Loading...
HomeMy WebLinkAboutTPM20-0001 Agenda Report  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 1 of 17  BUTTE COUNTY ZONING ADMINISTRATOR AGENDA REPORT – April 14, 2021 Applicant: Troy Keenan Location: The project site has the situs of 2990 Nord Avenue, Chico and is located on the west side of Nord Avenue, approximately 3,000 feet North and West of Chico city limits via Nord Avenue. Owners: Troy Keenan File #: TPM20-0001 Request: Tentative Parcel Map to divide a 5.0-acre property into four parcels (1.0 acres each) with designated remainder. Supervisor District: 2 Parcel Size: 5.0 acres Planner: Tiffany Lightle Associate Planner G.P.: VLDR (Very Low Density Residential) Attachments Zoning: VLDR (1.0 acre minimum) A: Zoning Administrator Decision with attached Conditions of Approval Zone Date: December 10, 2012 B: Vicinity Map and Zoning Map APN: 042-020-098 C: Tentative Parcel Map RECOMMENDED ACTTION: Staff recommends the Zoning Administrator adopts an exemption pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15061 (b) (3) Common Sense Exemption, and approve Tentative Parcel Map TPM20-0001, subject to findings and conditions in Attachment A. EXECUTIVE SUMMARY The project proposes to divide a 5.0-acre parcel, in the VLDR (Very Low Density Residential – 1.0-acre minimum) zone and VLDR (Very Low Density Residential) General Plan designation, into four lots (1.0 acres each) and one designated remainder. The project parcel is developed with a primary residence, accessory residence, garage, ground-mount solar array and shed totaling approximately 2,503 square feet, these structures are to be present on the designated remainder of this map. The project parcel fronts on Nord Avenue, a publicly maintained paved road, and lots 2, 3 and 4 will front along Cattle Court Drive, a privately maintained access easement. The parcel frontage is  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 2 of 17  currently unimproved without curb, gutter, and sidewalk. Future residences will be served by onsite well and septic systems. PROJECT DESCRIPTION: Direction General Plan Designation Zoning Existing Land Use(s) North Very Low Density Residential VLDR Residential South Very Low Density Residential VLDR Residential East Very Low Density Residential VLDR Residential West Very Low Density Residential VLDR Residential The project proposes to divide a 5.0-acre parcel, in the VLDR (Very Low Density Residential – 1.0 acre minimum) zone and VLDR (Very Low Density Residential) General Plan designation, into four lots (1.0 acres each) with one designated remainder lot. The project parcel fronts on Nord Avenue, a publicly maintained paved road and frontage is unimproved without curb, gutter, and sidewalk. The parcel is located near the City of Chico incorporated area, and within the City of Chico sphere of influence within an area designated SPA-4 (Bell Muir Special Planning Area). The project site (and SPA-4) will eventually be located within Chico’s jurisdiction upon future annexation, with the City becoming responsible for the provision of public services, maintaining/upgrading infrastructure, and overseeing future urban development in the area. Future residences will be served by onsite well and septic systems. Within the foreseeable future the property will be annexed into the city. The city reviewed the project and the Engineering Department requested improvements be built to City of Chico Standards. The City’s requirements are included in the conditions of approval. SITE CHARACTERISTICS: The project parcel contains a primary residence, garage, ground-mount solar array and shed totaling approximately 2,503 square feet. Topography of the project area is flat, an elevation of approximately 172 feet above sea level. Site vegetation consists primarily of tall grasses, brush and forbs. There are no waterways on or adjacent to the project site. According to Federal Emergency Management Agency (FEMA) floodplain mapping of the project area, the parcel is located within the X (unshaded) Flood Zone. The areas of minimal flood hazard, which are the areas outside the Special Flood Hazard Area (SFHA) and higher than the elevation of the 0.2-percent-annual-chance flood, are labeled Zone C or Zone X (unshaded). (https://www.fema.gov/flood-zones). Nord Avenue borders the parcel to the west with residential uses on all sides and is not within an airport compatibility zone.  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 3 of 17  ANALYSIS: Zoning Consistency Butte County Code section 24-18 F. (Very Low Density Residential- 1 Acre) The Very Low Density Residential zoning designation allows for single-family homes and related uses in residential neighborhoods within the county. Permitted residential uses in the VLDR zone include single-family homes, small residential care homes, second units and accessory dwelling units, animal grazing, on-site agricultural product sales, and private stables. The VLDR zone also conditionally permits non-residential uses compatible with a residential setting, including public and quasi-public uses, golf courses, park and recreational facilities, personal services, animal- keeping, large residential care homes, and medical offices and clinics. The minimum permitted parcel size in the VLDR zone is one (1) acre. The proposed project includes one (4) 1-acre parcel and one (1) 1.0- acre designated remainder parcel, which are consistent with the minimum parcel size criteria of the VLDR zone. Butte County Code section 24-56.1 (Residential Setbacks