgDfsAKU1SwfVLOhDU0RcKFd6BCqhn2DDo8Mrzqo0TEp8aqudmproghU5-zsenGw$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!RVV7eqxLBcgRgDfsAKU1SwfVLOhDU0RcKFd6BCqhn2DDo8Mrzqo0TEp8aqudmproghU5kyAnFac$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!RVV7eqxLBcgRgDfsAKU1SwfVLOhDU0RcKFd6BCqhn2DDo8Mrzqo0TEp8aqudmproghU5TYkkR-E$
or for phone support, call 866-208-3676.
245 Market Street
tƚǞĻƩ DĻƓĻƩğƷźƚƓ
San Francisco, CA 94105
Mailing Address:
Mail Code N11D
P.O. Box 770000
San Francisco, CA 94177
February 11, 2021
Via Electronic Submittal (E-File)
Mr. Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
San Francisco Regional Office
100 First Street Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek-Grizzly Hydroelectric Project, FERC No. 619-CA
Grizzly Forebay Dam, NATDAM No. CA00333
Phase 2 Investigation Work Plan, Response to Comments
ENCLOSURES CONTAIN CUI//CEII DO NOT RELEASE
Dear Mr. Blackett:
This letter presents supplementalinformationand responses to the Federal Energy
November 17, 2020 letter regarding Pacific Gas and
proceed with Phase 2 of the
concrete condition assessment project (Project) at Grizzly Forebay
Bucks Creek-Grizzly Hydroelectric Project, FERC No. 619. request for Project
authorization was submitted to your office on August 14, 2020.
PG&E also filed an application for authorization with the California Department of Water
Resources, Division of Safety of Dams (DSOD), on August 26, 2020. DSOD provided
comments on the application package in correspondence received on November 19,
2020 requesting that PG&E address several comments and clarify several technical
documents. The enclosed engineer-of-record memorandum (Enclosure 1), responds to
both DSOD and FERC comments.
application for authorization to proceed with the work, please find
the following documentation enclosed with this letter for FERC review:
Engineer-of-record memorandum addressing agency (FERC and DSOD) comments,
dated December 16, 2020 (Enclosure 1)
Revised investigation work plan, prepared by Mead & Hunt and dated December 16,
2020 (Enclosure 2)
Mr. Frank L. Blackett, P.E., Regional Engineer
February 11, 2021
Page 2
Temporary construction emergency action plan, prepared by Alternative Structural
Technologies and dated December 16, 2020 (Enclosure 3)
PG&E plans to perform this investigation at the earliest safe opportunity in the spring of
2021.
As a result of the ongoing shelter-in-place orders issued by the State of California in
response to the COVID-19 pandemic, nonessential PG&E staff are working remotely, and
hard copy filings are not possible at this time. If FERC requires a hard copy of this letter
and/or the enclosed documents, please contact the license coordinator identified below,
and copies will be sent after the shelter-in-place restrictions have been lifted and PG&E
staff have returned to their normal work locations.
senior dam safety
engineer, Ben Fontana, at (530) 762-
Jukkola, at (530) 624-
senior license coordinator, Jamie Visinoni, at (530) 215-6676.
Sincerely,
Teri Smyly
Manager, FERC Compliance
Enclosures: CUI//CEII DO NOT RELEASE
1. Grizzly Forebay Dam Phase 2 Investigation Plan (FERC Project No. 619) Response to
November 17, 2020 FERC Comments, Mead and Hunt, dated December 16, 2020
2. Phase 2 Investigation Work Plan, Grizzly Forebay Dam Condition Assessment, dated
December 16, 2020
Ќ͵ Grizzly Forebay Dam Condition Assessment, Temporary Construction Emergency Action
Plan, prepared by Alternative Structural Technologies Inc., dated December 16, 2020