HomeMy WebLinkAbout06.03.21 Shasta Temperature Plan and Drought Plan
From:Gosselin, Paul
To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Hironimus, Patrizia;
Kimmelshue, Tod;Lucero, Debra;Paulsen, Shaina;Pickett, Andy;Ring, Brian;Ritter, Tami;Rodas, Amalia;
Sweeney, Kathleen;Teeter, Doug
Cc:Buck, Christina;Jessee, Meegan
Subject:Shasta Temperature Plan and Drought Plan
Date:Thursday, June 3, 2021 3:59:57 PM
Attachments:2021 Sacramento River Temperature Management Plan_May_28_complete.docx.pdf
Board members
During the discussion of drought impacts, a number of questions were raised about the impetus for
the water transfer and management programs of the water districts served by the Central Valley
Project. Thad Bettner, GCID, provided me with the Shasta Temperature Plan and Drought Plan
(attached) and a link to the State Water Project Endangered Species Protection Program.
https://water.ca.gov/Programs/State-Water-Project/Endangered-Species-Protection
I am providing this as background information on current regional drought activity.
If you have any questions please let me know.
Thank you.
Paul
Paul Gosselin, Director
Department of Water and Resource Conservation
308 Nelson Ave
Oroville, CA 95965
530-552-3590 office
530-574-7443 mobile
United States Department of the Interior
BUREAU OF RECLAMATION
Central Valley Operations
3310 El Camino Ave #300
Sacramento, California 95821
CVO-400
2.2.4.21
VIA ELECTRONIC MAIL
Mr. Erik Ekdahl
Deputy Director, Division of Water Rights
State Water Resources Control Board
th
1001 I Street, 14 Floor, Office 54
Sacramento, CA 95814
Subject: Transmittal of 2021 Sacramento River Temperature Management Plan - Order 90-5
Dear Mr. Ekdahl:
This letter transmits the Bureau of ReclamationÓs Sacramento River Temperature Management Plan
(Plan) for Water Year 2021 (Enclosure A) pursuant to Order 90-5. Factors beyond the reasonable
control of Reclamation prevent Reclamation from meeting 56°F at the Red Bluff Diversion Dam.
The Plan will best protect the fishery by conserving cold water for later release and is necessary to
implement measures to conserve winter-run Chinook salmon.
While Reclamation ended the 2020 water year with a Shasta storage of 2.2 million acre-feet, the 2nd
highest storage for Dry hydrologic year types since the implementation of D-1641, CVPIA, and ESA
requirements, water Year 2021 is currently the driest on record since 1977. The snowpack on the
Sacramento River Basin at the start of April was 69 percent of average, but with very little rainfall.
Conditions also significantly changed at the end of April when forecasted reservoir inflow from
snowmelt did not materialize. This year, allocations to agricultural water service and repayment
contracts are 0% and allocations to municipal and industrial contractors are only 25%. Storage in
Trinity, Oroville, and Folsom reservoirs are low, and Reclamation is operating to water rights, Delta
standards, and health and safety deliveries while seeking to facilitate water transfers to provide
supplies to areas of the state in dire need.
Reclamation has been coordinating weekly with the State and Federal agencies through the Water
Operations Management Team (WOMT) called for in the 2020 Record of Decision for the Long-
Term Operation (LTO) of the Central Valley Project (CVP) and State Water Project (SWP). Starting
in January, Reclamation provided and discussed 12-month operation outlooks in topic specific
meetings with State Water Resources Control Board (Water Board) staff. The March forecasts
identified the potential for a Tier 3 or a Tier 4 year under the LTO. Accordingly, Meet and Confer
provisions with the Sacramento River Settlement Contractors (SRSC) were initiated. In the course of
these discussions, a warm water bypass of power generation at Shasta Reservoir was discussed,
coordinated through the SRTTG, and implemented, preserving over 300 TAF of cold water for later
in the year. In March, Reclamation convened the Sacramento River Temperature Task Group
(SRTTG) to consult with the California Department of Fish and Wildlife (CDFW), the U.S. Fish and
Wildlife Service, the National Marine Fisheries Service (NMFS), and the U.S. Western Area Power
Administration. These meetings also included the SRSC, Water Board, and Tribes.
Reclamation also participated in the Water BoardÓs April 21 workshop on 2021 Sacramento River
Temperature Management and provided the Water Board a Draft Sacramento River Temperature
Management Plan (Draft Plan) on May 4.
st
We received written comments on the Draft Plan from the Water Board on May 21 and respond to
the input as follows:
End-of-September carryover storage target of 1.25 MAF: Given the unique circumstances
this year, the GovernorÓs Drought Proclamation, and anticipated actions by the Water Board
to curtail non-project diversions, the enclosed Plan shows an end-of-September storage in
Shasta Reservoir of 1.25 MAF.
Provisions for weekly coordination, reporting of anticipated changes and modeling and
monitoring to inform decisions: Reclamation agrees with these provisions and has
incorporated these commitments in the Temperature Management Plan.
We received written comments on the Draft Plan from NMFS on May 14, and respond to the input as
follows:
: Targeted lower
Continue to consider life history diversity for shaping the temperature season
temperatures (approximately 54.5°F) for the critical egg incubation period with 57°F
shoulder temperatures. The recommended criteria of 53.7F for egg incubation was considered
in earlier scenario development but would likely expend cold water pool prior to the end of
August.
Continue to preserve redds downstream to the Highway 44 Bridge: Reclamation will target
the SAC gage located at the Highway 44 Bridge.
Continue to use real-time management to respond to actual meteorological conditions:
Reclamation will continue to anticipate warm meteorological conditions and take actions in
advance to reduce the likelihood of exceed target temperatures.
Represent the effect of power bypass operations: Reclamation incorporated the reservoir
profile as of May 19 that includes cold water remaining following the majority of the power
bypass. The power bypass concluded on May 24.
Model an additional scenario with the driest hydrology and hottest meteorology on record to
reflect a conservative forecast of conditions: Reclamation has requested this scenario be
developed by the NMFS Southwest Fisheries Science Center and provided to SRTTG.
Include a section committed to uncertainty and assumptions including those related to
hydrology, meteorology, snowpack, accretions, and depletions: Reclamation has included
this suggestion under the section titled ÐKey Areas of Uncertainty.Ñ
We received written comments on the Draft Plan from the SRSC on May 19 and respond to the input
as follows:
e
Balanced Release Schedule from Keswick: Reclamation has developed a release schedul
less than suggested in June, July, and August in an effort to address comments from the
Water Board suggesting an end of September carryover storage target of 1.25 MAF. This
schedule is only feasible given the voluntary actions taken by the SRSC to reduce demands
from the Sacramento River. If Delta water quality objectives require additional releases, and
additional releases from other reservoirs would place other objectives at risk, Reclamation
would need to discuss at WOMT and revisit the carryover target with the Water Board.
Storage in Shasta Reservoir is the result of inflows less releases. Shasta Reservoir supports
downstream diversions and Delta requirements in coordination with other CVP and SWP facilities
and in response to non-project diverters. Reclamation coordinated with the SRSC on the voluntary
actions for the lowest possible releases from Shasta Reservoir while meeting other system
requirements. Actions include voluntary demand reductions, groundwater substitution, water
transfers, and intense coordination to match releases to demand. These releases also account for
system-wide drought actions such as modifying delta outflow and water quality requirements
described in the Temporary Urgency Change Petition filed by Reclamation and the California
Department of Water Resources (DWR), watershed-wide curtailments, increased releases from New
Melones reservoir to meet delta objectives, reduced CVP and SWP allocations and other water
management actions that decrease reliance on stored water throughout the summer. If requirements
administered by the State of California, including those overseen by the Water Board, call for more
water than anticipated, and other CVP and SWP reservoirs cannot be impacted, Reclamation will
protect Health and Safety and storage in Shasta Reservoir may be less than estimated. Reclamation
commits to weekly discussions on operational conditions for major CVP and SWP facilities,
including Shasta Reservoir, during WOMT and commits to notifying the Water Board in writing in
the event that the 1.25 MAF end-of-September storage is no longer feasible.
