HomeMy WebLinkAbout02.17.21 BOS Correspondence - FW_ Compliance Directives issued in FERC P-2105-000,et al.
From:Schuman, Amy
To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lucero, Debra;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas,
Amalia;Sweeney,
Kathleen;Teeter, Doug
Subject:BOS Correspondence - FW: Compliance Directives issued in FERC P-2105-000,et al.
Date:Wednesday, February 17, 2021 9:05:19 AM
Please see the email below from FERC.
Amy Schuman
Associate Clerk of the Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120
Twitter | Facebook | YouTube | Pinterest
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, February 17, 2021 5:25 AM
Subject: Compliance Directives issued in FERC P-2105-000,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 2/16/2021, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-2105-000
P-619-000
P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Compliance Directives
Delegated Order
Description: Letter order to Pacific Gas and Electric Company accepting the revised probable maximum flood for seven high hazard dams under the Bucks Creek Project et al under P-619
et al.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210216-
3093__;!!KNMwiTCp4spf!RoVx1w0xFhvkVgQxx6yUbVYz7bdJQA_fpydOk0mXYrY1K6NYSxaLHD9VmfBJcncfJoFu5D4yvEo$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!RoVx1w0xFhvkVgQxx6yUbVYz7bdJQA_fpydOk0mXYrY1K6NYSxaLHD9VmfBJcncfJoFu4P1ExOA$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!RoVx1w0xFhvkVgQxx6yUbVYz7bdJQA_fpydOk0mXYrY1K6NYSxaLHD9VmfBJcncfJoFumnVzSqc$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105-3084
(415) 369-3300 Office (415) 369-3322 Facsimile
February 16, 2020
In reply refer to:
Project Nos. 619-CA, 803-CA,
2105-CA
Mr. Jan Nimick, Vice President
Pacific Gas and Electric Company
Mail Code N11E
P.O. Box 770000
San Francisco, CA 94177-0001
Re: Revised Probable Maximum Flood for Bucks Creek, De Sabla-Centerville, and
Upper North Fork Feather River Projects
Dear Mr. Nimick:
This is in response to a letter dated September 14, 2017, from Mr. Neil Wong that
submitted the Probable Maximum Flood (PMF) Estimate Revisions dated September
2017 for seven high hazard dams under the Bucks Creek, De Sabla-Centerville, and
Upper North Fork Feather River Projects, FERC Nos. 619, 803 and 2105, respectively.
The dams included in the study are listed in the Enclosure. We have reviewed the
submittal and the results of the revised PMF study are acceptable. However, we have the
following comments:
1. With the exception of Lake Almanor Dam, six of the seven dams studied are
predicted to overtop for flows calculated from the revised PMF study (either by
the PMF stillwater reservoir level alone, or by the stillwater level with added
wind-generated setup and wave runup). However, your submittal does not discuss
any potential dam safety implications that would result from the overtopping at
these dams nor any proposed actions to address this issue. Evaluate the potential
impacts that overtopping would have on these dams and provide a plan and
schedule to mitigate against any adverse effects that the overtopping could have on
dam safety. You must develop a long-term plan and schedule for performing the
appropriate analyses, evaluating remedial options, prioritizing which projects to
address first, and enacting final remedial measures.
2
2. Since your submittals indicate the potential of flows overtopping your dams
during the PMF event, your plan and schedule requested above must include an
evaluation of the necessity of implementing interim risk reduction measures
(IRRMs). Any IRRMs deemed necessary should be in effect until such time the
overtopping concern is resolved.
Within 45 days of the date of this letter, please submit a plan and schedule to
address the comments. You may also setup a conference call with us to discuss our
comments before you submit a response. We appreciate your cooperation in this aspect
If you have any questions, please contact the
FERC engineers listed in the enclosure.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Enclosure
Projects and Dams Included in PMF Analysis Enclosure
Project
Project Name Dam Name Project Engineer
No.
Edgar Salire
619 Bucks Creek Bucks Lake
(415) 369-3369
619 Bucks Creek Lower Bucks Lake Edgar Salire
619 Bucks Creek Grizzly Forebay Edgar Salire
Christopher Wang
803 DeSabla-Centerville Philbrook Main
(415) 369-3366
Upper North Fork
2105 Lake Almanor Edgar Salire
Feather River
Upper North Fork
2105 Butt Valley Edgar Salire
Feather River
Upper North Fork
2105 Belden Forebay Edgar Salire
Feather River
1 of 1