HomeMy WebLinkAbout22-013RESOL11TIOF11r•* • r OOC& GRATUrBFEDERAL ArRr.Rr
COMPLIANCE POLICY
WHEREAS, Construction projects funded with CDBG funds require that Butte County Administration follow
certain procedures to comply fully with applicable federal and state requirements.
WHEREAS, Butte County Administration hereby adopts and implements the requirements in the California
Department of Housing and Community Development's Grants Administration Manual Chapter 7, Published July 2021
and attached as Exhibit A: Labor Standards, including determining applicability, incorporating prevailing wage
requirements into Bidding and Contracting Documents, assuring Contractor Compliance through Reporting & Employee
Interviews, corrective actions if necessary, recordkeepi'ng and' reports; and
WHEREAS, Butte County Administration assigns Economic & Community Development staff and other County
Administration staff as needed to administer and enforce federal and State requirements with contractors and
subrecipients, and
WHEREAS, Butte County Department of General Services retains and assigns the Labor Standards Compliance
Officer to maintain labor standard oversight; and
AUC>W, THEREFORE, BE IT RESOLVED that the Butte County (Board of Supervisors hereby adopt the CDBG Federal
Labor Standard's Compliance Policy
vote
PASSED AND ADOPTED by the Butte County Board of Supervisors this Stn day of February, 2022, by the following
AYES: Supervisors Lucero, Ritter, Kimmelshue, Teeter and Chair Connelly
NOES: None
"; one
NOT rnNone
Bill Connelly, Chair
Butte County Board of Supervisors
I, Andy Pickett, Chief Administrative Officer and Clerk of the Board of Supervisors for Butte County, State of
California, hereby certify the above and foregoing to be a full, true and correct copy of a resolution adopted by
said Board of Supervisors on the 8th day of February, 2022.
Andy Pickett, Chief Administrative Officer and Clerk of the (Board of Supervisors
for Butte County, State of California
Chapter is Labor Standards
1011,1271
Construction projects funded with CDBG require that certain procedures be followed in order to comply fully
with applicable federal and state requirements. For example, federal labor standards require recipients and
contractors to meet and document compliance with certain rules associated with the employment and
wages of workers on construction projects.
This chapter describes the policies and procedures that must be followed when undertaking construction
projects with CDBG funds, including bid preparation, compliance with labor standards, pre -construction
meetings, on-site interviews, and approval procedures. This chapter overlaps significantly with Chapter 5:
Procurement and slightly with Chapter 4:: Grantee Reguirements, (for equal opportunity).
Essentially, the Labor Standards requirements, consist of the following elements. -
0 Determining Applicability
0 Incorporating Required Wage Rates into Bidding and Contracting Documents
e Assuring Contractor Compliance through Reporting & Employee Interviews
0 Corrective Actions (if necessary)
0 Recordkeeping & Reports
MIMM" M
The grantee is responsible for obtaining wage determinations (also called "wage decisions"), verifying
contractor and subcontractor eligibility, conducting pre-bid and pre -construction conferences, verifying all
federal contract provisions are in contracts, obtaining all required documentation, reviewing weekly Certified
Payroll Reports, conducting site visits for employee interviews, monitoring project compliance, and
maintaining appropriate files. Once a construction project becomes subject to federal Labor Standards
Provisions (see Section 7.3, of this chapter), the steps outlined in this chapter must be taken to ensure
compliance. The grantee should designate a specific staff person, usually the local grant administrator, to
serve as the Labor Standards Officer who will be responsible for ensuring compliance with Labor Standards
Provisions. (This chapter refers to the Labor Standards Officer but these duties maybe completed by other
local staff of the grantee, sub -recipient, or a consultant.)
Even if the project is not subject to federal Labor Standards provisions, there are Equal Employment
Opportunity provisions that must be imposed for such construction contracts — typically smaller housing
projects of less than eight units.
Published July 2021
Chapter 7: Labor Standards
The first step in effective management of CDBG-funded construction projects is the preparation of a bid
package. This requires the writing of the technical bid specification - usually by an architect or engineer on
the basis of prepared plans or working drawings. These specifications must provide a clear and accurate
description of technical requirements for materials and products and/or services to be provided in the
contract. Please refer to Chapter 5: Procurement for more guidance on bidding.
During this phase, the engineer/architect should be preparing construction documents, and, for
infrastructure projects, the grantee should secure the approval/permits of applicable state agencies. While
the engineer/architect prepares the technical specifications, the grantee must assess the applicability of
Labor Standards and obtain the necessary wage determinations, including the Wage Determination Lock -
In Notice (see Section 7,3 of this chapter). If the project is subject to labor standards, the bidding package
must contain information about required wage rates and labor standards for the project (see Section 7.4 of
this chapter).
NOTE The environmental review must be completed and, if applicable, release of funds obtained prior to
publishing the bid advertisement. Please refer to Chapter 3: Environmental Review for more
information.
Section 7.3 Assess the ApplicabHity of Labor Standards
Provisions,
Most construction projects including alteration, repair or demolition, funded in whole or in part with federal
dollars, must comply with federal Labor Standards Provisions, Applicable laws include the following:
The Davis -Bacon Act requires that workers receive no less than
the prevailing wages being paid for similar work in the same
locality. The CDBG regulations apply this, Act to construction,
alteration, or repair work of more than $2,000 that is financed in
whole or in part with CDBG! or other federal funds, regardless of
the CDBG amount. See (Section 7.10 of this chapter for
clarification regarding construction versus installation in
determining wage rate requirements.)
The Copeland Anti -Kickback Act requires that workers be paid
weekly, that deductions from their pay be permissible, and that
contractors keep and submit weekly payrolls and Statements of
Compliance.
Davis -Bacon Act40 USC,
Chapter 3,
Section 276a-276@-5
Copeland Anti -Kickback Act
40 USC, Chanter 3,
Section 276c
and
18 USC, Part 1,. Chapter 41,
Section 874
Published July 2021
Chapter 7. 1,M)or Standiirds
The Contract Work Hours and Safety Standards Act requires that workers receive overtime
compensation for hours they have worked in excess of 40 hours
in one week. This Act applies to all CDBG-assisted construction Contract Work Hours and
contracts of $100,000 or more. The Act also imposes a financial Safety Standards Act:
penalty for failure to pay such overtime wages and requires 40 USC Section 3701-3707
overtime for traditionally exempt salaried construction: workers. and
(NOTE: Overtime is required for ALL workers via the Fair Labor 24 CFR Part 5
Standards Act including projects without federal funds.)
Tip: HUD has two guides and a handbook that are available for
downloading on labor standards requirements. These documents
are "Making Davis Bacon Work,- A Practical Guide for States, Indian
Tribes and Local Agencies" and "Davis Bacon Labor Standards: A
Contractor's Guide to Prevailing Wage Requirements for Federally -
Assisted Construction Projects." HUD, Handbook 1344.1 also
provides detailed guidance on labor standards requirements. HUD
also provides finks on its website to many forms and instructions
used in labor standards administration.
Making Davis Bacon Work
Guide for States
Davis Bacon Labor Standards:
Contractor's Guide
HUD's Davis -Bacon Forms and
Instructions
HUD Handbook 1344.1
There are certain exceptions to the Davis -Bacon and Copeland Anti -Kickback Acts. These acts do not apply
to:
a Construction contracts at or below $2,000. Note that arbitrarily separating a project into contracts
below $2,000 in order to circumvent the requirements is not permitted.
0 Rehabilitation or new construction of residential properties containing less than eight units with
CD13G, funds. (NOTE: The HOME Program exempts projects of less than 12 units.)
