HomeMy WebLinkAboutCSA180 Bi Annual Pump Inspection 2020 •Durham pump&Irrigation
WM.P.WILSON&SONS Invoice
CL#271327 Number: 0194902-IN
Main Office: Woodland Branch:
Durham Pump,Inc. Wm.P.Wilson&Sons Date: 12/21/2020
2313 Durham-Dayton Hwy,Durham,CA 95938 202 Kentucky Ave,Woodland,CA 95695
530.891.4821 530-891.0613 Fax 530.662.8654 530.662.5797 Fax Page: 1
Order I Date: 0055162 12/18/2020
Please Remit All Payments to: Durham Pump,PO Box 60,Durham,CA 95938 Thank you! Customer#: 01-0005315
Salesperson: JOHN RHEIN
Sold To: BUTTE COUNTY FIRE DEPT-MAIN Ship To: CSA#180-HAWK RANCH
7 COUNTY CENTER DR HAWK CT.
ATTN: MARGE CHICO,CA 95973
OROVILLE,CA 95965
Confirm To: JOHN GADDIE Job Name: CSA#180 Hawk Ranch
Customer P.O. Ship VIA: F.O.B. Terms: NET 10TH
Item Code Description Unit WH Qty Ordered I Shipped I B.O. Price Amount
12/07/2020 COMPLETE BI-ANNUAL SERVICE AND MAINTENANCE CHECKS.REPORTS ENCLOSED.
/PMAINT PUMP SERVICE CONTRACT LABOR 0.00 200.00
Taxable Amount: 0.00
Non-Taxable Amount: 200.00
Net Invoice: 200.00
N/A Less Discount: 0.00
Signature Sales Tax: 0.00
Invoice Total: 200.00
Less Deposit: 0.00
Invoice Balance: 200.00
Durham : Pump PUMP CHECK REPORT
2313 Durham-Dayton Hwy.
Durham, CA 95938 530.891.4821 CSA#180 - Hawk Ranch
CUSTOMER NAME: Butte County Fire Dept. DATE: 12/7/2020
Motor Mfg: HP: 1/2 Meter#:
RPM Volts 240 Phase Rated Amps:
TM 80 Yes No Serial#
PG &E Acct. # Other:
Panel Mfg: 2 WIRE SUB NEMA Size:
Type:nX/L P/W Other:
Pump Mfg: Serial#:
Non-Running Checks: Pump Model Manufacturer
na Lubricant Levels - Service and Change if Necessary Discharge
na Oiler Unit and/or Packing
[ ]Electrical Leads & Connections - Repair and Tighten as Necessary
[]Incoming Idle Voltage: W/I Acceptable Limits Unacceptable
Fuses- Replace if Necessary Replaced Size:
Perform General Clean-Up of Electrical Panel and Motor
Running Checks: Motor winding resistance: O's to ground
[]Excessive or Unusual Noise Ok/see comments Pressure tank:
[]Excessive or Unusual Vibration Ok/see comments Tank condition:
[]Control Devices: H.O.A. - Start Switch Time Clock
Frost Start Time Delay Other:
Amperage: Expected: 8.2 Pressure setting: 40-60 psi
Actual: Li: 7.7 7 8 L3: 0 Average: 7.85
Overload Underload Even Load
Bowl Adjustment: N/A Yes No
Comments:
GPS:
The above readings reflect the site and pump conditions at the time of inspection.
This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system.
S:1Pump Dept. Files\PUMP TESTS&INSPECTIONS\Cal Fire CSA's1180 Hawk Ranch1180 Reports
Durham'.Durhamb Pump PUMP CHECK REPORT
2313 Durham-Dayton Hwy.
Durham, CA 95938 530.891.4821 CSA#180 - Hawk Ranch
CUSTOMER NAME: Butte County Fire Dept. DATE: 12/7/2020
Motor Mfg: Franklin HP: 20 Meter#: 22P816
RPM 3450 Volts 460 Phase 3 Rated Amps:
TM 80 Yes No Serial#
PG &E Acct. # Other:
Panel Mfg: C/H NEMA Size: 3
Type: X/L P/W Other:
Pump Mfg: ?Sub Serial#:
Non-Running Checks: Pump Model Manufacturer
na Lubricant Levels -Service and Change if Necessary Discharge 8" Fab
na Oiler Unit and/or Packing
Electrical Leads & Connections - Repair and Tighten as Necessary
Incoming Idle Voltage: W/I Acceptable Limits Unacceptable
Fuses - Replace if Necessary Replaced Size:
Perform General Clean-Up of Electrical Panel and Motor
Running Checks: Motor winding resistance: 0's to ground
Excessive or Unusual Noise Ok/see comments Pressure tank: okay
Excessive or Unusual Vibration Ok/see comments Tank condition:
Control Devices: H.O.A. (Start Switch Time Clock
Frost Start nTime Delay Other:
Amperage: Expected: Pressure setting:
Actual: L1: 62 1 L2: 64 2 L3: 63.1 Average: 63.13
Overload Underload ❑✓ Even Load
Bowl Adjustment: N/A Yes No
Comments:
GPS:
The above readings reflect the site and pump conditions at the time of inspection.
This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system.
S:\Pump Dept. Files\PUMP TESTS&INSPECTIONS\Cal Fire CSA's1180 Hawk Ranch1180 Reports