HomeMy WebLinkAbout08.14.20 Paul Gosselin -6061 Paradise Drinking Water System Study Kickoff Call AT0
7/7/2020
4
he
of 300
,
1
Page
The upstream
Rev. 01/30/2019
ns.
through approximately 1
)
,
2034
-
Downstream of Paradise Dam, storage
Little Butte Creek conveys surface water
The District supplies the majority of t
Groundwater
.
A pump station was installed at the base of
876
-
290 residents
,
feet.
-
half mile north of the community of Magalia and
530-
being utilized because of a lack of storage. Due to
y one
ater
W
approximately 4
Storm
In 2007, a bypass pipeline was installed to provide gravity water to the
, Paradise Irrigation District,
feet, as the reservoir operating level has been reduced due to dam seismic
Assistance (TA) Work Plan
-
Wastewater
Options Study
the Community of Paradise (
feet of additional water rights that are not
District Manager-
Water
The PID has three water permits allowing diversion of water from Little Butte Creek: two storage
A
-ervoir to the treatment plant.
12806
Drinking-
ommunity of Paradiseommunity of Paradise
Proposition 1 Technical
D16December 20, 2019CKevin Phillips, kphillips@paradiseirrigation.com6061CJune 16, 2020
ded by two reservoirs impounded by the Paradise and Magalia Dams located north of Paradise.
serves drinking water to
(PID)
Storage is provi
System Contact
A
-
The District has approximately 6,000 acre
.
:
6061
PID currently relies predominately on surface water sourced from the Little Butte Creek watershed
residents using a gravity distribution system and storage facilities with a total capacity of approximately 9.5 million gallo
No.
he Paradise Irrigation District
TA Type:Grant Agreement No.:TA Start Date:TA Recipient(s):Community/System Contact:Additional Community/(if applicable):Work Plan Work Plan Title:Work Plan Submittal Date:
Work Plan No. Scope of Technical Assistance Water System Description and Compliance Issues:Tconnections.and storm runoff into the Paradise Reservoir and Magalia Reservoir; the latter
is located approximatelapproximately one mile north of the PID’s service area.rights and a direct flow right.reservoir, Paradise Lake, is the main storage facility with a storage capacity
of approximately 11,500 acrebehind the Magalia Dam is presently restricted to approximately 800 acrestability concernsthe reduced water level behind Magalia Dam, gravity feed to the
water treatment plant was no longer possible.Magalia Reservoir to pump raw water from the restreatment plant in addition to serving as an alternative source location if Magalia Reservoir
is contaminated. community’s
)
4
the
of
of the
2
/RFQ
system
business
(RFP
Page
.
Rev. 01/30/2019
d in the project.
community. Thus,
improvements to its
options
drinking water
for
, so these parties can be
Qualifications
its
ely involve
50 years) of operation and
-
outreach efforts, community
support redevelopment
for
options
stewardship
term
term (40
-
-
/Request for
operations unsustainable until recovery
as well as
fact sheets,
)
term sustainability of water supply for
s
-
(
obtain funding
nce, environmental permitting, environmental
lawsuit settlements, grants, or other
Study document.
project stakeholders and the
s
environmental
evaluate longup to consultant selection
the long
to
other
PID can
ons, collaboration with combining resources
consider the community as a whole as well as overarching
(Study)
and
to provide for
.
person consultant interviews and a transparent selection process.
-
e.g., rate increases, consultant tasks
cost, community accepta
options
provided
ew business lines, or
s
will be
evaluate
requirement to ensure that
term sustainability,
perform an Options Study
-
sustainability of the community’s water system
term
-
mandated
identify and
mmendations
Considers needs of other organizati
-
issuance, proposal reviews, in
tudy to
/RFQ
and reco
S
include upfront capital costs, as well as the present worth of long
is also a
,
public involvement. The effort will include a Communication Plan,
will
ensure the long
Temporary water rights transfer, sale of treated drinking water (wholesale approach), bottled water supply
Because of the high level of interest in this project from numerous stakeholders, it is critical to obtain the services
-
ize
Study
egislature. such as acquiring new customers, n
to
the community needs to
–
n Options
ch
media coordination.
This
A critical factor in the success of this project is coordinating with the
-
Obtaining funds to support long
/Multipurpose Benefits
pproach
and
A
–
Therefore,
advertisement, RFP
will then be rankedLegal consolidation, interagency agreement
include significant outreach and stakeholder development
Develop a
-
Evaluation criteria for each option includes feasibility,
–
pproach
will
California State L
A
/RFQ
Outreach
ptions
A
O
-sustainability.
tudy
Study
Continue with existing water system, with potential upgrades as needed and possible
S
–
egional
of options to evaluate should include, but not be limited to, the following:
6061
from the
Paradise.