for Orchards and Vineyards) The proposed project includes a minimum 25-foot residential setback from one-acre residential orchards located adjacent to lots 2, 3 and 4 of the project site, established pursuant to Section 24- 56.1 of the Butte County Zoning Ordinance. The northerly parcel is part of a proposed tentative subdivision map and all orchard land has been removed to accommodate future development. In consultation with the Agricultural Commissioner, a 25-foot residential setback along the northerly and easterly lines proposed on the tentative map is adequate. Implementation of the residential setbacks and implementation of existing Butte County policies and regulations identified above ensures protection of the adjacent residential orchards. Consistency of Project with General Plan Goals and Policy:  Policy LU-P4.1 - The integrity and stability of existing residential neighborhoods shall be promoted and preserved. The project area consists of single-family residential within the Very Low Density (VLDR) zone and residentially zoned parcels with residences. Surrounding parcels range in size from 1.0 acres up to 20.0 acres.  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 4 of 17  General Plan 2030 Goals and Policies Consistency Review WATER RESOURCE ELEMENT GOAL W-2. Ensure an abundant and sustainable water supply to support all uses in Butte County. Consistent. This goal is more specifically reviewed in the discussion of the policies below. W-P2.8. The County supports Area of Origin water rights, the existing water right priority system and the authority to make water management decisions locally to meet the county's current and future needs, thereby protecting Butte County's communities, economy and environment. Consistent. Future land uses will utilize established vested rights to underlying groundwater resources to meet water needs. W-P2.9. Applicants for new major development projects, as determined by the Department of Development Services, shall demonstrate adequate water supply to meet the needs of the project, including an evaluation of potential cumulative impacts to surrounding groundwater users and the environment.* Consistent. The availability of water resources to serve future development on the project site would be evaluated by Butte County Environmental Health upon application for a development permit. GOAL W-3. Effectively manage groundwater resources to ensure a long- term water supply for Butte County. Consistent. This goal is more specifically reviewed in the discussion of the policies below. W-P3.3. The County shall protect groundwater recharge and groundwater quality when considering new development projects.* Consistent. Future development would result in only a minor increase in impervious surfaces from the construction of concrete foundations and driveways. Thus, the proposed project would not cause a measureable reduction in surface infiltration or a decrease in deep percolation to the underlying aquifers. At the time of development, proposed improvements will be evaluated by the Butte County Public Works Department to ensure that stormwater runoff is appropriately retained on-site to allow for groundwater recharge and improved water quality. GOAL W-4. Promote water conservation as an important part of a long-term and sustainable water supply. Consistent. This goal is more specifically reviewed in the discussion of the policies below. W-P4.6. New development projects shall adopt best management practices for water use efficiency and demonstrate specific water conservation measures.* Consistent. Future development would be subject to California Green Building Standards Code and other California regulations, which contains specific measures for water conservation of residential and non- residential buildings. GOAL W-5. Protect water quality through effective stormwater management. Consistent. This goal is more specifically reviewed in the discussion of the policies below.  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 5 of 17  General Plan 2030 Goals and Policies Consistency Review W-P5.2. New development projects shall identify and adequately mitigate their water quality impacts from stormwater runoff.* Consistent. At the time of development, proposed improvements will be evaluated by the Butte County Public Works Department to ensure that stormwater runoff is appropriately retained on-site to allow for groundwater recharge and improved water quality. CONSERVATION AND OPEN SPACE ELEMENT GOAL COS-2. Promote green building, planning and business. Consistent. This goal is more specifically reviewed in the discussion of the policies below. COS-P2.2. New development shall comply with Green Building Standards adopted by the California Building Standards Commission at the time of building permit application, including requirements about low- or no- toxicity building materials. Consistent. Cal Green development measures will be applied in the design of future development, at the time of the building permit application. GOAL COS-7. Conserve and enhance habitat for protected species and sensitive biological communities. Consistent. This goal is more specifically reviewed in the discussion of the policies below. COS-P7.3. Creeks shall be maintained in their natural state whenever possible, and creeks and floodways shall be allowed to function as natural flood protection features during storms.