DWR is coordinating with Reclamation to update the Drought Continency Plan required in the 2020
Incidental Take Permit for the State Water Project. The Drought Contingency Plan describes the
system-wide operational conditions, approach, monitoring, and coordination that fall beyond the
scope of Order 90-5. The Drought Contingency Plan supplements sections of this Temperature
Management Plan and will be available by June 1, 2021.
While approval is not required under Order 90-5, if the Water Board objects to the enclosed Plan, the
Water BoardÓs objection must include identification of an alternative location for managing water
temperatures to 56°F. In the absence of the Water Board providing an alternative location,
Reclamation will implement this Plan until such time as alternative location can be provided or
agreed upon.
For additional information, please contact me or Ms. Elizabeth Kiteck, Chief, Water Operations at
(916) 979-2684 or ekiteck@usbr.gov.
Sincerely,
Kristin White
Operations Manager
Enclosures
May 28, 2021
SACRAMENTO RIVER TEMPERATURE MANAGEMENT PLAN FOR
WATER YEAR 2021
INTRODUCTION
Conditions in the Central Valley are critically dry, and consequently, Shasta temperature management is
limited by these dry conditions. Although temperature management in Water Year 2020 (a dry year) resulted
in low temperature dependent mortality (3-7%) for brood year (BY) 2019 Sacramento River winter-run
Chinook salmon, the overall survival was low. Although Water Year 2021 started with higher storage than
previous critical years in recent history, hydrologic conditions supporting Shasta temperature management
are critically low. The Northern Sierra Precipitation 8-Station Index indicates that this year’s hydrologic
conditions are the driest since 1977. In early April, Shasta Reservoir’s cold water pool used to protect
winter-run Chinook salmon was projected to be the smallest since 1977.
Unfortunately, conditions have deteriorated significantly from the April 1st forecast and expected inflow to
the Sacramento River system (including the Yuba. Feather and American River watersheds) has decreased
by approximately 685 TAF. On May 10, 2021, the Governor issued an Emergency Proclamation on drought
conditions for the Sacramento –San Joaquin Bay-Delta (Delta) and other watersheds because of the
continuing extreme dry conditions in the Delta watersheds. As such, numerous drought actions were rapidly
planned and/or finalized to lessen the impact of the drought on fish and wildlife, water supply, public health
and safety and carryover storage for next year. A report outlining these actions and the expected response
from the Sacramento-San Joaquin system as a whole will be available by June 1, 2021. This temperature
management plan includes many assumptions of drought actions in order to reach the forecasted Shasta and
Keswick monthly releases; however, these actions are not fully explained in this report as they are system-
wide actions rather than specific temperature management actions.
This Water Year 2021 Sacramento River Temperature Management Plan (Plan) reflects coordination
starting in February 2021 to manage operations of Shasta Reservoir for water temperatures on the
Sacramento River using conservative assumptions in modeling, taking advantage of opportunities to
increase the cold water pool, and managing to real-time conditions. The Plan describes how the U.S.
Bureau of Reclamation (Reclamation) plans to operate Shasta Reservoir and the Temperature Control
Device (TCD) on Shasta Dam consistent with the 2020 Record of Decision on the Coordinated Long-Term
Operation of the Central Valley Project and State Water Project (LTO) (2020 ROD) in compliance with:
RPM 1.a. of the 2019 National Marine Fisheries Service (NMFS) Biological Opinion to, in
coordination with the Sacramento River Temperature Task Group (SRTTG), consider technical
assistance from NMFS regarding the development of an annual temperature management plan and
to submit a final temperature management plan to NMFS by May 20 of each year;
Order 90-5 to consult with the California Department of Fish and Wildlife (CDFW), U.S. Fish
and Wildlife Service (USFWS), NMFS, and Western Area Power Administration on the
designation of a location upstream of the Red Bluff Diversion Dam where Reclamation will meet
a daily average water temperature of 56°F; and
Order 90-5 to provide an operation plan to the State Water Resources Control Board (Water
Board), Chief of the Division of Water Rights, on Reclamation’s strategy to meet the temperature
requirement at a location upstream of the Red Bluff Diversion Dam.
The Plan was developed in coordination with and with input from the SRTTG. It includes temperature
1
May 28, 2021
locations and targets through October 31, modeled winter-run Chinook salmon egg mortality, estimated
dates for operation of the side gates on the TCD, and the estimated end-of-September cold water pool.
Throughout Plan implementation, Reclamation will monitor the cold water pool, compare measured
conditions to actual performance, and provide regular updates through the SRTTG. In the event measured
cold water pool conditions vary from what is projected and temperature performance appears at risk,
Reclamation will reconvene the SRTTG in preparation for an adjustment of this Plan. If the adjustment
impacts the temperature Tier and/or other warranted indicators as discussed by the SRTTG, then a
modified summer temperature release strategy will be evaluated to remain within the Tier’s anticipated
performance level. Reclamation will work with NMFS and the other members of the SRTTG during fall
operations to conserve storage and address the potential for redd dewatering.
Based on the February 90% exceedance forecast, Reclamation identified that Water Year 2021 was likely to
be a Tier 4 year and initiated interagency coordination activities regarding Shasta reservoir seasonal
management. In a Tier 4 year, there is less than 2.5 MAF of total storage in Shasta Reservoir at the
beginning of May, and/or Reclamation cannot meet 56°F at CCR. Conditions on May 1 along with modeling
based on measured reservoir profiles confirm that Water Year 2021 is a Tier 4 temperature management
season.
BACKGROUND
The 2020 ROD requires use of conservative forecasts through the seasonal planning process for reservoir
releases (including developing initial and updated allocations) and temperature management planning, such
that monthly release forecasts and associated allocations are typically based on a 90 % exceedance inflow
forecast through September. The Plan manages the cold water pool at Shasta Reservoir using a tiered
strategy to better manage the limited cold water resource for winter-run Chinook salmon egg survival. The
tiered approach recognizes the substantial influence of hydrology on available cold water and targets a
temperature of 53.5°F in the upper Sacramento River above Clear Creek from May 15 to October 31. The
2020 ROD incorporates a number of measures to improve Shasta storage and the related cold water pool
for the upcoming temperature management season. Reclamation will manage water temperatures based on
the following tiers, depending on the actual size of the cold water pool in a given year:
Tier 1 – Sufficient volume of cold water to target 53.5°F or lower starting May 15 through
October 31
Tier 2 –Sufficient volume of cold water to target 53.5°F during critical egg incubation period
Tier 3 – A volume of cold water that can target 53.5-56°F during critical egg incubation period;
and consideration of intervention measures in lower Tier 3 years
Tier 4 – Insufficient cold water to maintain 56°F or lower; and consideration of
intervention measures
Reclamation’s Plan uses modeling and professional expertise to identify the most protective tier that can
be achieved given the available cold water. Before the reservoir stratifies and the volume of cold water is
known, Reclamation estimates temperature capabilities based on projections of storage.
PRE-SEASON ACTIONS
As Water Year 2021 began to shape out, Reclamation worked with water users, the State and Federal
fishery agencies and other stakeholders to implement several actions prior to the start of the temperature
management season. These actions are listed below with a brief description:
2
May 28, 2021
Winter-run Chinook Salmon Conservation Hatchery Production: In February 2021, a multi-agency team
discussed increasing Livingston Stone National Fish Hatchery (LSNFH) winter-run Chinook salmon
production targets for Water Year 2021. Typically, the USFWS would collect 60 females and 100 males
out of the Keswick fish trap; however, due to poor conditions and anticipated low survival of BY 2021
natural winter-run Chinook salmon, they anticipate collecting 120 females and 180 males.
