Loading...
HomeMy WebLinkAbout04.01.21 Board Correspondence_ FW_ General Correspondence issued in FERC P-803-000 From:Clerk of the Board To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;Lucero, Debra; Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;Teeter, Doug Subject:Board Correspondence: FW: General Correspondence issued in FERC P-803-000 Date:Thursday, April 1, 2021 8:09:55 AM Good Morning, Please see Board Correspondence from FERC below. Thanks Shaina Paulsen Administrative Assistant, Senior Butte County Administration 25 County Center Drive, Suite 200 Oroville, CA 95969 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, March 30, 2021 3:35 PM Subject: General Correspondence issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 3/30/2021, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: General Correspondence Description: Letter to Pacific Gas and Electric Company providing comments on the undermining discovered on 12/09/2020 beneath the Toadtown Canal, part of the DeSabla-Centerville Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20210330-3060__;!!KNMwiTCp4spf!T5mfN9udEB4erQfA_DPaq4Hi- orbstxoh1bBYVBDzhB6DbobDEdixoannLC5fkJztVann9HaLCg$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!T5mfN9udEB4erQfA_DPaq4Hi- orbstxoh1bBYVBDzhB6DbobDEdixoannLC5fkJztVan2_g0Mfo$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!T5mfN9udEB4erQfA_DPaq4Hi- orbstxoh1bBYVBDzhB6DbobDEdixoannLC5fkJztVanECANDhA$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 Office (415) 369-3322 Facsimile March 30, 2021 In reply refer to: Project No. 803-CA Mr. Jan Nimick, Vice President Pacific Gas and Electric Company Mail Code: N11E PO Box 770000 San Francisco, CA 94177-0001 Re: 18 CFR 12.10(a) Incident Report Regarding Toadtown Canal Undermining Dear Mr. Nimick: This is in response to a letter dated February 12, 2021 from Mr. David Ritzman that submitted information regarding the undermining discovered on December 9, 2020 beneath the Toadtown Canal, which is part of the DeSabla-Centerville Project, FERC No. 803. The submittal for this incident satisfies the intent of the incident reporting requirements under 18 CFR 12.10(a). However, please note that while we have temporarily suspended the requirement to notarize verification forms for such incidents due to the ongoing COVID-19 pandemic, verification forms signed by the licensee are still required. Therefore, please include signed verification forms along with future 12.10(a) and 12.10(b) submittals. We appreciate your continued efforts dam safety program. If you have questions, please contact Mr. Michael Vail at (415) 369-3346. Sincerely, Frank L. Blackett, P.E. Regional Engineer 2 cc: Ms. Sharon Tapia, Chief CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001