HomeMy WebLinkAbout07.02.21 Board Correspondence - FW_ Other Dam Safety Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
From:Clerk of the Board
To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Hironimus, Patrizia;Kimmelshue, Tod;Lucero, Debra;Paulsen, Shaina;Pickett, Andy;Reaster, Kayla;Ring,
Brian;Ritter,
Tami;Sweeney, Kathleen;Teeter, Doug
Subject:Board Correspondence - FW: Other Dam Safety Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
Date:Friday, July 2, 2021 11:44:59 AM
Please see the below correspondence.
Kayla Reaster, MBA, MAED
Associate Clerk of the Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
T: 530.552.3308 | F: 530.538.7120
Twitter | Facebook | YouTube | Pinterest
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, July 2, 2021 8:35 AM
Subject: Other Dam Safety Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 7/2/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
No Organization Found (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Other Dam Safety Report
Description: Pacific Gas and Electric Company submits Response to Comments on Access Improvements for the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210702-
5020__;!!KNMwiTCp4spf!SaL4dfKVelT4rM_9OO8iBNv46z_1eaKpcSHbg2vGjuFYoSxJwH6exX0zMPbTwSP5WAi7-vPNcIU$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!SaL4dfKVelT4rM_9OO8iBNv46z_1eaKpcSHbg2vGjuFYoSxJwH6exX0zMPbTwSP5WAi7Dd95N3E$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!SaL4dfKVelT4rM_9OO8iBNv46z_1eaKpcSHbg2vGjuFYoSxJwH6exX0zMPbTwSP5WAi7XcvLVgE$
or for phone support, call 866-208-3676.
245 Market Street
tƚǞĻƩ DĻƓĻƩğƷźƚƓ
San Francisco, CA 94105
Mailing Address:
Mail Code N11D
P.O. Box 770000
San Francisco, CA 94177
July 1, 2021
Via Electronic Submittal (E-File)
Frank Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Grizzly Forebay Dam, NATDAM No. CA00333
Response to Comments on Access Improvements
ENCLOSURES CONTAIN CUI//CEII DO NOT RELEASE
Dear Frank Blackett:
This letter presents responses to Federal Energy Regulatory Commission (FERC)
comments regarding Paaccess improvements
project at Grizzly Forebay Dam, which is part of PG&E Bucks Creek Hydroelectric
Project, FERC No. 619.
April 29, 2021, and FERC provided comments in a letter to PG&E dated June 17, 2021.
s June 17, 2021 comments are provided in Enclosure 1.
Updated construction documents (Enclosures 2 through 5) are also provided in response
, as referenced in Enclosure 1.
PG&E plans to perform the access improvements at the earliest, safe opportunity after this
letter is submitted.
Ongoing shelter-in-place orders issued by the State of California in response to the
COVID-19 pandemic require that nonessential PG&E staff work remotely, and hard copy
filings are not practical at this time. If FERC requires hard copies of this letter and/or
enclosures, please contact the license coordinator identified below. If necessary, hard
copies will be sent after the shelter-in-place restrictions have been lifted and PG&E staff
have returned to their normal work locations.
Frank Blackett, P.E.,Regional Engineer
July 1, 2021
Page 2
dam safety engineer, Ben Fontana, at (530) 762-9459. For general questions, please
Jamie Visinoni, at (530) 215-6676.
Sincerely,
Teri Smyly
Manager, FERC and DSOD Compliance
Enclosures: CUI//CEII DO NOT RELEASE
1. PG&E's Responses to Comments from FERC's Letter Dated June 17, 2021
2. Approved-for-construction drawings for the Grizzly Forebay Dam access improvement
project, prepared by Mead & Hunt, dated April 16, 2021
3. Revised Supporting Design Report, prepared by Mead & Hunt and dated December 31,
2020
4. Technical Specifications for Pacific Gas & Electric Grizzly Forebay Dam Access
Improvements, prepared by Mead & Hunt and dated April 16, 2021
5. Revised Quality Control and Inspection Program for Grizzly Forebay Dam Access
Improvements, prepared by PG&E and dated April 19, 2021