Reclamation is also preparing chillers for use later in the season in the event that deliveries to the hatchery
become too warm.
Shasta Critical Year Determination: In February, Reclamation notified senior water right holders on the
Sacramento River of a Shasta Critical Year and a reduction to 75% of contract totals under the Sacramento
River Settlement Contract.
Water Transfers and Reduced Diversions: Sacramento River Settlement Contractors’(SRSC) scheduled
diversions and transfers to other Sacramento Valley Water Users for 2021 are 1,117,000 AF, an amount that
is less than the volumes diverted and transferred in Water Year 2015. Diversions and transfers are
approximately 65% of Settlement Contract totals, an additional 10% reduction from the 75% shortage
provisions. SRSC have made available 170,000 AF of water available for transfer to other areas of the State
in critical need. This transfer water will be held in Shasta Reservoir over the summer to assist with managing
cold water pool. SRSC are also considering alternatives to rice decomposition water that will provide
additional water savings. The SRSC propose to establish, in cooperation with Reclamation, an emergency
groundwater pumping program to further reduce diversions and address the migratory needs of the Pacific
Flyway. Weekly coordination with Reclamation and contractors on diversions maximizes efficiencies to
retain as much water in Shasta as possible while meeting demands.
Shasta Warm Water Power Bypass: On April 18, 2021 Reclamation adjusted operations to bypass Shasta
Dam’s powerplant and temperature control device (TCD) due to the low water elevation in Shasta Reservoir.
Reclamation released water from the warmer, upper layers of Shasta Reservoir directly through the dam’s
river outlets into the Sacramento River. The purpose of this warm water release was to maintain Sacramento
River flows through the spring while preserving the limited supply of colder water for use later in the
summer when most critical for endangered winter-run Chinook salmon. Fishery agencies provided
preliminary guidance on the maximum temperatures (60 deg F at Clear Creek - CCR) and Reclamation has
been coordinating with the Agencies weekly on the need for potential revisions. Monitoring for
unanticipated effects includes monitoring temperatures and their impacts to hatchery winter-run Chinook
salmon at LSNFH and monitoring winter-run Chinook salmon in the Sacramento River (e.g., observations of
pre-spawning mortality in adults). When fisheries conditions showed possible adverse effects from the
warmer release, Reclamation received updated guidance from the Fishery agencies and began to manage the
river temperatures to 57 deg F at the SAC gage (Sacramento River upstream from Highway 44 bridge)
beginning on May 15 by adjusting the release blend from the bypass with the powerplant and TCD. The
bypass was further reduced as water temperatures in Shasta Lake increased in order to maintain downstream
river temperatures at 57 deg F at SAC. The warm water bypass ended on May 24th due to warming
temperatures and is estimated to have conserved over 300 TAF of cold water (<53 deg F) for use later in the
summer and fall and resulted in a reduction in power generation worth approximately $5 million.
SYSTEM-WIDE DROUGHT OPERATIONS
As mentioned previously, a series of drought actions are being implemented or planned for
implementation for Water Year 2021 that will support reduced releases from Shasta Reservoir in order to
support temperature management through the summer. These actions will be described in more detail in
3
May 28, 2021
the Drought Contingency Plan (to be released by June 1, 2021) and are briefly listed below for reference:
Temporary Urgency Change Petition to modify Delta requirements
Emergency drought barrier to minimize Delta salinity intrusion
Minimum exports to limit releases needed to support Delta needs
Limited use of New Melones to meet delta outflow and salinity requirements
Urban water conservation to limit releases needed to support system needs
Curtailments from the SWRCB to reduce demands throughout the system
Low or zero allocations to CVP and SWP contractors
The combination of these actions may allow for the reduced releases from Shasta Reservoir without causing
devastating impacts to other CVP or SWP reservoirs. A description of the system wide operation is included
in the Drought Contingency Plan.
MODELING ASSUMPTIONS AND LIMITATIONS
A seasonal water temperature forecast describes future expected downstream water temperature. This
forecast, or simulation of expected water temperature performance is based on the targets specified in the
TMP. Future water temperature is forecasted using computational tools, at various elevations in the
reservoirs and downstream in the river. These tools are based on conservative assumptions regarding
hydrology, operations, and meteorology. Because this forecast (using conservative estimates in May to
estimate what might happen at the end of October) can never exactly predict the actual hydrology,
operations, and meteorology, the model results are not expected to precisely match actual water
temperatures. The expectation is, however, that forecasted downstream water temperatures generally have
an accepted measure of error regardless of the uncertain future conditions. In this case, there are generally
two types of simulation error: uncertainty of the future conditions (e.g. inputs such as meteorology) and
inherent model error or bias. To better understand the inherent model error or bias, a hindcast evaluation is
typically performed. A hindcast, rather than looking forward to forecast, simply uses the actual
input/forcing data after it’s observed (e.g. hydrology, operations, and meteorology) to determine how well
the model reproduced a condition such as actual downstream water temperatures.
Reclamation’s draft Plan submitted in early May did not specifically model the anticipated power bypass
for May and only captured the effects of the power bypass through the end of April. This was due to a
model limitation where releases from elevations other than that of the TCD were not an option in
Reclamation’s version of HEC-5Q model. As stated above, the power bypass ended May 24due to
warming conditions in the river. This model includes the effects of the power bypass through May 19, the
date of the profile used for the modeling. Between May 19 and May 24, the power bypass was
significantly less than it has been in late April and early May. Although Reclamation expects to see minor
benefits with the remainder of the power bypass action, its reduced volume is unlikely to have a
significant impact on the temperature management plan included in this report. Profile and modeling
updates will be provided to SRTTG regularly to include any benefit of the power bypass not captured by
this Plan. Moving forward, Reclamation is working with other agencies through a collaborative effort to
build a more flexible model that can simulate power bypass and other operations for analyzing unique
operations in the future.
Water transfers between the SRSC and South of Delta contractors were not finalized at the time of the
Draft Plan released in early May and were therefore not included in the modeling for the Draft Plan. The
anticipated effect of both reducing demands to make this water available and delivering this water to the
purchasers have been incorporated into the release schedule and temperature modeling for this Final Plan.
4
May 28, 2021
This release schedule assumes approximately 170 TAF being made available for transfer to CVP
contractors south of the delta through crop idling and groundwater substitution. This analysis assumes
this water is delivered only across the month of October. Reclamation will continue to evaluate conditions
and work with both SRTTG members and the south of delta purchasers on the best timing for delivery of
this water given the temperature management plan.
Reclamation has proposed the use of NOAA-NWS Local Three-Month Temperature Outlooks (L3MTO)
and historical meteorology as a means of estimating air temperature expectations for modeling purposes. In
coordination with SRTTG, Reclamation has the choice of five exceedance threshold options, varying from
those that serve more conservative stream temperature planning (e.g., 10% exceedance) to those that serve
more aggressive planning (e.g., 90% exceedance). In past years, SRTTG has recommended the use of a
conservative approach that uses the 25% exceedance L3MTO forecast. However, when Reclamation
approached this process similarly this year, the combination of historical data and the 25% exceedance
L3MTO forecast created data quality issues and the data was not usable. The 50% exceedance L3MTO
forecasted temperatures were used in the April temperature modeling and development of the draft
temperature management plan. This is a less conservative approach than was historically used. Reclamation
was able to correct the data quality error from the previous draft to use the 25% exceedance L3MTO
forecast for the Final Plan. In addition, NMFS’ comment letter requested more conservative meteorology
and hydrology be considered in a sensitivity study. This study will be completed by the NMFS Southwest
Fisheries Science Center and shared with the SRTTG.
