Loading...
HomeMy WebLinkAbout10.28.21 Board Correspondence - FW_ New leachate Seeps at Neal Road Landfill From:Paulsen, Shaina To:Alpert, Bruce; Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Hironimus, Patrizia; Kimmelshue, Tod; Lucero, Debra; Paulsen, Shaina; Pickett, Andy; Reaster, Kayla; Ring, Brian; Ritter, Tami; Sweeney, Kathleen; Teeter, Doug; Valencia, Shyanne Cc:Pack, Joshua; Nuzum, Danielle Subject:Board Correspondence - FW: New leachate Seeps at Neal Road Landfill Date:Thursday, October 28, 2021 8:22:23 AM Attachments:10-26-21 NRRWF Seep notification Module 4.pdf Please see Board Correspondence below and attached. Shaina Paulsen Associate Clerk of The Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 From: hollylane nielsen <hollylane75@hotmail.com> Sent: Wednesday, October 27, 2021 7:27 PM To: Clerk of the Board <clerkoftheboard@buttecounty.net> Subject: New leachate Seeps at Neal Road Landfill ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening .. attachments, clicking on links, or replying. Dear Board of Supervisors, As you will see, you are being misled. Storm water runoff continues to be a significant problem at the NRRWF. This is why there are two pending lawsuits, and why COL will prevail. Please don’t waste anymore tax dollars on a futile legal battle. As a matter of principle, address the issue at hand. Thank you, Holly Nielsen Sent from my iPhone Begin forwarded message: From: hollylane nielsen <hollylane75@hotmail.com> Date: October 27, 2021 at 7:12:15 PM PDT To: Stephanie Young <stephanie.young@waterboards.ca.gov>, "Erin@Waterboards Garner" <Erin.Garner@waterboards.ca.gov> Cc: Will Carlon <wncarlon@packardlawoffices.com>, Andrew Packard <andrew@packardlawoffices.com> Subject: New leachate Seeps at Neal Road Hi Stephanie and Erin, FYI. Take a look at the photos and tell me that is only 1 gallon/minute as Eric Miller reports. What a joke. Holly https://geotracker.waterboards.ca.gov/getfile? filename=/regulators%2Fdeliverable_documents%2F7680714249%2F10-26- 21%20NRRWF%20Seep%20notification%20Module%204.pdf Sent from my iPhone NRRWF Module 4B Seep 10/26/21 On 10/26/21 at 10:00 AM, NRRWF staff telephoned and notified RWQCB staff a seep on the south slope of Module 4. Estimated flow rate was less than 1 gallon/minute at the time of observance. No leachate migrated off-site nor into drainages. Leachate collected onto the Module 5C wet weather deck. NRRWF crews cut an interceptor trench north of the wet weather pad to direct leachate downward. Additional repairs at the location of the seep will continue over the next week. Total rainfall between Friday night 10/22/21 and Sunday night 10/24/21 amounted to nearly 5 inches. NRRWF received nearly 7 inches of rain between 10/17/21 and 10/25/21. Photo 1. Vicinity location of Module 4 seep area above Module 5C wet weather pad (10/26/21). Photo 2. View uphill at seep (10/26/21). 1 NRRWF Module 4B Seep 10/26/21 Photo 3. View downhill of seep (10/26/21) Photo 4. Minor ponding of seep puddle on Module 5C wet weather pad (10/26/21) 2 NRRWF Module 4B Seep 10/26/21 Photo 5. Interceptor trench was cut about 3 feet and filled with drain rock to direct leachate flow downward (10/26/21). Photo 6. Seep repair area just north of wet weather pad, viewing west (10/26/21). Further repairs on the uphill slope will be conducted as the site continues drying. Photos taken by E. Miller, NRRWF (10/26/21) 3