Loading...
HomeMy WebLinkAbout02.18.21 BOS Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce; Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Kimmelshue, Tod; Lucero, Debra; Paulsen, Shaina; Pickett, Andy; Ring, Brian; Ritter, Tami; Rodas, Amalia; Sweeney, Kathleen; Teeter, Doug Subject:BOS Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Thursday, February 18, 2021 2:25:42 PM Please see the email below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 Twitter | Facebook | YouTube | Pinterest -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, February 18, 2021 2:25 PM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/18/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits Upstream Geomembrane Liner Project Final Construction Report for Bucks Creek Grizzly Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20210218-5152__;!!KNMwiTCp4spf!S9IiAvUUJdata308ER7eP0uxnIEPj_wb-GYAeOHPtpT1BvoIZwVafzou8pO- ikPlQZiYnphM4o8$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!S9IiAvUUJdata308ER7eP0uxnIEPj_wb- GYAeOHPtpT1BvoIZwVafzou8pO-ikPlQZiY1wkLoi0$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!S9IiAvUUJdata308ER7eP0uxnIEPj_wb- GYAeOHPtpT1BvoIZwVafzou8pO-ikPlQZiYPOOuJJg$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 February 18, 2021 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek-Grizzly Hydroelectric Project, FERC No. 619 Lower Bucks Dam (Bucks Diversion Dam) NATDAM #CA00331 Upstream Geomembrane Liner Project Final Construction Report ENCLOSURES CONTAIN CRITICAL ENERGY INFRASTRUCTURE INFORMATION (CUI//CEII) - DO NOT RELEASE Dear Mr. Blackett: This letter presents the final construction report, construction certification, and as-built drawings for the Upstream Geomembrane Liner Project (Project) at Lower Bucks Diversion Dam, which is part of or Licensee) Bucks Creek-Grizzly Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. In a letter to PG&E, dated July 14, 2020, FERC granted authorization for construction of Project. Installation of the geomembrane liner on theupstream face of the Lower Bucks Diversion Dam was completed on November 19, 2020. May 7, 2020 letter, enclosed with this letter please find the final construction report for the Project which includes as-built drawings and verified construction certifications from the Design Engineer, Quality Control Manager, and Licensee (Enclosure 1). During installation of the upstream liner, PG&E rehabilitated the low-level outlet stem and guides system with new components. In a letter from FERC dated October 20, 2020, FERC authorized the replacement and requesteda brief report summarizing the replacement effort upon completion. Enclosed with this letter please find the low-level outlet stem and guides replacement final construction report (Enclosure 2). Due to the ongoing shelter-in-place orders issued by the State of California in response to the COVID-19 pandemic, non-essential PG&E staff are currently working remotely, and hard copy filings are not possible at this time. If you require a hard copy of the letter Mr. Frank L. Blackett, P.E., Regional Engineer February 18, 2021 Page 2 and/or enclosures, please provide this request in your response and copies will be sent after the shelter-in-place restrictions have been lifted and PG&E staff have returned to their normal work locations. license coordinator, Jamie Visinoni, at (530) 215-6676. Sincerely, Teri Smyly Manager, FERC Compliance Enclosures: CUI//CEII DO NOT RELEASE 1. Final Construction Report (provided in 2 parts due to size) 2. Low-Level Outlet Stem and Guides Replacement Report cc: Mr. John Aedo, FERC-DHAC (John.Aedo@FERC.gov)