RELEASE OUTLOOK
The Shasta Reservoir release strategy included in this plan and temperature modeling relies on numerous
drought actions throughout the Sacramento and San Joaquin watersheds to reduce reliance on stored water
from CVP and SWP reservoirs this summer. These drought actions have added a degree of flexibility to
help manage storage at Shasta, Oroville and Folsom reservoirs for meeting public health and safety needs,
repelling salinity in the delta, producing hydropower and providing additional cold water for fishery
protection throughout the summer. In their May 17 comment letter (revised on May 24), NMFS provided
feedback to reduce releases from the “base” run submitted in the draft plan and to set an end of September
carryover target. Similarly, the SRSC also suggested reduced releases from the “base” run. The Water
st
Board also provided feedback in their May 21 comment letter to support an end-of-September carryover
target of 1.25 MAF. In response to these comments, Reclamation has crafted this release schedule to be less
than the “base” scenario and to meet 1.25 MAF by the end of September. This release schedule is intended
to guide the monthly average releases from Keswick Dam. Daily releases may vary from these flows to
adjust for real-time operations.
Significant uncertainties exist within the forecast that will require intensive real-time operations
management throughout the summer to achieve the various goals and targets throughout the system. As
requested in the May 21 Water Board comment letter, Reclamation commits to reporting out on the status of
this release outlook, temperature management and overall system operations at the weekly WOMT meeting.
Table 1 describes the monthly forecasted operations for releases and storage targets.
Table 1. Monthly forecasted operations for Shasta and Keswick Reservoir releases and estimated storage.
Operations June July August September
Information/Month
Shasta Releases (TAF) 332 351346255
5
May 28, 2021
Keswick Releases (cfs)7,1007,5007,1005,800
Keswick Releases (TAF)422461436345
Spring Creek Power Plant 901109090
(TAF)
Shasta End-of-Month Storage 1,822 1,598 1,379 1,250
(TAF)
KEY AREAS OF UNCERTAINTY
Operational decisions on the upper Sacramento River are influenced by local and CVP and SWP system-
wide multi-purpose objectives, including those that are planned and uncertain. Many factors contribute to
operational actions including, but not limited to: flood protection, forecasted inflows, facility maintenance
schedules, physical/mechanical facility limitations, upstream operations, minimum in-stream flow criteria,
downstream Delta regulatory requirements, Delta exports, power generation, recreation, fish hatchery
accommodations, temperature management capabilities, and others. In addition, uncertain or unplanned
events can also influence real-time operation decisions (e.g., wildfires and equipment malfunctions). To
address uncertainty, Reclamation typically uses conservative estimates of future conditions in the modeling
assumptions (e.g., hydrology, operations, and meteorology) and projections are updated through the
management period.
The release forecast used for this temperature management plan is based on a number of assumptions that
each come with a level of uncertainty. A brief list of these assumption areas along with their areas of
uncertainty is listed below:
Inflow hydrology: This forecast is based off the 90% exceedance inflow hydrology for both Shasta
reservoir and the remainder of the watershed. By May, the difference between the 90% and the 99%
exceedance forecast is fairly low. For Water Year 2021, this difference is only 45 TAF for June through
September. Inflows below the 90% may cause challenges in meeting the 1.25 MAF storage target at the end
of September; however lower inflows do not necessarily confirm this number cannot be met as it will
depend on the flexibility in the remainder of the system in the late summer. As stated above, Reclamation
commits to reporting out on the status of this release outlook, temperature management and overall system
operations at the weekly WOMT meeting.
Meteorology: California’s climate is sensitive to large-scale ocean-atmosphere oscillations and is highly
variable from year to year. California has the greatest variation in precipitation compared to all other U.S.
States. Significantly higher ambient air temperatures than assumed in this forecast may result in the need to
adjust the temperature management plan and increase target temperatures. Conversely, some events such as
wildfires can have a large influence on reducing water temperatures as was observed during Water Year
2020. Smoke and haze may dampen the effects of unusually warm air temperature conditions on reservoir
heating and downstream in-river warming.
Lake temperature profile and modeling updates will be provided to SRTTG regularly to communicate
uncertainties in modeling throughout the temperature management season. A comparison between modeled
profiles and actual profiles will be presented to SRTTG to help track the accuracy of forecasts and how
6
May 28, 2021
uncertainties with the meteorology impacted Shasta Lake temperature model results.
Accretions and Depletions: Accretions/depletions are the net gain or loss between the main upstream
reservoirs (Shasta, Oroville, and Folsom) and the Delta, as measured at Freeport along the Sacramento
River. They include the net of inflow from smaller tributaries and creeks, diversions from various water
users north of the Delta and natural losses due to infiltration and evaporation. The forecasted releases used in
this modeling were developed to both meet the end of September storage target of 1.25 MAF and avoid
causing devastating impacts to other parts of the system. The system response to the planned Shasta releases
is partly determined using the assumptions for the monthly accretion/depletions. The methodology for
forecasting these accretions and depletions in Water Year 2021 is unique to previous years due to the
significant drought actions being taken to reduce depletions throughout the system. This methodology,
explained in more detail in the Drought Action Plan, comes with significant uncertainty. While minor
changes in accretions/depletions may cause adjustments in other parts of the system, major increases in
system-depletions may lead to an increase in Shasta releases in order to maintain salinity control in the
Delta. As stated above, Reclamation commits to reporting out on the status of this release outlook,
temperature management and overall system operations at the weekly WOMT meeting.
Delta Water Quality: Similar to the accretion/depletion description above, the forecasted releases made
assumptions regarding necessary flows from the system to meet delta outflow and water quality objectives.
These assumptions, explained in more detail in the Drought Contingency Plan, include anticipated approval
of the TUCP to relax both outflow and water quality standards in June and July and actions by the Water
Board to curtail other diversions. While minor changes in flows required to meet delta water quality may
cause adjustments in other parts of the system, major increases may lead to an increase in Shasta releases in
order to maintain salinity control in the Delta. As stated above, Reclamation commits to reporting out on the
status of this release outlook, temperature management and overall system operations at the weekly WOMT
meeting.
TEMPERATURE STRATEGY
Preliminary temperature analyses, presented to the SRTTG in February and March 2021, included model
runs with CCR target temperature at 56°F. These preliminary simulation results showed that the
temperature target of 56°F could not be maintained for the entire temperature management season. These
runs are characterized by end-of-September cold water pool volumes less than 400 TAF, early side gate
use, and rising temperatures above target thresholds at the end of the simulation.
In March 2021, Reclamation estimated stage-dependent and stage-independent temperature-dependent
mortalities (TDMs), End-of-September Cold Water Pool (EOS CWP), and side gate operations for all 358
scenarios using the Temperature Tier Selection Protocol (TTSP). However, because the TTSP tool was
developed for Tier 2 and Tier 3 Year types, it did not perform well for Water Year 2021 considering this
year is a Tier 4 Water Year. This assessment of scenarios suggested no temperature management scenario
could meet Tier 1-3 biological objectives and facility configuration criteria to avoid loss of temperature
control (exceed 56°F) throughout the duration of the temperature control period. The 358 examined TTSP
scenarios achieved temperature dependent mortality ranging from 90% to 99%. Reclamation commits to
updating this TTSP to address future Tier 4 years through SRTTG prior to the Water Year 2022
temperature management season.
Since the TTSP approach was unable to inform target temperature criteria or duration for a Tier 4 year,
Reclamation gathered input from the Water Board, NOAA Fisheries, the USFWS, CDFW, Tribes, and
7
May 28, 2021
other stakeholders on these elements of the TMP. The agencies and stakeholders provided advice on
temperature criteria for the protection of salmonids.
Reclamation crafted a Plan to minimize modelled temperature dependent mortality with available cold water
within the following criteria and approaches:
Fall Certainty: Approach seeks to avoid use of the side gates until September or later, if possible.