Non -construction related activities will not cause Davis -Bacon to apply to the whole project. These
are activities such as real property acquisition, procurement of furnishings, architectural and
engineering fees, procurement of modular (industrialized) and manufactured housing components,
and certain pieces of equipment that would not become permanently affixed to the real property.
See Installation Work in Section 7.10 below.
0 Contracts solely for demolition, when no construction is anticipated on the site.
0 Force account labor (construction carried out by municipal employees or, in certain instances, a
sub -recipient's empioyees),
e Volunteers. However, volunteering for part of the project and working part of the project is
prohibited.
HCD should, be contacted if there is any situation where Davis -Bacon applicability is in question.
Published July 202 1
Chapter 7: Labor Standards
A grantee or the grant administrator must be sure to include all applicable labor standards, equal
opportunity, and other language in the bid specifications and contract documents, in addition to verifying
contractor/subcontractor eligibility (as described in Chapter 5: Procurement). The grantee is responsible for
obtaining all required documentation, monitoring project compliance, and maintaining appropriate files,
lii ill lifillill Fill ilill i I 111 i
Once a construction project becomes subject to federal labor standards provisions, the following steps must
be taken to ensure compliance. The Labor Standards Officer typically takes responsibility for these steps.
The grantee should access the federal wage rate decisions through the Internet at www.wdol.gov. Note
that federal wage determinations are issued for four categories: Building, Residential, Heavy, and Highway.
When evaluating the type of wage determination to request, it is important to understand the differences to
avoid paying wages from an inappropriate determination.
building construction generally includes construction of sheltered enclosures with walk-in access for the
purpose of housing persons, machinery, equipment or supplies; all construction of such structures'. the
installation of utilities and of equipment, both above and below grade levels; as well as incidental grading,
utilities and paving. Such structures need not be "habitable" to be building construction. Also, the installation
of heavy machinery and/or equipment does not generally change the project's character as a building.
Residential projects involve the construction, alteration or repair of single-family houses or apartment
buildings no more than four stories tall. This includes all incidental items such as site work, parking areas,
utilities, streets, and sidewalks,
FIL1011111tafts KIMM I liran mag"Z.BiLd.3 E�ffln
rAWKOW
r,, W00
of the lowest floor does not meet this definition, contact HCD for assistance in determining its
classification.
Highway projects include construction, alteration or repair of roads,, streets, highways, runways, taxiways,
alleys, trails, paths, parking areas, and other similar projects not incidental to building or heavy construction
Heavy construction includes those projects that are not properly classified as either "building," "highway,"
or "residential." Unlike these classifications, heavy construction is not a homogenous classification.
Because of this catch-all nature, projects within the heavy classification may sometimes be distinguished
on the basis of their particular project characteristics, and separate schedules may be issued for dredging
projects, water and sewer line projects, darns, major bridges, and flood control projects.
HCD staff should be consulted if there are questions about properly identifying the type of construction on
the project and the wage determination necessary, including those instances where the grantee is required
to request "multiple" wage determinations from the Department of Labor. Multiple wage determinations
Published July 2021
Chapter 7: Labor Standards
may be required when the project contains separate and distinguishable components that fall into different
categories of construction, for example a large mixed-use project.
If the website does not contain a wage decision applicable for your project, the DOL Request for Wage
grantee should submit a Request for Wage Determination Form to DOL. Determination Form I
The wage rate decision must be a part of the bid package. The bid package must contain the labor
standards requirements, which are summarized below and can be found in HUD, Form 4010.
0 Davis -Bacon provisions;
Federall Labor Standards
Contract Work Hours and Safety Standards clause; Provisions (HUD 4010)
e Copeland Anti -Kickback clause;
0 Employment of Apprentices/Trainee clause;
0 Equal Employment Opportunity requirements.
Caution: if the grantee fails to include the correct wage rate determination (s), the grantee will be
responsible for paying any difference between the applicable wage, rates and the wages paid by the
contractor based upon the information provided in the bid package. The grantee's financial obligation for
such restitution is specified in federal regulations.
