Loading...
HomeMy WebLinkAbout04.01.21 Board Correspondence_ FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. From:Clerk of the Board To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lucero, Debra;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:Board Correspondence: FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Thursday, April 1, 2021 8:10:49 AM Good Morning, Please see Board Correspondence from FERC below. Thanks Shaina Paulsen Administrative Assistant, Senior Butte County Administration 25 County Center Drive, Suite 200 Oroville, CA 95969 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, March 31, 2021 9:05 AM Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 3/31/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company Dam Safety Surveillance and Monitoring Plan / Report Submittal for 2020 Record Year for DeSabla-Centerville Hydroelectric Project under P-803 To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210331- 5116__;!!KNMwiTCp4spf!WkhNQmZZcLQ2EJFQnKooyCJF0E35PcPKqlM9Qth22jM5cfkhsgsJGOEn7XdY1179gcv8unszeXM$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!WkhNQmZZcLQ2EJFQnKooyCJF0E35PcPKqlM9Qth22jM5cfkhsgsJGOEn7XdY1179gcv86v9GGCU$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!WkhNQmZZcLQ2EJFQnKooyCJF0E35PcPKqlM9Qth22jM5cfkhsgsJGOEn7XdY1179gcv88bAbS8k$ or for phone support, call 866-208-3676. Enclosure 3 DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Completed Comments and Recommendations Dam NameDam No.Item Description 2020 Part 12D Recommendation R-2 - update VIC to include reference to roots on downstream left groin PhilbrookCA00345 2020 Part 12D Recommendation R-3 - update Figure A-10 and Table 7-1 to indicate sensing zone of TW-87(1) PhilbrookCA00345 2020 Part 12D Recommendation R-4 - update TW-87(1) action level in Table 7-4 PhilbrookCA00345 Comment 1 from FERC's review letter, dated February 9, 2018 PhilbrookCA00345 Comment 1 from FERC's review letter, dated January 14, 2021 Round ValleyCA00346 Comment 2 from FERC's review letter, dated January 14, 2021 Round ValleyCA00346 Comment 3 from FERC's review letter, dated January 14, 2021 Round ValleyCA00346 2020 Part 12D Recommendation R-4 - Update DSSMP/R with flow outlet drain Round ValleyCA00346 2020 Part 12D Recommendation R-5 - add Area of Special Monitoring for area of observed seepage Round ValleyCA00346 2020 Part 12D Recommendation R-6 - update Weir BW-45 threshold and action levels Round ValleyCA00346 2020 Part 12D Recommendation R-7 - replace Figure A-9 with Drawing 364028 Round ValleyCA00346 2020 Part 12D Recommendation R-11 - give each outlet drain an ID number Round ValleyCA00346 2015 Part 12D Recommendation R-9 - update Weir BW-45 threshold and action levels Round ValleyCA00346 245 Market Street Power Generation San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 March 30, 2021 Via Electronic Submittal (E-File) Mr. Frank Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA DSSMP/R Submittal for 2020 Record Year ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Mr. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) submittal of thecombined dam safety surveillance and monitoring plans and reports (DSSMP/Rs) (Enclosure 1) for the 2020 record year for the DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. The reports covered under this submittal include the following dams: DeSabla Forebay Dam, NATDAM No. CA00343 Philbrook Dam, NATDAM No. CA00345 Round Valley Dam, NATDAM No. CA00346 In accordance with FERC’s request, this submittal is accompanied by statements from PG&E’s Chief Dam Safety Engineer (CDSE) regarding the safety of PG&E’s dams for continued operation (Enclosure 2). A table listing the comments and/or recommendations PG&E considers complete with submittal of these DSSMP/Rs is included in Enclosure 3. PG&E typically begins preparing DSSMP/Rs 9 months before they are due to FERC. To maintain PG&E’s schedule for coordinating and compiling the DSSMP/Rs and allow FERC’s comments to be incorporated in future reports, PG&E’s must receive timely feedback. To facilitate completion of PG&E’s DSSMP/Rs for the 2020 record year, PG&E respectfully requests that FERC return all comments on the 2020 DSSMP/Rs by September 30, 2021. Ongoing shelter-in-place orders issued by the State of California in response to the COVID-19 pandemic require that nonessential PG&E staff work remotely, and hard copy Mr. Frank Blackett, P.E. Regional Engineer March 30, 2021 Page 2 filings are not practical at this time. Hard copies will be sent after the shelter-in-place restrictions have been lifted and PG&E staff have returned to their normal work locations. Should you have any technical questions concerning the information presented in these reports, please contact PG&E’s dam safety engineer, Ms. Kaitlyn Thatcher, at (707) 342- 7885. For general questions, please contact PG&E’s license coordinator, Ms. Jamie Visinoni, at (530) 215-6676. Sincerely, (Elisabeth Rossi for Teri Smyly) Teri Smyly Manager, FERC Compliance 1. Enclosures: 2. DSSMP/Rs (3) CUI//CEII – DO NOT RELEASE 3. Annual CDSE Statement Letters (3) CUI//CEII –DO NOT RELEASE 4. Completed Comments and Recommendations