Reclamation was able to develop a Draft Plan with scenarios that would rely on the side gates (i.e.,
full side gate use) by August 29 (Table 2).
Life History Timing Diversity: Approach seeks to develop a temperature window to target 2
standard deviations of historical spawning, starting May 15. Reclamation was able to develop a Plan
that starts June 15 and extends through August.
Critical Egg Incubation Timing and Shoulder Temperatures: Approach seeks to develop a
temperature plan with a colder window during the critical egg incubation period with potentially
warmer shoulder temperatures, if necessary. Reclamation used the 53.7°F egg incubation criteria to
guide the temperature management approach. Reclamation was able to develop a plan that targets
temperatures of 54.5°F during the critical egg incubation time period and shoulder temperatures near
57°F for holding adult winter-run Chinook salmon (Table 1). The egg incubation criteria of 53.7°F
was used as critical threshold input parameter for the temperature dependent mortality modelling
efforts (see Attachment for more information on model assumptions).
Spatial Diversity: Approach seeks to target temperatures are the most downstream point possible
while balancing the approaches listed above. Reclamation was able to develop a plan that targets
preserving redds down to the Highway 44 Bridge.
Cold water efficiency: Reclamation would operate to temperatures at SAC (Highway 44 Bridge) and
respond to actual meteorological conditions.
This plan approach, Scenario 13, includes an initial shaping of temperatures to best meet the above goals and
that would be refined through further SRTTG input on tradeoffs. The TDM results for scenario 13 ranged
from 64-78% (Table 3).
Reclamation has also included a separate reference alternative that starts June 15 and operates to 55°F at
Highway 44 Bridge (Scenario 14; Table 1). The TDM results for scenario 14 ranged from 73-97% (Table 3).
Important performance metrics (TDM, side gate operations, end-of-September cold water pool volume) for
each scenario are described in Table 3. Assumptions and more information for these scenarios are described
in Attachments 1-2.
Table 2. Water temperature target in degrees Fahrenheit at Keswick and Highway 44 for proposed
scenarios. HEC-5Q does not perform well after September 14. Water temperatures may be warmer than
these targets and HEC-5Q results. Warmer water temperatures described in Attachment 2 describe the late
season water temperatures that were used for the temperature dependent mortality modeling.
Month/ KeswickHwy44 Keswick Hwy 44
ScenarioS13 S13 S14 S14
May 56.2 56.1 56.2 56.1
June 55.1 55.1 55.7 55.6
July54.5 54.6 55.0 55.1
August54.3 54.4 55.2 55.2
September 54.9 54.9 54.9 54.8
8
May 28, 2021
October55.7 55.5 54.6 54.4
November53.052.552.752.3
Table 3. TDM, Storage, and first side gate usage for different scenarios.
Metric/Scenario S13 S14
HEC-5Q TDM -Anderson (%)78.2 –78.494.4 –96.6
HEC-5Q TDM -Martin (%)66.6 –77.380.1 –87.6
RAFT TDM – Mean /Median Martin (%)* 64/ 71 73 / 81
End of Sept CWP Storage (TAF)173 230
First Side Gate Use7/13/218/8/21
Full Side Gate 8/29/219/19/21
End of September Storage (MAF) 1.251.25
* Included in Attachment 3
The TDM results achieved with HEC-5Q modeling resulted in higher values than those from the CE-
QUAL modeling as referenced in NMFS’ comment letter on the Draft Plan. Although these models use
different input assumptions, the difference in results was larger than expected. Reclamation hypothesizes
this is related to the HEC-5Q and CE-QUAL predicted temperatures after September 15. River
temperatures are adjusted post-September 15 from the HEC-5Q targets rather than the CE-QUAL’s post-
September 15 predictions to estimate temperature dependent mortality. In Table 3, TDM ranges that
represent HEC-5Q temperature targets (e.g. lower estimate) and the adjusted post-September 15
temperatures. Reclamation will continue to coordinate through SRTTG to review these and other model
results and may update these TDM estimates based on those discussions.
Two additional factors were considered to evaluate a feasible scenario that reduces the risk of losing
control of temperature management in the fall period. The first factor is the end-of-September cold water
pool estimate. Reclamation considers a minimum of 460 TAF as a conservative buffer to achieve a
temperature performance of 56°F at CCR from September 15 through October 31. Neither of the scenarios
reflect a range of end-of-September cold water volumes sufficient to manage unknown factors during
September and October. Therefore, the two scenarios in the Plan may not be able to provide temperature
management in late-September and October. The other factor is the timing of opening of the first TCD
side gate. Reclamation modeling found improving temperature conditions would result in the first TCD
side gate being used on July 13. Based on Reclamation’s operational experience, the later the first side
gate is deployed, the greater the likelihood to maintain temperature management control into the fall.
Reclamation anticipates working with SRTTG prior to June 15 to discuss the risks and tradeoffs between
scenarios S13 and S14 along with any suggestion adjustments to determine the final approach. To
implement the Plan, Reclamation will monitor the cold water pool projections and compare to actual
performance during implementation to ensure sufficient cold water pool throughout the Plan’s duration.
The primary risk management criterion is defined as a cold water pool less than 49°F which is more than
10 percent less than the projected volume. In addition, ongoing modeling results will be completed for
each monthly SRTTG meeting and more often as necessary. These results will be considered should they
indicate increased or decreased risk to fall temperature performance, which is a concern to Reclamation
based on the uncertainty in meteorology, hydrology, and real-time operation conditions unknown to
9
May 28, 2021
Reclamation at the time of TMP selection. In the event that actual cold water pool conditions vary from
what is projected and the fall temperature performance appears at risk, Reclamation will reconvene the
SRTTG in preparation for an adjustment of the TMP. As in past years, Reclamation will work with NMFS
and the other members of the SRTTG during fall operations to both reduce releases to conserve storage
and to address the potential for Chinook salmon redd dewatering.
TECHNICAL ASSISTANCE AND CONSULTATION
Year-around
Agencies meet weekly in the WOMT to discuss operations at all major CVP and SWP facilities. In
addition, technical teams meet regularly to review observed data and make adjustments to the Plan
as needed. The combination of WOMT and technical team meetings will allow for discussion and
feedback on real-time management on at least a weekly basis with staff from the fisheries agencies,
the Water Board, and other appropriate entities.
December to January – Conservation of Cold Water Pool and Inactive Temperature Management
Period
Reclamation provided monthly updates via e-mail to the SRTTG, outlining current river and reservoir
conditions, operations, hydrology, meteorology, and long-range precipitation forecast information. No
significant issues concerning temperature management arose during this period and the SRTTG was not
convened.
February through April – Temperature Management Preparation
Reclamation convened SRTTG meetings, starting in February 2021, on a monthly basis to ensure
communication and coordination among the parties in preparation for the temperature management season.
In mid-February 2021, Reclamation prepared initial projections of anticipated temperature management
capability and considerations based on the 90% February hydrologic and runoff forecasts from DWR and
National Weather Service River Forecast Center. Reclamation’s February projections showed that a Tier 4
year was likely. Reclamation initiated interagency coordination through the Drought and Dry Year
activities and stakeholder coordination through the Meet and Confer activities described in the 2020 ROD.
In February 2021, a multi-agency team discussed increasing LSNFH winter-run Chinook salmon
production targets for Water Year 2021. Typically, the USFWS would collect 60 females and 100 males
out of the Keswick fish trap; however, due to poor conditions and anticipated low survival of BY 2021
natural winter-run Chinook salmon, they anticipate collecting 120 females and 180 males.
In mid-March 2021, the Sacramento River Settlement contractors initiated the meet and confer commitments
under the 2020 Record of Decision and began discussions on voluntary measures for Shasta Cold Water
Pool Management Dry Years, Drought Years, and Successive Dry Years. Reclamation’s Proposed Action
4.12.5 describes that in Tier 3 and 4 years, Reclamation shall meet and confer with USFWS, NMFS, DWR,
CDFW, and Sacramento River Settlement Contractors on voluntary measures to be considered if drought
conditions continue into the following year, including measures that may be beyond Reclamation and
DWR’s discretion. If dry conditions continue, Reclamation will regularly meet with this group (and
potentially other agencies and organizations) to evaluate current hydrologic conditions and the potential for
continued dry conditions that may necessitate the need for development of a drought contingency plan (that
may include actions from the toolkit) for the water year.
10
May 28, 2021
In mid-March 2021, Reclamation prepared updated projections of anticipated temperature management
capability based on 90% March hydrologic and runoff forecasts and historical performance. These
projections were provided to the SRTTG in advance of the March SRTTG meeting. In March, the
projected total Shasta storage on May 1 was less than 2.5 MAF, so Reclamation continued discussions
regarding Tier 4 operations.
In mid-April, Reclamation prepared updated projections of anticipated temperature management capability
including considerations from updated 90% hydrologic and runoff forecasts. These updated projections
were also shared with the SRTTG in advance of scheduled SRTTG meetings and served as the first
assessment of candidate scenarios for the WY2021 temperature management plan.
On April 13, 2021, Reclamation sent a letter to the Water Board seeking support for early temperature
management actions. On April 15, 2021, the Water Board responded to Reclamation’s letter that they were
supportive of early actions that improve temperature management.
On May 5, 2021, Reclamation distributed and requested input on the draft Temperature Management Plan to
the Water Board and SRTTG.
On May 17, 2021, Reclamation submitted a Temporary Urgency Change Petition to request the Water Board
to consider modifying requirements of Reclamation and DWR water right permits to enable changes in
operations of the CVP and SWP that would allow for delivery of water with conservation for later instream
uses and water quality requirements. As announced by the Governor in his May 10, 2021 Emergency
Proclamation on drought conditions for the Bay-Delta and other watersheds, the continuation of extremely
dry conditions in the Delta watershed has resulted in an inadequate water supply that is not able to meet both
water right permit obligations for instream flows and water quality under Water Rights Decision 1641 (D-
1641). For more information:
https://www.waterboards.ca.gov/waterrights/water_issues/programs/drought/tucp/index.html
In mid-late May, Reclamation received letters from the Water Board, NMFS, and SRSC
commenting on the draft Temperature management Plan. Reclamation reviewed these comments
and took them into consideration when developing the final Plan. These letters are posted to the
SWRCB’s web page.
October to May – Spring Pulse Flow
On October 20, 2020, a multiagency team began meeting to plan for spring pulse flow actions. During WY
2021, the Spring Pulse Flow sub-team of the Upper Sacramento River Scheduling Team developed a Spring
Pulse Flow Study Plan and a WY 2021 Spring Pulse Operations Plan. The Spring Pulse Operations Plan was
shared with the Upper Sacramento Scheduling Team and the Sacramento Temperature Task Group in March
and April. Projected Shasta Reservoir storage for May did not meet the initial criteria for implementation of
a spring pulse flow action. Therefore, a spring pulse flow will not occur on the Upper Sacramento River
during Water Year 2021 and is not included in this plan.
MONITORING AND REPORTING
CDFW, PSMFC, and USFWS started weekly carcass and redd surveys for winter-run Chinook salmon in
April. Monitoring efforts by these agencies increased to twice weekly surveys in spawning reaches on
May 3. This monitoring allows for observations of pre-spawn mortality or potential effects associated
with spring TMP operations. These data are being shared in real-time so Reclamation and others are
notified regarding pre-spawn mortality and the initiation of spawning during May. From June through
11
May 28, 2021
October, Reclamation plans to convene SRTTG meetings each month, or more often as warranted by any
changing conditions, to ensure tracking and monitoring of the temperature strategy. Temporary
exceedances of the daily average temperature criteria of more than 3 consecutive days will be reported to
the SRTTG. Should changes to the strategy be necessary, those changes will be developed through
communication and coordination with the SRTTG, and other interested parties as warranted.
In October 2021, data collection by CDFW and communication to Reclamation operations will be
coordinated to determine the ending date of the temperature management period: October 31, or when the
SRTTG determines, based on real-time monitoring that an estimated 95 percent of Winter-run Chinook
Salmon eggs have hatched, and alevin have emerged, whichever is earlier.
In November 2021, Reclamation will operate the TCD to minimize in-river thermal impacts with
remaining cold water pool resources after the end of the temperature management season, if available,
until seasonal changes and ambient conditions dominate river cooling downstream.
For Water Year 2021, Reclamation will complete, in coordination with SRTTG as appropriate, the
following monitoring and reporting practices:
Monthly letters to the Water Board containing relevant data and information as identified in
Order 90-5.
Near-real-time reporting through Reclamation’s web interface of relevant information, located
at the following website: https://www.usbr.gov/mp/cvo/vungvari/sactemprpt.pdf.
Transmittal of pertinent data and information to the SRTTG prior to meetings or more often as
conditions warrant, including applicable modeling and tracking information during the course
of the temperature management season. The modeling and tracking information that support
the Plan are attached (Attachments 1 and 2). Meeting information can be accessed at the
following website: https://www.usbr.gov/mp/bdo/sacramento-river-temperature-task-
group.html and https://www.usbr.gov/mp/cvo/temperature.html
Monitoring and communication to determine on-set of winter-Run Chinook Salmon
spawning.
Monitoring and communication to determine when an estimated 95% of winter-Run Chinook
Salmon eggs have hatched and alevin have emerged.
Reclamation intends to provide temperature profile measurements for Shasta, Whiskeytown, and Trinity
Reservoirs in Water Year 2021 as shown in Table 3 below:
Table 3. Frequency and detail of Northern Central Valley Project temperature profile
monitoring
ReservoirEvery Month Every 2 Weeks Every WeekComment
Shasta 04/01–11/15
01/01–03/01 03/01–04/01 25 ft intervals
for “Every
12/1–12/31 11/15–12/01
Month,”
otherwise 5 ft
intervals
Whiskeytown 01/01–12/31 25 ft intervals
Trinity 01/01–12/31 25 ft intervals
12
May 28, 2021
The time and depth intervals identified above are linked to the historical stratification and de-stratification
of the lakes. When the lake is de-stratified and temperature management is inactive, a finer resolution of
the thermal profile at Shasta Reservoir is not needed.
The monthly temperature profiles for Whiskeytown and Trinity are sufficient to capture the thermal
dynamics; both have limited abilities to actively manage selective withdrawal and the cold-water-pool
volume does not rapidly change for most of the year. Reclamation will post the corresponding
isothermobaths on its website identified above as soon as the information becomes available.
Reclamation has relied on CDFW’s carcass and redd surveys to determine onset of winter-run Chinook
salmon spawning and will rely on CDFW to calculate when an estimated 95% of eggs and alevin have
hatched and emerged. As in past years, Reclamation intends to use the CDFW redd dewatering survey to
provide information on potential redd dewatering and stranding for informing real-time operations of
Shasta and Keswick Dams during the fall transition period.
Reclamation will continue to support and conduct monitoring, modeling, and other evaluations needed to
ensure that temperature management actions are optimized and in order to inform future management
actions. Reclamation will continue to coordinate with CDFW on river operations and flood control
releases to ensure this program can be safely and effectively implemented. Evaluations of operational
actions on the Upper Sacramento River will be documented in the Shasta Cold Water Pool and Winter-
Refill seasonal reports.
Reclamation’s website (https://www.usbr.gov/mp/cvo/vungvari/sactemprpt.pdf ) and letters provide the
information to meet the needs of the SWRCB and fisheries agencies for the locations currently being
monitored. Should the SWRCB or fisheries agencies require the data from any of the monitoring stations
outlined above in other formats or need to obtain data from other monitoring sites that Reclamation
maintains or has access to, Reclamation can work with the SWRCB or fisheries agencies to provide that
data.
