Loading...
HomeMy WebLinkAboutB18-0853 CF Suppression Hood Inspection Butte County Fire Department Fire Prevention Bureau 176 Nelson Avenue Oroville, CA 95965 Butte County as �r Office 530.538.7888 Af www.buttecountv.net/fire '` " ° isi'A' Fixed Extinguishing System (Hood System) CODE REFERENCES 2016 California Fire Code (CFC), Chapter 9 Section 905 National Fire Protection Association (NFPA) 17 and 96 International Mechanical Code (IMC) 3 /6- C1 653 REQUIRED INSPECTIONS U -I-f 1. System function test. 2. Fire Alarm test if applicable. FILE REVIEW Y N N/A NI- ❑ ❑ 1. Approved plans and permit on site. ❑ ❑ 2. Plans match appliance layout, system manufacturer model and size. • ❑ ❑ 3. System complies with UL 300 Standard. CFC 904.11 .�❑ ❑ 4. Gas and electric supplies are hooked up and activated. ❑ ❑ A 5. If required for evacuation of a building/premises, fire alarm is linked to the suppression system. CFC 904.3.5 FIELD INSPECTION �'❑ ❑ 1. Verify suppression system installation is consistent with approved plans. t❑ ❑ 2. Verify nozzle locations match what is depicted on approved plans. ❑ ❑ 3. Verify all appliances are protected with approved nozzles. CFC 904.11 • ❑ 4. Verify the kitchen hood must extend at least 6" from all appliances. ❑ ❑ A, 5. Verify a 9" splash guard or a 16" separation must be present on a fryer if it sits next to an open- flamed, gas-fired appliance,. �'❑ ❑ 6. Verify balloons are in place on all nozzles (plenum, duct shaft, and over all appliances). . ❑ ❑ 7. Industry Standard -Verify Inert(nitrogen or CO2) gas supply hooked up to system for test. ❑ 8. Verify system functionality by both manual pull station, and a test link located in the plenum chamber. ikr❑ ❑ 9. Verify system actuate immediately upon the pull station activation or cutting the test link. I'.I � ❑ 10. Verify gas appliances shut off-CFC 904.3.3. ❑ ❑ 11. Verify electrical equipment shut off. The exhaust fan shall continue to operate-CFC 904.3.3. ❑ ❑ 12. Verify the building fire alarm system activate (if required) -CFC 904.3.5. f;Q❑ ❑ 13. Manufacture Standard Method -Verify balloons inflated properly (depending upon flow points) to show correct nozzle flow. ❑ ❑ 14. Verify system by second means of activation. Pull station or Test Link (Circle one) -CFC 904.11.1 ❑ ❑ 15. Verify all penetrations of the hood are protected by UL approved grease-seals -CFC 904.11. ' ❑ ❑ 16. Industry Standard -Verify all pipe threads are Teflon-taped per manufacture listing or industry standard. ❑ ❑ 17. Verify nozzles are correct for appliances and aimed correctly- CFC 904.4.1. ❑ ❑ 18. Verify Class K fire extinguisher is mounted, tagged and sealed. ❑ ❑ 19. Post required signage for Class K extinguisher-CFC 904.11.5.2. ❑ ❑ 20. Verify nozzle caps have been installed after acceptance test. ❑ ❑ 21. Verify system has been tagged with proper State Fire Marshal's certification tag-Title 19 CCR. V ❑ ❑ 22. Verify Owner's Manual left with owner- NFPA 17. 1