* Consistent. The project site does not contain any creek or floodways. COS-P7.4. New development projects shall mitigate their impacts in habitat areas for protected species through on- or off-site habitat restoration, clustering of development, and/or project design and through the provisions of the Butte Regional Habitat Conservation Plan (HCP) and Natural Community Conservation Plan (NCCP) within the HCP/NCCP Planning Area, upon the future adoption of the HCP/NCCP.* Consistent. No native habitat was identified on the project site or surrounding area. The property had been extensively disturbed by previous grading. COS-P7.5. No new development projects shall occur in wetlands or within significant riparian habitats, except within the Butte Regional Habitat Conservation Plan (HCP) and Natural Community Conservation Plan (NCCP) Planning Area where such development is consistent with the conditions of the HCP/NCCP, upon the future adoption of the HCP/NCCP.* Consistent. No riparian habitat was identified on the project site or surrounding area. The property had been extensively disturbed by previous grading activity. COS-P7.6. New development projects shall include setbacks and buffers along riparian corridors and adjacent to habitat for protected species, except where permitted in the Butte Regional Habitat Conservation Plan (HCP) and Natural Community Conservation Plan (NCCP) Planning Area and where such development is consistent with the conditions Consistent. No native habitat was identified on the project site or surrounding area. The property had been extensively disturbed by previous grading activity.  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 6 of 17  General Plan 2030 Goals and Policies Consistency Review of the HCP/NCCP, upon the future adoption of the HCP/NCCP.* COS-P7.8. Where sensitive on-site biological resources have been identified, construction employees operating equipment or engaged in any development-associated activities involving vegetation removal or ground disturbing activities in sensitive resource areas shall be trained by a qualified biologist and/or botanist who will provide information on the on-site biological resources (sensitive natural communities, special-status plan and wildlife habitats, nests of special-status birds, etc.), avoidance of invasive plan introduction and spread, and the penalties for not complying with biological mitigation requirements and other State and federal regulations.* Consistent. No native habitat was identified on the project site or surrounding area. The property had been extensively disturbed by previous grading activity. GOAL COS-9. Protect identified special- status plant and animal species. Consistent. This goal is more specifically reviewed in the discussion of the policies below. COS-P9.1. A biological resources assessment shall be required for any proposed development project where special- status species or critical habitat may be present. Assessments shall be carried out under the direction of Butte County. Additional focused surveys shall be conducted during the appropriate season if necessary. Upon adoption of the Butte Regional Habitat Conservation Plan (HCP) and Natural Community Conservation Plan (NCCP), assessment requirements of the HCP/NCCP shall be implemented for development projects within the HCP/NCCP area.* Consistent. No native habitat was identified on the project site or surrounding area. The property had been extensively disturbed by previous grading activity. GOAL COS-17. Maintain and enhance the quality of Butte County's scenic and visual resources. Consistent. This goal is more specifically reviewed in the discussion of the policies below. COS-P17.1. Views of Butte County's scenic resources, including water features, unique geologic features and wildlife habitat areas, shall be maintained.* Consistent. No scenic resources were identified within the project area that would be adversely impacted by the proposed project, including any substantial water features, unique geological features, or wildlife habitat areas. LAND USE ELEMENT GOAL LU-4 Provide high-quality housing in a range of residential densities and types. Consistent. This goal is more specifically reviewed in the discussion of the policies below.  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 7 of 17  General Plan 2030 Goals and Policies Consistency Review LU-P4.1 - The integrity and stability of existing residential neighborhoods shall be promoted and preserved. Consistent. The project area consists of single-family residential and related uses within the Very Low Density Residential (VLDCR) zone and residentially zoned parcels with residences. Surrounding parcels range in size from 1.0 acres up to 20.0 acres. HEALTH AND SAFETY ELEMENT GOAL HS-1. Maintain an acceptable noise environment in all areas of the county. Consistent. This goal is more specifically reviewed in the discussion of the policies below. HS-P1.1. New development projects proposed in areas that exceed the land use compatibility standards in Tables HS-2 and HS-3 shall require mitigation of noise impacts.* Consistent. No substantial transportation or non-transportation noise sources have been identified in the project area. HS-P1.2. Noise from transportation sources shall not exceed land use compatibility standards in Table HS-2.