HomeMy WebLinkAbout052-370-009 RFI22-0079 REVIEW REQUESTPROJECT NO. PROJECT NAME:
TOWN OF PARADISE
DEVELOPMENT SERVICES DEPARTMENT
DEVELOPMENT REVIEW REQUEST
TO:
FROM:
REQUEST:
DESCRIPTION OF PROJECT:
LOCATION
AP NOS.:
APPLICANT:
CONTACT PHONE:
DATE DISTRIBUTED:
RETURN DATE REQUESTED:
****************************************************************************************** DOES YOUR AGENCY HAVE THE CAPACITY TO SERVE THIS PROJECT?
NO (EXPLAIN BELOW) YES YES, WITH CONDITIONS
Signature Agency Date
J:/cdd/css/forms-bldg/dev svc project tracking sheet
DEVELOPMENT SERVICES PROJECT APPLICATIONS
I = Required for Issuance F = Required for Project Final na = Not applicable
I F na BUILDING I F na ENGINEERING
❑❑❑3 sets of construction plans ❑❑❑Encroachment permit (must be licensed and bonded)
❑❑❑Structural calculations (2 sets) ❑❑❑Grading permit
❑❑❑Title 24 energy calculations (2 sets) ❑❑❑Erosion control plan
❑❑❑Truss calculations (2 sets) ❑❑❑Onsite civil improvement plan
❑❑❑Special Permit Zone certification letter (flood zone) ❑❑❑Engineered site plan
❑❑❑Fire sprinkler system plans (2 sets) ❑❑❑Stormwater Post Construction Plan (Regulated / Small)
❑❑❑Hydrant fire flow (@ Station #81) ❑❑❑Erosion & Sediment Control Plan
❑❑❑Grant deed and legal description ❑❑❑Lot merger application ($645.46 deposit)
❑❑❑Development Impact Fees ❑❑❑Lot line adjustment application ($1,129.55 deposit)
❑❑❑PUSD Impact Fees ❑❑❑Covenant agreement (deferral of frontage improvements)
❑❑❑PRPD Impact Fees ❑❑❑Dedication of right-of-way
❑❑❑PID water service clearance ❑❑❑Parking within street setback review ($322.73)
❑❑❑Butte County Environmental Health clearance I F na PLANNING
❑❑❑Construction & Demolition Recycling Plan ❑❑❑Design review (sign / architectural)
❑❑❑Plans on CD ❑❑❑Entitlement (Admin permit/Site Plan Rev/Cond. Use Pmt)
I F na ONSITE SANITATION ❑❑❑Tree removal permit
❑❑❑Land Use Review (minor/major) ❑❑❑Tree hearing (5-30 minor, 31+ major)
❑❑❑New construction permit ❑❑❑Landscape plan ($318.20)
❑❑❑Building clearance (minor/major) ❑❑❑Tree preservation/protection plan ($106.07)
❑❑❑Upgrade/Alteration permit ❑❑❑Offsite parking review ($176.07)
❑❑❑Repair permit – check if electrical is required ❑❑❑Address assignment
❑❑❑Wastewater easement/covenant ❑❑❑
CONDITIONS PRIOR TO ISSUANCE:
CONDITIONS PRIOR TO PERMIT FINAL: