Loading...
HomeMy WebLinkAbout07.26.21 Board Correspondence - FERC Emails From:Paulsen, Shaina To:Alpert, Bruce;Bennett, Robin;Clerk of the Board;Connelly, Bill;Cook, Holly;Cook, Robin;Hironimus, Patrizia; Kimmelshue, Tod;Lucero, Debra;Paulsen, Shaina;Pickett, Andy;Reaster, Kayla;Ring, Brian;Ritter, Tami; Sweeney, Kathleen;Teeter, Doug Subject:Board Correspondence - FERC Emails Date:Monday, July 26, 2021 9:23:41 AM Attachments:FERC 07.14.21 through 07.22.21.pdf Please see attached Board Correspondence from FERC received between the dates 7/14-7/22/21. Shaina Paulsen Administrative Assistant, Senior Butte County Administration 25 County Center Drive, Suite 200 Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 From:"FERC eSubscription" Subject:Dam Safety Compliance Report submitted in FERC P-1061-019,et al. by Pacific Gas and Electric Company,et al. Date:Thursday, July 15, 2021 11:25:52 AM .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/15/2021, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas and Electric Company (as Agent) Docket(s): P-1061-019 P-1121-000 P-1333-000 P-1354-000 P-137-000 P-175-000 P-1962-001 P-1988-000 P-2105-000 P-2106-000 P-2107-000 P-2130-000 P-2310-000 P-233-000 P-2661-000 P-2687-000 P-2735-000 P-606-000 P-619-000 P-77-001 P-803-000 P-96-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits Owner's Dam Safety Program Audit Updates under P-77, et. al. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210715- 5072__;!!KNMwiTCp4spf!VFvsmE_ew44C2xogi7aZm3BUx1cv6jp_X_fY1EBmX0wS9RQGaUwbQ9R1qYlGBhEbHDpmANSYOcQ$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!VFvsmE_ew44C2xogi7aZm3BUx1cv6jp_X_fY1EBmX0wS9RQGaUwbQ9R1qYlGBhEbHDpmVSn4uIg$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!VFvsmE_ew44C2xogi7aZm3BUx1cv6jp_X_fY1EBmX0wS9RQGaUwbQ9R1qYlGBhEbHDpm34aGDVo$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 July 15, 2021 San Francisco, CA 94177 Via Electronic Submittal (E-File) Mr. Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Owners Dam Safety Program Audit FERC Project Nos. 77, 96, 137, 175, 233, 606, 619, 803, 1061, 1121, 1333, 1354, 1962, 1988, 2105, 2106, 2107, 2130, 2310, 2661, 2687, and 2735 Dear Frank L. Blackett: This letter presents an update on (PG&E) schedule for conducting an external audit of ODam Safety Program (ODSP). As described in letters to your office, dated August 10, 2020 and January 7, 2021, PG&E proposed a panel of four independent experts to perform the audit, which was scheduled to occur during the first two weeks of August 2021. FERC approved panelists and schedule on April 28, 2021. Restrictions on international travel related to the COVID-19 pandemic prevent Mr. Stephen Rigbey, audit panelists and a Canadian resident, from fully participating if the audit proceeds in August, as scheduled. To participation in planned in-person interviews and field visits, PG&E has elected to postpone the audit until November 2021. PG&E plan to conduct the audit in virtual and in-person phases during two consecutive weeks remains unchanged. The first phase, comprising video conference presentations and interviews with PG&E leadership and key dam safety staff, has been rescheduled for the week of November 8, 2021. The second phase, involving field visits and interviews with local dam safety engineers, operations and maintenance crews, and other PG&E staff who support the ODSP, has been rescheduled for the week of November 15, 2021. Dam Safety Program. Should you have any questions concerning this matter, please contact me at (415) 264-1795. Sincerely, David L. Ritzman, P.E., G.E. Chief Dam Safety Engineer From:"FERC eSubscription" Subject:Delegated Order issued in FERC P-619-000 Date:Thursday, July 22, 2021 11:45:15 AM .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/22/2021, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter order to Pacific Gas and Electric Company accepting the plan and schedule to address the Independent Consultant's recommendations for Eleventh Part 12D Inspection for Lower Bucks Lake, part of the Bucks Creek Project under 619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210722- 3059__;!!KNMwiTCp4spf!WCCzVsMC6NOXZGkYEoDsLDJdksOMiWCtYYhaicTtxHD87Fkv0NGUvrSDZYZCh8Q5-37LUAstFjo$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!WCCzVsMC6NOXZGkYEoDsLDJdksOMiWCtYYhaicTtxHD87Fkv0NGUvrSDZYZCh8Q5- 37L4TyCvEY$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!WCCzVsMC6NOXZGkYEoDsLDJdksOMiWCtYYhaicTtxHD87Fkv0NGUvrSDZYZCh8Q5- 37LU2qXIpY$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 Office (415) 369-3322 Facsimile July 22, 2021 In reply refer to: Project No. 619-CA Mr. Jan Nimick, Vice President Pacific Gas and Electric Company (PG&E) Mail Code N11E P.O. Box 770000 San Francisco, CA 94177-0001 Re: Lower Bucks Lake Eleventh Part 12D Plan and Schedule Dear Mr. Nimick: This is in response to a letter dated April 1, 2020, from Mr. David Ritzman that submitted the plan and schedule recommendations for Eleventh Part 12D Inspection for Lower Bucks Lake, part of the Bucks Creek Hydroelectric Project, FERC Project No. 619. The plan and schedule to address the recommendations 12D inspection by the dates outlined in the Enclosure 1 of the ter is acceptable except for the following: 1. Recommendation 1 the analysis of alternatives (AoA) to address potential spillway deficiencies by June 30, 2021 is overdue. 2. Recommendation 3 - a plan and schedule for updating Section 5 of the Supporting Technical Information Document (STID) within 90 days after receiving approval from FERC for the erodibility and scour assessment of the downstream foundation and abutment is not acceptable. The STID should be updated once the assessment is completed. 3. Recommendations 4 and 5 - updating Section 8 of the Supporting Technical Information Document (STID) within 90 days after receiving approval from FERC for the updated stability analysis is not acceptable. The STID should be updated once the updated stability analyses are completed. 2 4. Section 5 and Section 8 of the Supporting Technical Information Document (STID) within 90 days after receiving approval from FERC for the kinematic study is not acceptable. The STID should be updated once the kinematic study is completed. 5. Recommendation 8 - Section 6 of the Supporting Technical Information Document (STID) within 90 days after receiving approval from FERC for the 2020 inflow design flood (IDF) study is not acceptable. Update the STID to include the results of the 2020 IDF study. Within 45 days from the date of this letter, please provide a response to our comments or a plan and schedule for address our comments. File your submittals using the Commission's eFiling system at https://www.ferc.gov/ferc-online/overview. For all Dam Safety and Public Safety Documents, select Hydro: Regional Office and San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued cooperation in this aspect of the safety program. If you have any questions, please contact Mr. Thao Bui at (415) 369- 3312 or Mr. Edgar Salire at (415) 369-3369. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Chief CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 From:"FERC eSubscription" Subject:Delegated Order issued in FERC P-619-000 Date:Wednesday, July 14, 2021 5:25:11 AM .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/13/2021, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter order to Pacific Gas and Electric Company accepting the responses and a plan and schedule to address FREC's comments on the 2017 focused spillway assessment report for Lower Bucks Lake Dam, part of the Bucks Creek Hydroelectric Proj., P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210713- 3068__;!!KNMwiTCp4spf!T41jLiIpar30qKGRcpMUgbvsVHpafA205ijelKM64GR2SuK6fnIW1-0chM_y-qGeULrXgU7mR_c$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!T41jLiIpar30qKGRcpMUgbvsVHpafA205ijelKM64GR2SuK6fnIW1- 0chM_y-qGeULrXcBZdig0$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!T41jLiIpar30qKGRcpMUgbvsVHpafA205ijelKM64GR2SuK6fnIW1- 0chM_y-qGeULrX_L7WyrE$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 Office (415) 369-3322 Facsimile July 13, 2021 In reply refer to: Project No. 619-CA Mr. Jan Nimick, Vice President Pacific Gas and Electric Company Mail Code N11E P.O. Box 770000 San Francisco, CA 94177-0001 Re: Lower Bucks Lake Dam - 2017 Focused Spillway Assessment Report Dear Mr. Nimick: This is in response to a letter dated April 15, 2021 from Mr. David Ritzman that submitted responses and a plan and schedule to address our comments regarding the 2017 Focused Spillway Assessment Report for Lower Bucks Lake Dam, which is part of the Bucks Creek Hydroelctric Project, FERC No. 619. We have reviewed the responses and have no comments. The plan and schedule to submit the status summary table addressing the recommendations from the 2017 Focused Spillway Assessment Report by July 31, 2021 is acceptable. File your submittal using the Commission's eFiling system at https://www.ferc.gov/ferc-online/overview. For all Dam Safety and Public Safety Documents, select Hydro: Regional Office and San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). 2 We appreciate your continued effortsdam safetyprogram.If you have any questions, please contact Mr.Edgar Salireat (415)369-3369. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Chief Division of Safety of Dams California Department of Water Resources P.O. Box 942836 Sacramento, CA 94236-0001 From:"FERC eSubscription" Subject:FERC Correspondence With Government Agencies issued in FERC P-619-000 Date:Monday, July 19, 2021 11:55:25 AM .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/19/2021, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: FERC Correspondence With Government Agencies Description: Letter to U.S. Fish and Wildlife Service discussing the request for concurrence with endangered species determinations under section 7 of the Endangered Species Act for the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210719- 3038__;!!KNMwiTCp4spf!UnYbhShRlh57R5r64q3aeR1k_iJVAyszmvuBHbSh8GLvd84O2Tf7yHBQdcKHinxraW97OgEK6wU$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!UnYbhShRlh57R5r64q3aeR1k_iJVAyszmvuBHbSh8GLvd84O2Tf7yHBQdcKHinxraW97- eZc7Vs$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling- help.asp__;!!KNMwiTCp4spf!UnYbhShRlh57R5r64q3aeR1k_iJVAyszmvuBHbSh8GLvd84O2Tf7yHBQdcKHinxraW979R1mtK8$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Washington, D. C. 20426 OFFICE OF ENERGY PROJECTS Project No. 619—California Bucks Creek Hydroelectric Project Pacific Gas and Electric Company City of Santa Clara, California July 19, 2021 VIA USPS First Class Mail Ms. Kim Turner Deputy Field Supervisor U.S. Fish and Wildlife Service 2800 Cottage Way, Room w-2605 Sacramento, CA 95825 Subject: Request for concurrence with endangered species determinations under section 7 of the Endangered Species Act Dear Ms. Turner: The purpose of this letter is to request your concurrence with our endangered species determination under section 7 of the Endangered Species Act regarding the replacement of the Haskins Boat Ramp, part of the Bucks Creek Hydroelectric Project No. 619. The project is located on the North Fork Feather River and Bucks and Grizzly creeks in Plumas County, California. The project occupies federal land within the Plumas National Forest administered by the U.S. Forest Service. The Haskins Boat Ramp (boat ramp) is located in Haskins Bay, at the southern end of Bucks Lake and is designated as a project recreation facility. Access to the boat ramp is gained through the Haskins Valley Family Campground, which is also designated as a project recreation facility. Both the campground and boat ramp were constructed in 1967. The existing boat ramp is a single lane, approximately 12-foot wide, concrete ramp that extends from the campground parking lot into Haskins Bay. In 2013, Pacific Gas and Electric Company (licensee) concluded that the ramp needed repair, and in 2014 an assessment was completed as part of a draft license application, where it was recommended to repair the boat ramp. In addition to the boat launch, the existing parking lot has also deteriorated among other things. In 2019, it was determined that the extent of the damage to the ramp would require full replacement since repair was no longer a viable or economical option. Project No. 619-000 -2 - On April 13, 2021, the licensee submitted a proposal for replacing the exiting boat 1 ramp. The licensee proposes to demolish the existing boat ramp, construct an Armorflex concrete mat replacement boat ramp, and construct new pavement on an access road, a turnaround, and a parking area. The proposed work would occur, in part, within the dewatered lakebed of Bucks Lake and is scheduled to begin in mid-to-late September of 2021. Staging would occur in previously developed areas within the work area, Haskins Campground, and at a developed staging area on the licensee’s property adjacent to the Oro-Quincy highway, which is a short distance from the work area. As you are aware, Commission staff designated the licensee as its non-federal representative for informal consultation concerning this matter in a March 22, 2021 letter. As part of the consultation, the licensee developed a biological assessment (BA) to consider the effects to federally-listed species potentially affected by the proposed action. The biological assessment considers potential effects to the California red-legged frog, the Sierra Nevada yellow-legged frog, Delta Smelt, and the Sierra Nevada yellow-legged frog critical habitat and are described in an applicant-prepared BA. Analysis in the BA found that the replacement project would have no effect on California red-legged frog because suitable habitat does not exist for the species, which is located at the very top of the species elevational range, nor were any individuals of this species observed during focused