R
the Camp Fire in November 2018, PID lost approximately 90% of its connections making continued
infrastructure and finances
Consolidation
The
website development
Community
Options
administrative hurdles, etc. Costs
–
-
Baseline Localized, Intermediate Local Broad Funding Augmentation revenue generating opportunities
categories
Work Plan No. As a result of and rebuilding is completed. water systemcommunity.potential for future improvements TA Scope of Work:The scope consists of the following two tasks: Task
1 community of impacts,maintenance costs. The Individual options will be identified for each option category, and then analyzed in a draft and final Option Task 2 community outreach
efforts will be performed throughout the project to ensure the public and project stakeholders are adequatThis will ensure transparency and maximmeetings, Work Plan Funding Phased
Approa of a qualified, objective consultant to perform the Study. Thus, it is proposed to complete a full Request for Proposalprocess, including RFPThe initial budget for this Work
Plan will be limited to OWP and Community Outreach
4
of
3
Page
Study
Rev. 01/30/2019
/1/20
–
/1/20/30/21
/15/20
9103/30/215
8
––
––
–
Due Date
RFP/RFQ
TA Work Plan
) Options
Complete
b
e amended to add in all
1a) –2a) Draft Final 2Draft Final 3a) Communications Plan 3b) Community Outreach MaterialsOngoing
staff
Randy MarxRandy Marx
applicable)
(also list consultants, if
Lead TA Provider
CSUS: CSUS: Consensus and Collaboration Program, College of Continuing Education, CSUS: Dave Ceppos
fact
and evaluate
Activities
olicit
S
the Options Study
.
stakeholder meetings,
this project.
.
:
to
.
and media coordination.
criteria, and provide a prioritized
schedule and budget
,
discussed above
Communication Plan
assistance related evaluation
ific
from team members
Prepare an RFP/RFQ document, to assist in the selection of a consultant to conduct Identify and provide descriptions of options from categoriesAfter approval by stakeholders of options
to evaluate, perform a feasibility analysis of each option.Perform a comparative analysis of the options, using specranking of options.Document findings in an Options Study Report.
Prepare Preform community outreach efforts, includingsheets, community meetings, website development
deliverables
Notes and Details Regarding Related
technical
,
Hold kickoff meeting to identify project needs and Work Plan scope. Prepare draft and final Work Plan, identifying project scopeproposals
more detail on project deliverables.
, as well as
A
-
Study
lan
P
Deliverable
6061
ork
Options
W
a)
Summary of Proposed Deliverables and Activities
b
1a) Technical Assistance (TA) 2a) RFP/RFQ 2 Community Outreach 3a) Communications Plan 3b) Community Outreach Materials
A.
123
Work Plan No. involved in the Study consultant selection process. After the Study consultant is selected by OWP, then this Work Plan will bsubsequent project costs Other TA Providers:No
other TA Providers are currently providing
4
of
4
Page
Rev. 01/30/2019
6/30/21
Any costs
parian
andy Marx
R
Grant Manager.
CSUS:
Requested
Total Amount
.
25,23657199,999
$ $ 0$ 0$ $ $ 125,806
1
State Water Board
2
/
20
SFY 20
16,37257179,999
$ $ 0$ 0$ $ $ 96,942
(CCR, Title 14, Article 18, Section 15262)
this work plan is consistent with one of the following CEQA exemptions:
up questions from the State
-
project deliverables.
are submitted through the
20
.
/ells, boreholes, etc. (CCR, Title 14, Article 19, Section 15306)
9
ultural resources areas, you must notify your GM of the nature and
deliverables
SFY 201
per State Fiscal Year (SFY) *
all
8,86420,000
$ $ 0$ 0$ 0$ $ 28,864
Provide oversight of TA team throughout the planning workEnsure that State Water Board’s Financial Assistance Application Submittal Tool (FAAST)Assist in responding to followWater Board
upon review of
irect costs, including fringe)
d
(
(>$5,000)
A
-
Budget Category
6061
PersonnelExpenses and SuppliesEquipmentTravel Professional and Consultant Services
Feasibility and planning studies with no ground disturbing activities
Also includes information collection via pilot studies, test w
Costs may be shifted between SFY’s and line items upon written approval from the
Estimated BudgetA.B.C.D.E.Total Costs
*exceeding the total amount requested will require an amendment to this work plan.
California Environmental Quality Act (CEQA) Certification
Please indicate if all the work you will implement in connection with If proposed work includes ground disturbing activities in an area(s) with a potential for environmental impacts,
including rihabitat, wetland, endangered species habitat or sensitive cscope of such work and receive approval prior to commencing ground disturbing activities.
Project Management
B.
4
Work Plan No.