* Consistent. No substantial transportation or non-transportation noise sources have been identified in the project area. HS-P1.9. The following standard construction noise control measures shall be required at construction sites in order to minimize construction noise impacts: (a.) Equip all internal combustion engine driven equipment with intake and exhaust mufflers that are in good condition and appropriate for the equipment. (b.) Locate stationary noise- generating equipment as far as possible from sensitive receptors when sensitive receptors adjoin or are near a construction project area. (c.) Utilize quiet air compressors and other stationary noise-generating equipment where appropriate technology exists and is feasible.* Consistent. Noise generated by construction activities associated with the project are temporary, intermittent and separated from noise sensitive receptors. Noise control measures are standard in the construction industry and are commonly used to minimize noise impacts to surrounding uses. Additionally, construction activities would be consistent with the County's Noise Control Ordinance. GOAL HS-3. Prevent and reduce flooding. Consistent. This goal is more specifically reviewed in the discussion of the policies below. HS-P3.2. Applicants for new development projects shall provide plans detailing existing drainage conditions and specifying how runoff will be detained or retained on-site and/or conveyed to the nearest drainage facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility.* Consistent. Future development permits are reviewed by the County Public Works Department, and may require drainage and stormwater detention plans as a condition of permit approval. HS-P3.3. All development projects shall include stormwater control measures and site design features that prevent any increase in the peak flow runoff to existing drainage facilities.*  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 8 of 17  General Plan 2030 Goals and Policies Consistency Review GOAL HS-11. Reduce risks from wildland and urban fire. Consistent. This goal is more specifically reviewed in the discussion of the policies below. HS-P11.1. Fire hazards shall be considered in all land use and zoning decisions, environmental review, subdivisions review and the provision of public services. Consistent. The project is not located in a Fire Hazard Severity Zone or a State Responsibility Area, and therefore, would not be exposed to a significant wildland fire risk. HS-P11.4. New development projects shall meet current fire safe ordinance standards for adequate emergency water flow, emergency vehicle access, signage, evacuation routes, fuel management, defensible space, fire safe building construction and wildfire preparedness. Consistent. The project meets current fire safe standards. Permits for new development would be reviewed by County Fire and Building Departments to ensure that projects have adequate water storage, access, defensible space, building construction, and other fire protection standards. GOAL PUB-13. Plan adequate wastewater infrastructure to serve new development. Consistent. This goal is more specifically reviewed in the discussion of the policies below. PUB-P13.3. New development projects shall demonstrate the availability of a safe, sanitary and environmentally sound wastewater system. Consistent. Permits for new development projects are reviewed by the Butte County Division of Environmental Health to ensure the availability of safe, sanitary and environmentally sound wastewater system is provided. Wastewater systems are reviewed in compliance with Chapter 19 of Butte County Code (On-Site Wastewater Systems). PUB-P13.2. For development projects that will rely on on-site wastewater systems, applicants shall provide detailed plans demonstrating that the system will be adequate to serve the project. BUTTE COUNTY DEPARTMENTS AND OTHER AGENCIES REVIEW Comments/conditions received from Butte County Departments and other Agencies were reviewed and incorporated into the project analysis and proposed project conditions. The Butte County Assessor’s Office provided clearance for this approval and Butte County Environmental Health provided approval for proposed on-site sewage disposal systems and domestic wells. Butte County and City of Chico Public Works and Butte County Cal-Fire comments were provided and included in Exhibit A below.  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 9 of 17  EXEMPTION FROM CEQA In compliance with CEQA Guidelines Section 15061 (b) (3) Common Sense Exemption, this project is exempt from CEQA review. The Common Sense Exemption dictates that where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. Staff finds upon review of the California Natural Diversity Database the site falls within any identified range or area of sensitive species or habitats. The parent parcel is not within a deer herd migration overlay, scenic resource, scenic highway overlay, nor is it located within Agricultural Land. The site has been previously developed and does not contain any cultural resources, nor is it near or adjacent to a creek or waterway, it does not contain oak woodlands, has been previously developed, is relatively flat (sloping two feet across the entire parent parcel). The parent parcel is within the City of Chico Sphere of Influence and within the foreseeable future will be located within the City’s jurisdiction. Urban services and infrastructure shall be constructed to City of Chico standards. The parent parcel is not located within the Watershed Protection Overlay zone, nor is it near any identified fault lines, there is a very low risk of landslide and erosion hazard potential. The parent parcel is located in FEMA flood zone “X” or undefined/unshaded/not applicable, considered to be an area with minimal flooding risk, and is