HomeMy WebLinkAboutB17-2828 CALFIRE OVERHEAD SPRINKLER HYDRO TEST (2)SYSTEMS ACCEPTANCE
13-245
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by the properly owner or
their authorized agent. All defects shall be corrected and system left in service before contractor's personnel finally leave the job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and
contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor
workmanship, or failure to comply with approving authority's requirements or local ordinances.
Property name PAC \ O N A C 1 S
Date 1_ 3,._ i g
Property address 1 5 i3 Hwy. 9°r 61zt lie C A q5--ei 4$
Accepted by approving authorities (names) C^ L c t R. E
1�
Address I. A f e) S O v ew u
b I" A o got,' lie cA 95965
Plans
Installation conforms to accepted plans Yes C3 No
Equipment used is approved Di Yes [DNo
If no, explain deviations
Has person in charge of fire equipment been instructed as 12Yes ❑ No
to location of control valves and care and maintenance
of this new equipment?
1f no, explain
Instructions
Have copies of the following been left on the premises? CaYes ❑ No
1. System components instructions raitYes ❑No
2. Care and maintenance instructions 'Yes Li No
3. NFPA25 §kYes CINo
Location of
system
Supplies buildings m C 4, O N A J f'
Make
Model
Year of
manufacture
Orifice
size
Quantity
Temperature
rating
'Tyco 55)
Ty rt
z e i 7
lz.
5 6
200
Sprinklers
TY(Q S5 P
TY fit
7-017
flz_ign,
1 55
TYCo
Zo17
3/Z-
zc.D
__cS-1
Pipe and
Type of pipe 44.0 Th, -ail A egPir f 10 u
fittings
Type of fittings Ct.. C' f ie. 6 l(tC e oe a
Alarm
Alarm device
Maximum time to operate
through test connection
valve or
flow
Type
Make
Model
Minutes
Seconds
indicator
14f #T P4 Flo "I
pt `It PQ
1i,5 f- f
(
0
Dry valve
Q. O. D.
Make
Model
Serial no.
Make
Model
no.
Ix
pipe
Time to trip
through test
connectiona.b
Water
pressure
Air
pressu =
• ✓• nt
air pressure
Time water
reached
test outfeta,b
Alarm
operated
Property
operating
test
Minutes
Seconds
psi
_Psi
psi
'Minutes
Seconds
Yes
No
Without
Q.O.D.
With
Q.Q.D.
® 2.12 . • nal Fire
If • • a plain
Protection Association NFPA 13 (p. 1 of 3)
a Measured from time inspector's test connection is opened.
b NFPA 13 only requires the 60 -second limitation in specific sections.
FIGURE 25.1 Contractor's Material and Test Certificate for Aboveground Piping.
2013 Edition
13-246 INSTALLATION OF SPRINKLER SYSTEMS
FIGURE 25.1 Continued
2013 Edition
Operation ❑Pneumatic ❑Electric ❑Hydraulics __....•,----."
Piping supervised jYes jNo
Detecting media supervised ■ yes ■ No
NDoes
valve operate from the manual trip, remote, or both con .- ions? Yes ID No
Delu a//a�rnd
preaction
Is there an accessible facility in each circuit
❑ Yes
valves
Does each circuit operate
pp , oPilidillillel .1__ supervision loss alarm?
Does each circuit operate
valve release?
operate release
I Yes
No
Yes
No
Minutes
Seconds
Pressure
Location
Make and
Residu
-
reducing
and ..
Flow rate
valve st
(psi) Outlet (psi)
Inlet (psi) Outlet (psi)
Flow (gpm)
N/A
Backflow device
Indicate means used for forward flow test of backflow device:
forward
flow test
When means to test device was opened, was system flow demand created? ❑ Yes Uli No Li N/A
ydrostatic: rostatic tests shall be made at not less ti . ,iirglINP 3.6 bar) for 2 hours or 50 psi (3.4 bar)
Test
description
is pressure in excess of 150 psi (10.2 bar) f.i 2 •. Iifferential dry pipe valve clappers shall be lett
open during the test to prevent damage. All abovegroun• piping leakage shall be stopped.
Pneumatic: Establish 40 psi (2.7 bar) air pressure an. .. -- . - . -xcee• • . :ar)
in 24 hours. Test . - . a norma wa er evel and air pressure and measure air pressure drop, which shall
not . - 2 psi (0.1 bar) in 24 hours.
All hydrostatically tested at- (— bar) for hours
If no, state reason
piping psi -
Dry piping pneumatically tested LJ Yes a -No
Equipment operates properly
aYes D No
Do you certify as the sprinkler contractor that additives ana corrosive chemicals, sodium silicate or derivatives
of sodium silicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks'?
26es LINO
Tests
Drain
test
1 Reading of gauge located near water I Residual pressure with valy9.in test
supply test connection: �Z psi ( bar) I connection open wide' Q- `-psi ( bar)
Underground
sprinkler
Verified by
Certificate
Flushed by
mains and lead-in connections to system risers flushed before connection
piping
copy of the Contractor's Material and Test ZrYes CA No
for Underground Piping. �-
installer of underground sprinkler piping LaYes I No
made to
Other Explain
If powder -driven fasteners are used in concrete, 1:11 Yes �M
has representative sample testing been
satisfactorily completed?
If no, explain
w ,Q
I -
Blank testing
gaskets
Number used a,
-�-
Locations
i Number removed
Welding piping fai'es ❑ No
If yes ...
Welding
® 2012 National Fire
Do you certify as the sprinkler contractor that welding procedures used complied with Yes ❑ No
the minimum requirements of AWS 82.1, ASME Section IX Welding and Brazing
Qualifications, or other applicable qualification standard as required by the AHJ?
Do you certify that all welding was performed by welders or welding operators yYes j No
qualified in accordance with the minimum requirements of AWS 82.1, ASME Section
IX Welding and Brazing Qualifications, or other applicable qualification standard as
required by the AHJ?
Do you certify that the welding was conducted in compliance with a documented qr Yes ID No
quality control procedure to ensure that (1) all discs are retrieved; (2) that openings in
piping are smooth, that slag and other welding residue are removed; (3) the internal
diameters of piping are not penetrated; (4) completed welds are free from cracks,
incomplete fusion, surface porosity greater than 1/48 in. diameter, undercut deeper
than the lesser of 25% of the wall thickness or 1h2 in.; and (5) completed
circumferential butt weld reinforcement does not exceed Y32 in.?
Protection Association NFPA 13 (p. 2 of 3)
FIGURE 25.1 Continued
2013 Edition
SYSTEMS ACCEPTANCE
13-247
Cutouts
(discs)
Do you certify that you have a control feature to ensure that
all cutouts (discs) are retrieved?
ls3 res Q No
Hydraulic
data
nameplate
Nameplate provided
�r
r[ Yes d No
If no, explain
Sprinkler contractor removed all caps and straps? Yes ❑ No
Remarks
Date left in service with all control valves open
t p 3- 15
Signatures
Name ofsprinkler contractor
Ci 5 co }=rite s pe+>"KJe tzi ' PiC..
Tests witnessed by
The property owner or their authorized agent (signed) Title
Date
For spri. contractor (signed)
Ct'
T e
.V
Date
-3 --t
NFPA 13 (p. 3 of 3)
p
Additional explanati. and . •tes
® 2012 National Fire Protection Association
FIGURE 25.1 Continued
2013 Edition