Reclamation will report to the Executive Director in writing within 2 business days in the event that
Reclamation’s operations deviate from those outlined in the plan. The report would explain why actual
operations deviated from the TMP, address whether the carryover storage requirements and other TMP
objectives will be achieved and will include a plan to address any deficiencies within Reclamation’s
reasonable control.
WATER RIGHTS ORDER 90-5
Order 90-5 identified a 56°F temperature objective as “the temperature that will protect the fishery from
adverse thermal effects during salmonid spawning and egg incubation.” It further recognizes that
Reclamation’s ability to control temperatures is dependent on the amount of water in storage at Shasta
Reservoir, ambient air temperatures, tributary inflow and other factors, and that the length of the reach to
be protected must be flexible and requires careful planning. Order 90-5 provides that factors beyond
Reclamation’s reasonable control include conditions where protection of the fishery can best be achieved
by allowing a higher temperature in order to conserve cool water for a later release, and conditions where
allowing a higher temperature is necessary to implement measures to conserve winter run Chinook salmon.
For Water Year 2021, Reclamation has determined that it cannot reasonably maintain 56°F at Red Bluff
Diversion Dam and that:
Protection of the fishery can best be achieved by allowing a higher temperature in order to
13
May 28, 2021
conserve cool water for later release,
A higher temperature is necessary to implement measures to conserve winter-run
Chinook salmon.
Reclamation’s Plan to conserve cold water for the duration of the temperature management period
and operate to a higher temperature at Red Bluff Diversion Dam will best protect the fishery from
adverse thermal effects during salmonid spawning and egg incubation. More specifically,
Reclamation will be operating to the temperatures and compliance locations included in the Plan
which are upstream of Red Bluff Diversion Dam.
CONSTRAINTS
Reclamation operates the CVP to deliver water under existing agreements and contracts, including the
Sacramento River Settlement (SRS) contracts, water service contracts (for irrigation and municipal and
industrial purposes), refuge water supply contracts, other agreements, and other requirements such as D-
1641.
The SRS contracts are settlement contracts executed with senior water right holders along the Sacramento
River below Shasta Dam to address senior water rights managed by the State of California. The SRS
contracts provide for the delivery of approximately 2.1 (MAF) of water. Article 5(a) of the SRS contracts
provides that the Contract Total will be reduced by 25% in a Shasta Critical Year. This remains a Critical
Year, so the SRS Contract Totals were reduced by 25% for water year 2021.
Under the Coordinated Operation Agreement (COA) (as amended in 2018), the CVP is responsible for 60%
of water released from storage to meet all in-basin uses in the Sacramento River watershed under balanced
conditions in Critical years. In-basin uses include all accretions and depletions within the Sacramento River
watershed, which include delivery of water to SWP settlement contractors along the Feather River, among
other demands. These Feather River settlement agreements provide over 1 million acre-feet of water each
year and Shasta Reservoir delivers 60% of that amount. DWR has reduced contract deliveries to the Feather
River Contractors this water year, and Reclamation assumed a 50% allocation for them in the analysis. The
State Water Board lifted Term 91 on December 24, 2020, and reestablished it with a curtailment notice on
April 29, 2021. Reclamation anticipates the Water Board will pursue curtailment of other water users in the
Central Valley and Delta.
CVP water service and repayment contracts are met after satisfying senior water rights and regulatory
requirements. Water service contract allocations are a product of an integrated operation of the entire Central
Valley Project in coordination with the State Water Project that considers available water supply, regulatory
obligations including temperature management, conveyance ability and physical capacities. CVP water
service contractors were initially allocated 5% for agricultural and 55% for municipal and industrial of their
Contract Total; however, these allocations were updated to 0% and 25% by late May.
14
49.449.550.950.952.153.151.8
deg F
Lewiston
46.046.246.847.850.252.051.6
deg F
Trinity
Igo
51.353.556.758.758.155.352.9
deg F
56.155.154.654.454.955.552.5
deg F
Hwy44
56.255.154.554.354.955.753.0
deg F
Keswick
54.752.749.850.151.555.452.6
deg F
Shasta
Jul
Oct
Jun
AugSepNov
May
Run date: 5/25/21 S13 EOM Sept storage: 1.25 MAF Trinity profile date: 5/13/21Whiskeytown profile date: 5/18/21Shasta profile date: 5/19/21Projected Side gates: First Jul 13
Full Aug 29Shaded area denotes period of model limitations - see Fall Temperature Index End of September Cold-Water-Pool less than 56 deg F: 173 TAF
12/20
12/5
11/20
56 deg F
11/5
10/21
L3MTO 25%
-
10/6
HWY44
9/21
9/6
8/22
Meteorology
8/7
KESWICK
Exceedance Water Outlook
-
7/23
Sacramento River Modeled Temperature
7/8
2021 May 90%
6/23
SHASTA
6/8
5/24
5/9
656463626160595857565554535251504948474645
49.449.550.950.952.153.151.8
deg F
Lewiston
46.046.246.847.850.252.051.6
deg F
Trinity
Igo
51.353.556.758.758.155.352.9
deg F
56.155.655.155.254.854.452.3
deg F
Hwy44
56.255.755.055.254.954.652.7
deg F
Keswick
54.753.550.551.351.254.152.3
deg F
Shasta
Jul
Oct
Jun
AugSepNov
May
Run date: 5/25/21 S14 EOM Sept storage: 1.25 MAF Trinity profile date: 5/13/21Whiskeytown profile date: 5/18/21Shasta profile date: 5/19/21Projected Side gates: First Aug 8
Full Sep 19Shaded area denotes period of model limitations - see Fall Temperature Index End of September Cold-Water-Pool less than 56 deg F: 230 TAF
12/20
12/5
11/20
56 deg F
11/5
10/21
L3MTO 25%
-
10/6
HWY44
9/21
9/6
8/22
Meteorology
8/7
KESWICK
Exceedance Water Outlook
-
7/23
Sacramento River Modeled Temperature
7/8
2021 May 90%
6/23
SHASTA
6/8
5/24
5/9
656463626160595857565554535251504948474645
Attachment 2
HEC5Q Temperature and Temperature Dependent Modeling Methods and Assumptions
Spatially-explicit daily average Sacramento River water temperatures forecasts from the HEC-5Q model
results are used as inputs to generate temperature-dependent egg mortality estimates. For this period,
historical temperatures on the Sacramento River at Shasta Dam, Keswick Dam, above Clear Creek, Balls
Ferry, Jelly’s Ferry, and Bend Bridge are interpolated to estimate temperatures at river miles where
simulated redds were located. Actual water temperatures at KWK and CCR were used from 1/1/21 to
5/24/21. HEC-5Q output estimates water temperatures at Keswick Dam; however, there is no temperature
gauge at the Keswick Dam, and therefore, the KWK gauge was used for TDM temperature input for the
time period 1/1/21 to 5/24/21.
Between September 15 and November 29, daily temperatures at the simulated redds’ river miles are
typically estimated based on a relationship between cold water pool volume less than 56 degrees F at the
end of September in Shasta Lake and water temperatures above Clear Creek derived by Central Valley
Operations. Reclamation thinks this relationship is more reliable in that time period than outputs from the
HEC-5Q model. The 90% confidence interval value from this analysis was used as a conservative
estimate. The average difference between the simulated temperatures above Clear Creek and the
simulated temperatures at the redds’ river miles during this period are used to adjust above Clear Creek
estimated temperatures for each river mile. Forecasted water temperatures in degrees Fahrenheit
temperatures shown below were used for TDM modeling, instead of HEC-5Q modeled temperatures for
9/15/2021-11/29/21.
