Loading...
HomeMy WebLinkAbout03.29.21 BOS Correspondence_ FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. From:Clerk of the Board To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lucero, Debra;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:BOS Correspondence: FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Monday, March 29, 2021 8:48:02 AM Please see additional Board Correspondence below from FERC. Shaina Paulsen Administrative Assistant, Senior Butte County Administration 25 County Center Drive, Suite 200 Oroville, CA 95969 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, March 29, 2021 8:15 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 3/29/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits plans and schedules to address recommendations from the 11th 5-year Part 12D safety inspection report for Grizzly Forebay Dam, part of Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210329- 5056__;!!KNMwiTCp4spf!QQ295397UFfyahkI_HsXpIBcm3fdiKB3GYue7c4s8eRAmilsIyufo3pn3qdvdDWRQIwFJxVwsFw$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!QQ295397UFfyahkI_HsXpIBcm3fdiKB3GYue7c4s8eRAmilsIyufo3pn3qdvdDWRQIwFaOxCRo4$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!QQ295397UFfyahkI_HsXpIBcm3fdiKB3GYue7c4s8eRAmilsIyufo3pn3qdvdDWRQIwFjZ33WFI$ or for phone support, call 866-208-3676. Power Generation 245 Market Street San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 March 26, 2021 Via Electronic Submittal (E-file) Mr. Frank L. Blackett P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Grizzly Forebay Dam, NATDAM No. CA00333 11th Part 12D Inspection, Plan and Schedule ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Mr. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) plans and schedulesto address recommendations from the 11th 5-year Part 12D safety inspection report for Grizzly Forebay Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. PG&E submitted the safety inspection report, prepared by independent consultants (ICs) Mr. William Rettberg, P.E., and Mr. Chad M. Masching, P.E., and dated January 2021, to FERC on January 29, 2021. PG&E’s proposed plans and schedules to address the ICs’ recommendations are enclosed with this letter (Enclosure 1). Ongoing shelter-in-place orders issued by the State of California in response to the COVID-19 pandemic require that nonessential PG&E staff work remotely, and hard copy filings are not practical at this time. If FERC requires hard copies of this letter and/or enclosures, please contact the license coordinator identified below. If necessary, hard copies will be sent after the shelter-in-place restrictions have been lifted and PG&E staff have returned to their normal work locations. Should you have any technical questions concerning this matter, please contact PG&E’s senior dam safety engineer, Mr. Ben Fontana, at (530) 762-9459. For general questions, please contact PG&E’s senior license coordinator, Ms. Jamie Visinoni, at (530) 215-6676. Mr. Frank L. Blackett, P.E., Regional Engineer March 26, 2021 Page 2 Sincerely, David L. Ritzman, P.E., G.E. Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Plans and Schedules