surveys for amphibians and aquatic reptiles during surveys that were performed for the relicensing of the project. The BA also found that the replacement project would have no effect on Delta Smelt since they are endemic to the Sacramento San Joaquin Delta and do not occur in the Feather River watershed, where the project is located. The BA states that most of the action area for the boat ramp replacement lies within or immediately adjacent to designated critical habitat for the Sierra Nevada yellow-legged frog. However, none have been documented in the action area during recent surveys. The primary risk to the Sierra Nevada yellow-legged frog would be to individuals that might migrate into the work area by traveling along the lake shore from Haskins Creek, if they still exist in that area. Activities from the replacement project that could pose a risk to the Sierra Nevada yellow-legged frog include drawing down Bucks Lake, erosion control and water quality measures, and post-project completion site restoration, and the BA indicates that it is unlikely that these activities would affect the frog. However, the BA includes measures designed to protect Sierra Nevada yellow-legged frog and its habitatwithin the project boundary to avoid or minimize adverse effects on the species during replacement of the boat ramp. 1 The licensee’s proposal can be accessed at: https://elibrary.ferc.gov/eLibrary/filelist?document_id=14947834&accessionnumber=202 10413-5301 Project No. 619-000 -3 - We conclude that the proposed action with the included avoidance and minimization measures “may affect, but is not likely to adversely affect” the Sierra Nevada yellow-legged frog and its critical habitat. Therefore, we do not believe that formal consultation is required under the Endangered Species Act. Please tell us in writing within 30 days from the date of receipt of this letter if you do or do not agree with our assessment. Please inform us in writing, within 30 days of the date of this letter, if you concur with our determinations. The Commission strongly encourages electronic filing. Please file your response using the Commission’s eFiling system at http://www.ferc.gov/docsfiling/efiling.asp . For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, D.C. 20426. The first page of any filing related to this letter must include the project number P-619. Should you need to informally discuss any concerns before making your determination, please contact Shawn Halerz at (202) 502-6360 or Shawn.Halerz@ferc.gov. Thank you for your cooperation in this matter. Sincerely, Robert J. Fletcher Land Resources Branch Division of Hydropower Administration and Compliance cc: VIA FERC Service Ms. Jan Nimick, V.P. - Power Generation Pacific Gas and Electric Company 245 Market Street Mail Code: N11E San Francisco, CA 94105 From:"FERC eSubscription" Subject:General Correspondence issued in FERC P-619-000 Date:Wednesday, July 14, 2021 5:45:10 AM .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 7/13/2021, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: General Correspondence Description: Letter responding to Pacific Gas and Electric Company's 06/08/2021 letter submitting the responses to follow-up action items from the 2019 annual dam safety inspection for Bucks Lake Dam et al, parts of the Bucks Creek Proj., P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20210713- 3076__;!!KNMwiTCp4spf!UQUA0b5P2DlFJ10x3jOByljaAH2Gb1wSHRzbAgSCicFZylEg0zBofPz5ZynGeFSpkdGjFirS61w$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!UQUA0b5P2DlFJ10x3jOByljaAH2Gb1wSHRzbAgSCicFZylEg0zBofPz5ZynGeFSpkdGjsMpO_6s$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!UQUA0b5P2DlFJ10x3jOByljaAH2Gb1wSHRzbAgSCicFZylEg0zBofPz5ZynGeFSpkdGj-MVuPW8$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 Office (415) 369-3322Facsimile July 13, 2021 In reply refer to: Project No. 619-CA Mr. Jan Nimick, Vice President Pacific Gas and Electric Company Mail Code N11E P.O. Box 770000 San Francisco, CA 94177-0001 Re:2019 Dam Safety Inspection Follow-Up Dear Mr.Nimick: This is in response toaletter datedJune 8, 2021from Mr.David Ritzmanthat submitted theresponses to follow-up action items from the 2019 annual dam safety inspectionfor Bucks Lake, Lower Bucks Lake, and Grizzly Forebay Dams, which are part of the Bucks Creek Project, FERC No. 619. We have reviewed thesubmittal, and we have nocomments. program. If you have any questions, please contact Mr.Edgar Salireat (415) 369 3369. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Chief Division of Safety of Dams California Department of Water Resources P.O. Box 942836 Sacramento, CA 94236-0001