not expected to have an impact on future development. Environmental Health has determined adequate space for both the existing and proposed well and septic systems. The Designated Remainder and Parcel 1 will be accessed through Nord Avenue with improvement standards to meet City of Chico standards. Parcels 2, 3, and 4 will be accessed by the existing private road “Cattle Drive Court”. Parcels 3 and 4 will share a Non-Exclusive Easement for ingress and egress and public services purposes for the benefit of Parcel 4. The parent parcel is currently served with utilities. The parcel has not been involved in a previous division from a larger parcel within the last two (2) years and the parcel does not have an average slope greater than 20 percent. Staff therefore finds with certainty that there is no possibility that the activity in question may have a significant effect on the environment, and not subject to CEQA.  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 10 of 17  ATTACHMENT A: DRAFT ZONING ADMINISTRATOR DETERMINATION WITH CONDITIONS OF APPROVAL BUTTE COUNTY ZONING ADMINISTRATOR DECISION ZDN20-XXXX TENTATIVE PARCEL MAP TPM20-0001 (Troy Keenan) A tentative parcel map to divide a 5.0-acre parcel, in the VLDR (Very Low Density Residential – 1.0-acre minimum) zone and VLDR (Very Low Density Residential) General Plan designation, into four lots (1.0 acres each) and one designated remainder. The project parcel contains a primary residence, accessory residence, garage, ground-mount solar array and shed. The project parcel fronts Nord Avenue, a publicly maintained paved road. The parcel frontage is unimproved without curb, gutter, and sidewalk. Future residences will be served by onsite well and septic systems. APN 042-020-098 April 7, 2021 I. The Zoning Administrator has considered Section 15061 (b) (3) Common Sense Exemption in accordance with the California Environmental Quality Act (CEQA), and adopts the Exemption with the following findings: A. Section 15061 (b) (3) applies to projects which can be seen with certainty that there is no possibility that the activity may have significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. B. On the basis of the whole record before the Zoning Administrator, there is no substantial evidence that the Tentative Parcel Map for Troy Keenan, Planning Division File No. TPM20-0001 would have a significant effect on the environment. C. The custodian of the record is the Department of Public Works. The location of the record is 7 County Center Drive, Oroville CA 95965. II. Approves Tentative Parcel Map TPM20-0001 for Troy Keenan, subject to the conditions found in Exhibit “A” and the following findings: A. The proposed map is consistent with the VLDR (Very Low Density Residential, 1.0- acre minimum) zone. Proposed lots meet minimum parcels sizes and will support single-family residential development, consistent with purpose and allowed uses in the VLDR zone (BCC §24- 18E and §24-19). B. The project is substantially consistent with applicable Goals and Policies of the Butte County General Plan based on the consistency review in the staff report. In addition,  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 11 of 17  there is no substantial evidence in the whole record to support any of the findings in Government Code Section 66474 requiring denial of the tentative parcel map. C. The design and improvements of the proposed parcel map are consistent with County standards and policies provided all conditions of project approval are met. Comments/conditions received from Butte County Departments and other Agencies were reviewed and incorporated into the project analysis and proposed project conditions. Design and improvements of the Proposed Parcel Map are consistent with County standards and policies. Conditions to meet City of Chico standards shall be placed as a condition for all future infrastructure and utilities. D. The project site is physically suitable for the use and density of the proposed development. The proposed parcel sizes are consistent with the minimum parcel size requirement of the VLDR (1.0-acre minimum) zone. Existing and proposed single-family residences are consistent with the primary allowed land uses in the VLDR zone. E. The design and improvements of the project will not conflict with easements acquired by the public at large for access through or use of property within the proposed parcel map provided the attached conditions are met. No easements will be abandoned with the proposed TPM. F. The project site is not located within an earthquake fault zone. As noted in the initial study for the project, there is only one known active fault within Butte County and it is located approximately 20 miles to the east. G. Approval of this project will not be detrimental to the public health, safety, and welfare provided the required conditions and mitigation measures are complied with. No adverse or detrimental effects to the environment or public health, safety, and welfare have been identified as resulting from the project, from agency and departmental review, or from staff analysis. H. The roads in the project area have the capacity to handle the increase in vehicular traffic generated by the project. The addition of four residential dwellings would have a negligible effect on local or regional traffic. Approved By: Pete Calarco Date: April 7, 2021  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 12 of 17  EXHIBIT A Tentative Parcel Map for Troy Keenan on APN 042-020-098, File # TPM20-0001: