Loading...
HomeMy WebLinkAbout02.26.21 BOS Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. From:Schuman, Amy To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lucero, Debra;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami; Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence - FW: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Friday, February 26, 2021 12:10:08 PM Good afternoon, Please see the email correspondence below from FERC. Amy Schuman Associate Clerk of the Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3308 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, February 26, 2021 12:05 PM Subject: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 2/26/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company Authorization Request for the Round Valley Reservoir Remote Monitoring Installation for the DeSabla-Centerville Hydroelectric Projectunder P-803 To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210226- 5315__;!!KNMwiTCp4spf!WG7u9N6R1a5yW51HXvHdOVnC26DgT7MdtUU4z1CPGAMZxNHUlvZvK-T0RgzQVMzhy7rcxOHEu0A$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!WG7u9N6R1a5yW51HXvHdOVnC26DgT7MdtUU4z1CPGAMZxNHUlvZvK- T0RgzQVMzhy7rcxk8wGwU$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!WG7u9N6R1a5yW51HXvHdOVnC26DgT7MdtUU4z1CPGAMZxNHUlvZvK- T0RgzQVMzhy7rcFjig3H8$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 February 26, 2021 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer San Francisco Regional Office Federal Energy Regulatory Commission 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Authorization Request Round Valley Reservoir Remote Monitoring Installation ENCLOSURES CONTAIN CUI//CEII DO NOT RELEASE Dear Mr. Blackett: This letter presents for installation of remote monitoring equipment at Round Valley Reservoir, which is part of PG&E DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. This work will address Recommendation 3 (R-3) from the 2020 Part 12D safety inspection report, which supersedes Recommendation 5 (R-5) from the first Part 12D safety inspection report for Round Valley Dam. For reference, R-3 is copied below: R-3: It is recommended that remote reservoir level monitoring be added to the project. This is a carry-over recommendation of Recommendation R05 from the 2015 Part 12D Report. installation of reservoir monitoring equipment, please find a project description (Enclosure 1), approved for construction drawings and stability calculations (Enclosure 2), and a quality control and inspection program (Enclosure 3) enclosed with this letter for FERC review. The proposed construction activities are scheduled to begin as soon as weather permits in the spring/summer of 2021 and are estimated to take 4 weeks. PG&E is schedule, design details, and any questions or concerns that may need to be addressed prior to FERC authorization to proceed with the work. Mr. Frank L. Blackett, P.E., Regional Engineer February 26, 2021 Page 2 As a result of the ongoing shelter-in-place orders issued by the State of California in response to COVID-19 pandemic, nonessential PG&E staff are working remotely, and hard copy filings are not possible at this time. If FERC requires a hard copy of the enclosed documents, please contact the license coordinator identified below, and copies will be sent after the shelter-in-place restrictions have been lifted and PG&E staff have returned to their normal work locations. dam safety engineer, Ms. Kaitlyn Thatcher, at (707) 342-7885. For general questions, license coordinator, Ms. Jamie Visinoni, at (530) 215-6676. Sincerely, David Ritzman, PE, GE Chief Dam Safety Engineer Enclosures: CUI//CEII DO NOT RELEASE 1. Project Description Round Valley Reservoir Monitoring Installation, dated January 12, 2021 2. Approved for Construction Drawings and Stability Calculations, dated January 19, 2021 3. Quality Control and Inspection Program for Round Valley Remote Monitoring Installation, dated January 26, 2021