Scenario 13 Forecasted Water Temperatures at Keswick:
-0.0067 * (Cold Water Pool Storage) + 58.9900 + 1.7
-0.0067 * 173 + 58.9900 + 1.7 = 59.53 degrees Fahrenheit
Scenario 13 Forecasted Water Temperatures at Clear Creek:
-0.0062*(Cold Water Pool Storage) + 59.2742+2.5=60.286
-0.0062*173 + 59.2742 + 2.5 = 60.70 degrees Fahrenheit
Scenario 14 Forecasted Water Temperatures at Keswick:
-0.0067 * (Cold Water Pool Storage) + 58.9900 + 1.7
-0.0067 * 230 + 58.9900 + 1.7 = 59.15 degrees Fahrenheit
Scenario 14 Forecasted Water Temperatures at Clear Creek:
-0.0062* (Cold Water Pool Storage) + 59.2742+2.5=60.286
-0.0062* 230 + 59.2742 + 2.5 = 60.35 degrees Fahrenheit
We provide TDM estimates using both the water temperature time series adjusted using the regression
relationship described above (Table 1), as well as TDM estimates using water temperature time series that
used HEC-5Q forecasted water temperatures later in the season (Table 2).
Temperature-dependent egg mortality estimates are calculated by modeling a redd’s lifetime based on the
days required to cross a known cumulative degree-day threshold and estimating mortality as an increasing
1
function of temperature past a temperature threshold. Two models were used: 1. Martin et al (2017) for
stage independent modeling whereby a single temperature threshold is used from spawning and
1
Martin B.T. et al. (2017). Phenomenological vs. biophysical models of thermal stress in aquatic eggs. Ecology
Letters 10:50-59.
2
incubation through emergence; and 2. Anderson et al. (2018)for stage dependent modeling for targeting
different temperatures before, during, and after the most sensitive stages during egg incubation. The
methods are applied to a set of simulated redds representative of redd construction timing and location
from 2012-2020 and the results summarized on a seasonal level for comparison. Further information
about the model’s assumptions are documented in Table 1 below.
2
Anderson, J. (2018). Using river temperature to optimize fish incubation metabolism and survival: a case for
mechanistic models. ResearchGate Preprint. 10.1101/257154.
Table 1. Water temperature and winter-run Chinook salmon temperature-dependent mortality assumptions with
adjusted end of season water temperatures.
ParameterScenarios 13and 14Scenarios 13 and 14
Run Date 05/25/21 05/25/21
Meteorology source Forecasted Meteorology 25% L3MTO Forecasted Meteorology 25% L3MTO
Operations Forecast May forecast (based on May1 90% hydrology) May forecast (based on May 1 90% hydrology)
Time period HEC5Q forecast: 5/19/21-11/29/21 HEC5Q forecast: 5/19/21-11/29/21
TDM Input: 1/1/2021-11/29/2021 TDM Input: 1/1/2021-11/29/2021
Reservoir Model usedHEC-5QHEC-5Q
River Model used HEC-5Q until 9/14 then historic relationship to end of HEC-5Q until 9/14 then historic relationship to
September storage below 56 degrees F end of September storage below 56 degrees F
Shasta Profile date 5/19/21 5/19/21
TCD Gate operations HEC-5Q HEC-5Q
Sacramento water temperatures
1/1/2021-5/24/21: Actual KWK and CCR 1/1/2021-5/24/21: Actual KWK and CCR
used for TDM
water temperatures. water temperatures.
5/25/21-9/14/21: HEC-5Q output at Keswick 5/25/21-9/14/21: HEC-5Q output at
Dam and Clear Creek Keswick Dam and Clear Creek
9/15/21-12/31/21: Regression relationship at 9/15/21-12/31/21: Regression relationship
KWK (59.53 F for S13 and 59.15 F for S14) at KWK (59.53 F for S13 and 59.15 F for
and CCR (60.70 F for S13 and 60.35 F for S14) and CCR (60.70 F for S13 and 60.35
S14) F for S14)
Biological Model usedSacPAS Fish model SacPASFish model
Temperature MortalityModel Stage-independent mortality (Martin) Stage-dependent mortality (Anderson)
Egg emergence timing model Linear. 958 ATUs (degrees C), as indicated for Zeug 487 (degree C days)
et al. on SacPAS under Egg to emergence timing
model.
TDM redd time distribution Observed 2012-2020 Observed 2012-2020
TDM redd space distribution Observed 2012-2020 Observed 2012-2020
TDM Tcrit (50th percentile) 53.7°F (12.056°C) 53.7°F (12.056°C)
-1-1-1-1-1-1-1-1
TDM bT(50th percentile) 0.026°Cd(0.0144°Fd) 1.17°Cd (0.65°Fd)
Critical Days All 3
TDM Output (%) Scenario 13: 77 Scenario 13: 78
Scenario 14: 88 Scenario 14: 95
Table 2. Water temperature and winter-run Chinook temperature-dependent mortality assumptions with HEC-5Q
end of season water temperatures.
Parameter Scenarios 13 and 14Scenarios 13 and 14
Run Date 05/28/2105/28/21
Meteorology source Forecasted Meteorology 25% L3MTO Forecasted Meteorology 25% L3MTO
Operations Forecast May forecast (based on May 1 90% hydrology) May forecast (based on May 1 90%
hydrology)
Time period HEC5Q forecast: 5/19/21-11/29/21HEC5Q forecast: 5/19/21-11/29/21
TDM Input: 1/1/2021-11/29/2021TDM Input: 1/1/2021-11/29/2021
Reservoir Model used HEC-5Q HEC-5Q
River Model usedHEC-5Q until 9/14 then historic relationship HEC-5Q until 9/14 then historic relationship
to end of September storage below 56 degrees to end of September storage below 56
F degrees F
Shasta Profile date 5/19/21 5/19/21
TCD Gate operations HEC-5Q HEC-5Q
Sacramento water temperatures
1/1/2021-5/24/21: Actual KWK and CCR 1/1/2021-5/24/21: Actual KWK and
used for TDM
water temperatures. CCR water temperatures.
5/25/21-12/31/21: HEC-5Q output at 5/25/21-12/31/21: HEC-5Q output at
Keswick Dam and Clear CreekKeswick Dam and Clear Creek
Biological Model used SacPAS Fish model SacPAS Fish model
Temperature MortalityModel Stage-independent mortality (Martin) Stage-dependent mortality (Anderson)
Egg emergence timing model Linear. 958 ATUs (degrees C), as indicated for 487 (degree C days)
Zeug et al. on SacPAS under Egg to emergence
timing model.
TDM redd time distribution Observed2012-2020 Observed 2012-2020
TDM redd space distribution Observed2012-2020 Observed 2012-2020
TDM Tcrit (50thpercentile) 53.7°F (12.056°C) 53.7°F (12.056°C)
-1-1-1-1-1-1-1-1
TDM bT (50th percentile) 0.026°Cd(0.0144°Fd) 1.17°Cd (0.65°Fd)
Critical Days All 3
TDM Output (%) Scenario 13: 67Scenario 13: 78
Scenario 14: 80 Scenario 14: 94
Figure 1. Forecasted Sacramento River winter-run Chinook salmon redd exposure at hatching to
forecasted water temperatures described in Scenario 13 using temperatures adjusted end-of-season
regression approach.
Figure 2. Winter-run Chinook salmon redd and egg incubation timing with forecasted water temperatures
from Scenario 13 using temperatures adjusted end-of-season regression approach.
Figure 3. Forecasted Sacramento River winter-run Chinook salmon redd exposure at hatching to
forecasted water temperatures described in Scenario 14 using temperatures adjusted end-of-season
regression approach.
Figure 4. Winter-run Chinook salmon redd and egg incubation timing with forecasted water temperatures
from Scenario 14 using temperatures adjusted end-of-season regression approach.