A request to divide a 5.0-acre parcel, in the VLDR (Very Low Density Residential – 1.0-acre minimum) zone and VLDR (Very Low Density Residential) General Plan designation, into four lots (1.0 acres each) and one designated remainder. The project parcel contains a primary residence, accessory residence, garage, ground-mount solar array and shed. The project parcel fronts Nord Avenue, a publicly maintained paved road. The parcel frontage is unimproved without curb, gutter, and sidewalk. Future residences will be served by onsite well and septic systems. I. Conditions of Approval: Planning Division None. Public Works A. STREETS 1. Prior to recordation of the parcel map, provide a fully executed road maintenance agreement for all non-publicly maintained access roads on the county approved form. A note shall be placed on a separate document which is to be recorded concurrently with the map or on an additional map sheet of the parcel map stating: "In accordance with Civil Code Section 845, maintenance of the road as shown hereon shall be shared by those properties with a legal interest in it." 2. Prior to recordation of the parcel map, demonstrate to the Department of Public Works that there is approved access conforming to county code to each parcel from a publicly maintained road. 3. Prior to recordation of the parcel map, deed to Butte County in fee simple 32 feet of right-of- way from the physical centerline of Nord Avenue along the entire property frontage. 4. Prior to recordation of the parcel map, relinquish abutter's rights of access to Butte County along the Nord Avenue frontage of parcel 1 except at approved access points. 5. Prior to final road inspection, install all necessary traffic safety signs including stop signs. 6. Prior to recordation of the parcel map, obtain an encroachment permit and improve all new and existing driveway approaches to publicly maintained roads as specified in the county improvement standards and the terms of the encroachment permit. 7. Provide a cul-de-sac or building free turn around area designed and constructed as specified in the county improvement standards. The parcel map shall show the cul-de-sac or building free turn around area.  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 13 of 17  8. Prior to recordation of the parcel map, construct or provide a performance, labor and material bond for construction of street frontage improvements on Nord Avenue. Construct a ½+ 12’ street section along the entire parcel frontage in conformance with City of Chico improvement standard S-18A, including curb, gutter, and detached sidewalk, 3″ Type A Hot Mix Asphalt, 12″ Class 2 aggregate base, prime coat, fog seal and 95 % relative compaction. Submit for approval roadway structural design and improvement plans to the Land Development Division prior to construction. An “R” value determination and other data may be required to support the section design. Submit a “Notice of Materials to be Used”, materials test results, and mix design in compliance with 2018 Caltrans Standard Specifications, Section 39, to the department of Public Works for approval at least 14 days prior to the start of paving operations. Testing of hot mix asphalt materials shall be performed by a qualified laboratory and test results shall be signed and stamped by a licensed civil engineer. Conduct material testing during construction and submit the results to Department of Public Works to ensure compliance with Standard Specifications, approved materials, and approved mix design. 9. Prior to recordation of the parcel map, provide approved access to each parcel being created. Construct or provide a performance, labor and material bond for construction of interior road in conformance with county improvement standard RS-7, 2″ Type A Hot Mix Asphalt, 8″ Class 2 aggregate base, prime coat, fog seal and 95 % relative compaction. Submit for approval roadway structural design and improvement plans to the Land Development Division prior to construction. An “R” value determination and other data may be required to support the section design. Submit a “Notice of Materials to be Used”, materials test results, and mix design in compliance with 2018 Caltrans Standard Specifications, Section 39, to the department of Public Works for approval at least 14 days prior to the start of paving operations. Testing of hot mix asphalt materials shall be performed by a qualified laboratory and test results shall be signed and stamped by a licensed civil engineer. Conduct material testing during construction and submit the results to Department of Public Works to ensure compliance with Standard Specifications, approved materials, and approved mix design. B. DRAINAGE 10. 1. Prior to the recordation of the parcel map an engineered plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how stormwater runoff will be attenuated on site by detention facilities and/or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide developed-condition peak flow discharge not greater than the pre- development condition for all storm events, and no increase in stormwater volume over the design storm duration to said channel or facility. Detention facilities must either discharge to receiving channel with no backwater from the channel, or attenuate full stormwater volume onsite. Backwater condition is present when detention facility, with gravity flow, has an outlet elevation at or below the approved 100 year water surface elevation of the receiving channel. If used, stormwater pumps shall have redundant pump systems, back-up power, and discharge control mechanism(s) to prevent discharge during high flow events in receiving channel. If leach trenches are designed to retain stormwater runoff from a 100 year storm  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 14 of 17  event, the soil saturated hydraulic conductivity (Ksat) shall be used as the soil percolation rate. Prior to final improvement inspection, the design dimensions and volume of detention facilities shall be confirmed using topographic land survey by the engineer of record. 