From:Schuman, Amy
To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lucero, Debra;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;
Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug
Subject:BOS Correspondence - FW: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
Date:Friday, February 26, 2021 12:10:08 PM
Good afternoon,
Please see the email correspondence below from FERC.
Amy Schuman
Associate Clerk of the Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, February 26, 2021 12:05 PM
Subject: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 2/26/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
No Organization Found (as Agent)
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Project Operations Compliance Report
Description: Pacific Gas and Electric Company Authorization Request for the Round Valley Reservoir Remote Monitoring Installation for the DeSabla-Centerville
Hydroelectric Projectunder P-803
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210226-
5315__;!!KNMwiTCp4spf!WG7u9N6R1a5yW51HXvHdOVnC26DgT7MdtUU4z1CPGAMZxNHUlvZvK-T0RgzQVMzhy7rcxOHEu0A$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!WG7u9N6R1a5yW51HXvHdOVnC26DgT7MdtUU4z1CPGAMZxNHUlvZvK-
T0RgzQVMzhy7rcxk8wGwU$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!WG7u9N6R1a5yW51HXvHdOVnC26DgT7MdtUU4z1CPGAMZxNHUlvZvK-
T0RgzQVMzhy7rcFjig3H8$
or for phone support, call 866-208-3676.
245 Market Street
tƚǞĻƩ DĻƓĻƩğƷźƚƓ
San Francisco, CA 94105
Mailing Address:
Mail Code N11D
P.O. Box 770000
San Francisco, CA 94177
February 26, 2021
Via Electronic Submittal (E-File)
Mr. Frank L. Blackett, P.E., Regional Engineer
San Francisco Regional Office
Federal Energy Regulatory Commission
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Round Valley Dam, NATDAM No. CA00346
Authorization Request Round Valley Reservoir Remote Monitoring
Installation
ENCLOSURES CONTAIN CUI//CEII DO NOT RELEASE
Dear Mr. Blackett:
This letter presents for
installation of remote monitoring equipment at Round Valley Reservoir, which is part of
PG&E DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory
Commission (FERC) No. 803. This work will address Recommendation 3 (R-3) from the
2020 Part 12D safety inspection report, which supersedes Recommendation 5 (R-5) from
the first Part 12D safety inspection report for Round Valley Dam.
For reference, R-3 is copied below:
R-3: It is recommended that remote reservoir level monitoring be added to the project.
This is a carry-over recommendation of Recommendation R05 from the 2015 Part 12D
Report.
installation of
reservoir monitoring equipment, please find a project description (Enclosure 1), approved
for construction drawings and stability calculations (Enclosure 2), and a quality control and
inspection program (Enclosure 3) enclosed with this letter for FERC review.
The proposed construction activities are scheduled to begin as soon as weather permits in
the spring/summer of 2021 and are estimated to take 4 weeks.
PG&E is
schedule, design details, and any questions or concerns that may need to be addressed
prior to FERC authorization to proceed with the work.
Mr. Frank L. Blackett, P.E., Regional Engineer
February 26, 2021
Page 2
As a result of the ongoing shelter-in-place orders issued by the State of California in
response to COVID-19 pandemic, nonessential PG&E staff are working remotely, and hard
copy filings are not possible at this time. If FERC requires a hard copy of the enclosed
documents, please contact the license coordinator identified below, and copies will be sent
after the shelter-in-place restrictions have been lifted and PG&E staff have returned to their
normal work locations.
dam safety engineer, Ms. Kaitlyn Thatcher, at (707) 342-7885. For general questions,
license coordinator, Ms. Jamie Visinoni, at (530) 215-6676.
Sincerely,
David Ritzman, PE, GE
Chief Dam Safety Engineer
Enclosures: CUI//CEII DO NOT RELEASE
1. Project Description Round Valley Reservoir Monitoring Installation, dated January 12,
2021
2. Approved for Construction Drawings and Stability Calculations, dated January 19, 2021
3. Quality Control and Inspection Program for Round Valley Remote Monitoring Installation,
dated January 26, 2021