Loading...
HomeMy WebLinkAbout03.01.21 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. From:Clerk of the Board To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lucero, Debra;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Monday, March 1, 2021 3:35:28 PM Good afternoon, Please see the email correspondence below from FERC. Shaina Paulsen Administrative Assistant, Senior Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 O: 530.552.3300 |D: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, March 1, 2021 3:25 PM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 3/1/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company Delegation of Authority regarding Section 7 and Section 106 of the Haskins Valley Boat Ramp Replacement Project for the Bucks Creek-Grizzly Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210301- 5389__;!!KNMwiTCp4spf!VZrRre8dnujFWNC5vFbCG1VoNV1r56x5jo2pcWCY-qI7UD55fky7V_hnm4jUMwU6-htQSEVjKi4$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!VZrRre8dnujFWNC5vFbCG1VoNV1r56x5jo2pcWCY- qI7UD55fky7V_hnm4jUMwU6-htQGtlVtRc$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!VZrRre8dnujFWNC5vFbCG1VoNV1r56x5jo2pcWCY- qI7UD55fky7V_hnm4jUMwU6-htQxq0JzPk$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 March 1, 2021 San Francisco, CA 94177 Via Electronic Submittal E-File Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 Subject: Bucks Creek-Grizzly Hydroelectric Project, FERC No. 619 Delegation of Authority regarding Section 7 and Section 106 Haskins Valley Boat Ramp Replacement Project Dear Secretary Bose: Pacific Gas and Electric Company (PG&E) plans to replace the Haskins Valley Boat Ramp located in Haskins Bay, at the Southern end of Bucks Lake, which is Creek-Grizzly Hydroelectric Project, Federal Energy Regulatory Commission (FERC) Project No. 619. The scope of this undertaking will require authorization from FERC. The proposed project includes replacement of the deteriorated boat ramp and construction of new pavement on the access road, turnaround and parking areas. Rock slope protection will be added along the road and the boat ramp. The Haskins Valley Boat Ramp Replacement is scheduled to begin in September 2021. To perform the necessary construction, consultation will be required with the State Historic Preservation Officer (SHPO) and United States Fish and Wildlife Service (FWS). Following early project coordination, the U.S. Army Corps of Engineers designated FERC as the lead Federal agency to act on their behalf (Enclosure 1). PG&E requests that FERC, as the lead federal agency for undertakings related to this project pursuant to 36 CFR 800.2(c)(4), delegate authority to PG&E to initiate consultation as described in Section 106 of the National Historic Preservation Act with the California State Historic Preservation Officer. Also pursuant to 50 CFR section 402.08, PG&E requests FERC designate PG&E as its non-federal representative for informal consultation under Section 7 of the Endangered Species Act. PG&E staff is available to discuss this request in more detail, if needed. If you have any questions, please calicense coordinator, Jamie Visinoni, at (530) 215-6676. Sincerely, Teri Smyly Manager, FERC Compliance Enclosure ENCLOSURE 1 DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA 95814-2922 February 22, 2021 Regulatory Division (SPK-2021-00139) Federal Energy Regulatory Commission Attn: Kimberly D. Bose 888 First Street, NE Washington, D.C. 20426 Dear Ms. Bose: This letter concerns our designation of lead federal agency for the proposed Haskins Valley Boat Ramp Replacement project. The project site is located on and near Bucks Lake, Latitude 39.8704°, Longitude -121.1811°, Plumas County, California. Following early coordination with your non-federal representative, Pacific Gas and Electric Company (PG&E), on February 8, 2021, we hereby designate the Federal Energy Regulatory Commission (FERC) as the lead Federal agency to act on our behalf for purposes of compliance with Section 7 of the Endangered Species Act (ESA) and Section 106 of the National Historic Preservation Act (NHPA) for the Department of the Army authorization required for the Haskins Valley Boat Ramp Replacement project. Prior to initiating consultation with the appropriate agency, PG&E should coordinate their draft determinations for ESA and NHPA, as well as the information used in making those determinations with our office. Additionally, PG&E should include a statement in their consultation letters indicating that we have designated the FERC as the lead federal agency for the proposed action, along with a copy of this letter. When consultations are complete, PG&E should provide this office with the resource agencies’ responses. Although PG&E will act as the FERC’s non-federal representative, the FERC remains ultimately responsible for all findings and determinations pursuant to Section 7 of the ESA and Section 106 of the NHPA. Please refer to identification number SPK-2021-00139 in any correspondence concerning this project. If you have any questions, please contact me at our Sacramento Regulatory Office, 1325 J Street, Suite 1350, Sacramento, California 95814-2922, by email at Zachary.J.Fancher@usace.army.mil, or telephone at (916) 557-6643. Sincerely, Zachary Fancher Senior Project Manager Special Projects Branch (CONT) -2- Regulatory Division (SPK-2021-00139) SUBJECT: Haskins Valley Boat Ramp Replacement project cc: Mr. Jesus Viscara, Pacific Gas & Electric Company, JRV8@pge.com Mr. Michael Fris, U.S. Fish and Wildlife Service, SFWO_mail@fws.gov Ms. Julianne Polanco, California Office of Historic Preservation, calshpo.ohp@parks.ca.gov