11. Prior to final improvement inspection by the Department of Public Works, all new drain inlets shall be labeled with the county approved drain marker per county standard S-40. Improvement plans shall show and/or note the requirements for labeling inlets pursuant to county standard S-40. 12. Prior to recordation of the parcel map, pay drainage impact fees per Article XI, Chapter 3 of Butte County Code. C. SMALL MUNICIPAL STORM SEWER SYSTEMS (MS4) REQUIREMENTS 13. Construction Phase: Prior to issuing a grading or a building permit, or prior to approval of improvement plans, submit an erosion and sediment control plan (ESCP) to Public Works department for approval. ESCP shall contain site-specific construction site Best Management Practices (BMPs). BMPs included in the ESCP must be in accordance with Section 50-19 of County Code, and/or consistent with the California Stormwater Quality Association BMPs. Revisions to an approved ESCP must be resubmitted for Department of Public Works approval prior to commencing with site work. A Storm Water Pollution Prevention Plan (SWPPP) developed pursuant to the construction stormwater general permit (CGP) may be submitted in lieu of the ESCP. Add a note on a map sheet that states: “Development activities resulting in soil disturbance shall submit an erosion and sediment control plan (ESCP) to the Department of Public Works for approval. ESCP shall contain appropriate site-specific construction site BMPs.” 14. Construction Phase: Coverage under the stormwater Construction General Permit (CGP) will be required by the State Water Resources Control Board if development activities result in ground disturbance, including clearing, excavation, filling, and grading of one or more acres or disturb less than one acre but are part of a larger common plan or development. Coverage under this General Permit must be obtained from the State Water Resources Control Board prior to starting construction. If coverage under the CGP is required, engineering plans shall show the Waste Discharge Identification (WDID) number on the title sheet of the plans and a copy of Storm Water Pollution Prevention Plan (SWPPP) shall be provided to the Land Development Division of the Public Works Department. Submit with improvement or grading plans the estimated areas to be disturbed to the Department of Public Works for consistency with the SWPPP. Additionally, place a note on a map sheet that states: “The development of this parcel (or subdivision) map required coverage under the Stormwater Construction General Permit. Construction activities that result in a land disturbance of less than one acre, but which are part of a larger common plan of development, also require coverage under this permit. Development of individual lots may require an additional permit coverage.”  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 15 of 17  15. Post Construction: Implement post-construction Best Management Practices (BMPs) consistent with State Water Resources Control Board Order 2013-0001-DWQ to control the volume, rate, and potential pollutant load of stormwater runoff, including, but not limited to, requirements to minimize the generation, transport and discharge of pollutants. Develop and submit a Post Construction Stormwater Management Plan (PCSMP) that identifies BMP stormwater treatment system(s) designed to reduce or eliminate stormwater pollutant discharges through the construction, operation and maintenance of source control measures, low impact development design, site design measures, stormwater treatment system(s) and/or hydromodification measures. Design and sizing requirements shall comply with the Post- Construction Stormwater Management Program (section E.12) requirements of State Water Resources Control Board Order 2013-0001-DWQ. Hydromodification measures are required for Regulated Projects that create and/or replace one acre or more of impervious surface. The Department of Public Works approval of the PCSMP is precedent to improvement plan approval. Regulated projects are defined in State Water Resources Control Board Order 2013-0001-DWQ and are generally considered as new and redevelopment projects on public or private land that fall under the planning and permitting authority of the and are within the MS4 area that create or replace greater than or equal to 5,000 square feet of impervious area, excluding: a) detached single family residences that are not part of a common plan of development; b) interior remodels; c) routine maintenance or repair; or d) a Linear Underground/Overhead Utility Projects unless the project has a discrete location of that has 5,000 square feet or more of newly constructed contiguous impervious area. 16. Post Construction: Prior to improvement plan approval, Regulated Projects shall submit a Stormwater Facilities Operations and Maintenance (O&M) Plan that identifies the operations, maintenance, and inspection requirements of all stormwater Best Management Practices (BMPs) treatment system(s) and hydromodification measures identified in the approved PCSMP. All public and private stormwater treatment system(s) and hydromodification measures shall be protected, inspected, and maintained to ensure continuous and fully effective performance as designed. A maintenance and inspection schedule for both dry and wet season BMPs shall be in writing, and a record shall be kept that includes the dates of inspection or maintenance, whether BMPs were inspected or maintained, a description of any maintenance activity, and the name of the inspector or maintenance foreman. Place a note on a map sheet to state: “The owners or operators of facilities required to implement post-construction BMPs shall enter into a written maintenance agreement with the County or other formal maintenance entity such as a County Service Area, Home Owners Association for maintenance of such features. Regulated Projects shall grant site access to Butte County or other formal maintenance entity for the sole purpose of implementing and performing measures in the O&M plan for the installed stormwater treatment system(s) and hydromodification measures.” 17. Post Construction: Stormwater Trash Treatment Control Devices BMPs: Prior to final improvement inspection, Install stormwater trash treatment control devices (Devices). Devices installed shall meet Full Capture System requirements and shall be designed in accordance with the following criteria:  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 16 of 17  i. Appropriately sized to treat not less than the peak flowrate resulting from a 1- year, 1-hour storm event (design storm) or at least the same peak flows from the corresponding storm drain; ii. Do not bypass trash below the design storm under maximum operational loading conditions; and iii. Trap all particles that are 5 mm or greater up to the design flow or at least the same peak flows from the corresponding storm drain; and do not have a diversion structure present upstream such that a portion of the peak flow is not treated to trap all particles 5 mm or greater. Location(s) and specifications of Devices selected shall be shown on improvement plans. Devices shall be certified by the State Water Resources Control Board prior to installation. Prior to installation of any certified Devices, the local mosquito vector control district should be contacted to ensure the installation conforms to the District’s visual inspection, treatment, and vector breeding minimizing guidelines. Devices shall be protected, inspected, and maintained to ensure continuous and fully effective performance as designed. Place a note on a map sheet to state: “The owners or operators of facilities required to install trash treatment control devices shall enter into a written maintenance agreement with the County or other formal maintenance entity such as a County Service Area, Home Owners Association for maintenance of such devices.” When leach trenches are used to retain 100% of stormwater runoff on- site, trash treatment control devices are not required. D. PARCEL MAP 18. Show all easements of record on the parcel map. 19. Prior to recordation of the parcel map, pay in full any and all delinquent, current and estimated taxes and assessments as specified in Article 8 of Chapter 4 of Division 2 of Title 7, of the California Government Code commencing with Section 66492. 20. Pay the recording fees in effect at the time the parcel map and related documents are recorded. Public Health Department Environmental Health Division None.  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 17 of 17  Cal Fire/Butte County Fire 21. Construction, installation, or development of buildings and/or roads, driveways, gates and bridges on parcels/lots shall comply with current adopted California Fire Code and current Butte County Improvement Standards, whichever is stricter. 22. Pressurized water for fire protection is available within 1,000 feet of the created parcels. In lieu of bearing the cost of installing a fire hydrant(s), the developer may pay into the fire department hydrant fund. The amount paid is based on the length of the street frontage of the created parcels. The amount paid is established at $1.72 per frontage foot. 23. Prior to building construction, provide an all-weather access of at least 10 feet wide for residential, and 20 feet wide for commercial, and vertical clearance of 15 feet that will allow for ingress and egress and accommodate a 40,000-pound fire apparatus to within 150 feet of all structures. 24. All roadways shall meet current maximum length of cul-de-sac standard. Processing Fees 25. Prior to recordation of the Parcel Map, pay any outstanding project-related processing fees. II. NOTATION A. Minor changes may be approved administratively by the Directors of Development Services, Environmental Health, or Public Works upon receipt of a substantiated written request by the applicant, or their respective designee. Prior to such approval, verification shall be made by each Department or Division that the modification is consistent with the application, fees paid and environmental determination as conditionally approved. Changes deemed to be major or significant in nature shall require a formal application for amendment.  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 18 of 17  ATTACHMENT B: VICINITY MAP  Butte County Department of Development Services   April 14, 2021  Agenda Report – Troy Keenan TPM20-0001  Page 19 of 17  ATTACHEMENT C: TENTATIVE PARCEL MAP