HomeMy WebLinkAbout04.14.21 Board Correspondence - FW_ Supplemental_Additional Information submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
From:Clerk of the Board
To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Kimmelshue, Tod;
Lucero, Debra;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;Sweeney, Kathleen;
Teeter, Doug
Subject:Board Correspondence - FW: Supplemental/Additional Information submitted in FERC P-619-000 by Pacific Gas
and Electric Company,et al.
Date:Thursday, April 15, 2021 10:37:34 AM
Good Morning,
Please see Board Correspondence below from FERC
Shaina Paulsen
Administrative Assistant, Senior
Butte County Administration
25 County Center Drive, Suite 200
Oroville, CA 95969
T: 530.552.3304 | F: 530.538.7120
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, April 15, 2021 9:36 AM
Subject: Supplemental/Additional Information submitted in FERC P-619-000 by Pacific Gas and Electric
Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 4/15/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC),
Washington D.C.:
Filer: Pacific Gas and Electric Company
No Organization Found (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Supplemental/Additional Information
Description: Pacific Gas and Electric Company submits Response to FERC Comments on the 2017 Focused
Spillway Assessment for the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210415-
5130__;!!KNMwiTCp4spf!V_f-
pP_gB4XkP5B0Y4Q6Ny3lh0lfnyCYCOsEDoU_IUM_dvDHi1vDi7APEpRdsutKKDkCR_qbdg0$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!V_f-
pP_gB4XkP5B0Y4Q6Ny3lh0lfnyCYCOsEDoU_IUM_dvDHi1vDi7APEpRdsutKKDkC52hhl2E$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!V_f-
pP_gB4XkP5B0Y4Q6Ny3lh0lfnyCYCOsEDoU_IUM_dvDHi1vDi7APEpRdsutKKDkCGL94WD4$
or for phone support, call 866-208-3676.
245 Market Street
Power Generation
San Francisco, CA 94105
Mailing Address:
Mail Code N11D
P.O. Box 770000
San Francisco, CA 94177
April15, 2021
Via Electronic Submittal (E-File)
Mr. Frank Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Diversion Dam, NATDAM No. CA00331
Response to FERC Comments on the 2017 Focused Spillway Assessment
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Mr. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) responses to Federal
Energy Regulatory Commission (FERC) comments regarding a 2017 focused
engineering assessment of the spillway at Bucks Diversion Dam, which is part of
PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. PG&E submitted a copy of
the spillway assessment report to your office on January 2, 2018, and received FERC’s
comments on the report in a letter dated March 2, 2021. PG&E’s responses to the
comments areenclosed with this letter for FERC review (Enclosure 1).
Ongoing shelter-in-place orders issued by the State of California in response to the
COVID-19 pandemic require that nonessential PG&E staff work remotely, and hard
copy filings are not practical at this time. If FERC requires hard copies of this letter
and/or enclosures, please contact the license coordinator identified below. Ifnecessary,
hard copies will be sent after the shelter-in-place restrictions have been lifted and PG&E
staff have returned to their normal work locations.
Should you have any technical questions concerning this matter, please contact
PG&E’s senior dam safety engineer, Mr. Ben Fontana, at (530) 762-9459. For general
questions, please contact PG&E’s senior license coordinator, Ms. Jamie Visinoni, at
(530) 215-6676.
Mr. Frank Blackett, P.E. Regional Engineer
April 15, 2021
Page 2
Sincerely,
David L. Ritzman, P.E., G.E.
Chief Dam Safety Engineer
Enclosure: CUI//CEII –DO NOT RELEASE
1. PG&E’s Responses to Comments from FERC’s March 2, 2021, Letter
cc: w/Enclosures
Ms. Sharon Tapia, Chief
Department of Water Resources
Division of Safety of Dams
P.O. Box 942836
Sacramento, CA 94236-000