UTI
Once the bid document is prepared, it is time to advertise for construction bids. Refer to Chapter 5:
Procurement for specific instructions on how to proceed with the bidding process.
RI� ZI I
.s .•- W! III I I,
Because the U.S. Department of Labor (DOL) continually monitors the economic conditions of the
construction contracting profession, the wage rates are subject to change. It is essential that the grantee
verify that the most current rates are being utilized. The Davis -Bacon Wage Determination that is in effect
no more than 6 days prior to the bid opening is the wage decision that must be used for all construction
related activities on that federally funded project. Therefore, the following actions must be taken:
1. The federal Department of Labor does not require modification of wage rates for any updated
wage determination issued when there is insufficient time to notify potential bidders. HCD has
determined that it will not require modifications of wage rates updated less than 10 days prior to
bid opening. Therefore, the grantee must obtain the wage decision no earlier than 6 days prior
and provide it to the project architect or engineer to be forwarded to all prospective bidders.
Published July 20,21
0 Chapter 7: Labor Standards
2. The Labor Standards Officer must maintain documentation of the Appendix 7-1: Wage
wage decisions at lock -in date. The Wage Determination Lock -In Determination Lock -in
Notice should be used for documentation and reporting to HOD Notice
(see Appendix 7-1).
Wage Determinations are only effective for 90 calendar days after the bid opening. On the 91 st
day, the previously issued determination expires. If the contract is not awarded within 90 calendar
days of the bid opening, the wage decision that is in effect on the date that the construction
contract is signed is the decision that will be utilized for the entire project. The Labor Standards
Officer must obtain an updated wage determination and notify the contractor and engineer or
architect of the new wage decision that is applicable to the project. The Labor Standards Officer
must maintain record of the new lock -in decision, revising the Wage Determination Lock -In Notice
if that procedure is used by the grantee.
4. The construction contract must contain the final ("'locked in") wage decision and labor standards
clauses required by DOL (HUD Form 4010).
Before any work is performed by a contractor, HCD requires that the grantee, the grant administrator, the
engineer or architect, and any other technical advisors to the grantee conduct a pre -construction conference
with the contractor, and any identified subcontractors, to explain contractual requirements and performance
schedules.
The grantee should prepare an agenda, and plan to utilize and distribute a
pre -construction checklist as a guide to ensure that all areas are properly Appendix 7-2:
addressed. (See Appendix 7-2: Sample Pre -construction Conference Sample Pre -Construction
Checklist.) A tape recorder may be used to record the meeting and/or a Conference Checklist
stenographer may be asked to prepare notes. The grantee should clearly
present the federal statutory compliance requirements as well as performance expectations. A copy of the
minutes should be signed by all parties to the contract and placed in the files.
Items that should be covered!, at the pre -construction conference include, but are not limited to:
Explain to the contractors, their responsibilities with respect to labor standards and equal
opportunity requirements as well as the technical job requirements.
0 Obtain the contractor's Federal Identification Number and Data Universal Numbering System
(DUNS) number that is registered in the System for Award Management (SAM).
Explain that the contractor must submit weekly payrolls and DOL Payroll Form &
statements of compliance signed by an officer of the company or Statement of Compliance
person authorized by owner/officer, and that the prime contractor is (WH 34
responsible for securing, checking, and reviewing payrolls and
Published July 2021
Chapter 7- Labor Standards
Statements of Compliance from all subcontractors.
a Explain that wages paid must conform to those included in the wage
rate decision included in the contract. Discuss the classifications to Report ofAdditional
be used. If additional classifications are needed, contractors can Classification and Rate (HDU
request them using HUD Form 4230-A. However, the grantee must Form 4230-A)
submit the form to the U.S. Department of Labor at whd-
cbaconformance incoming(a),doI.,gov,
® Explain that employee interviews will be conducted during the project.
Emphasize that both a copy of the wage rate decision and the wage Required Davis Bacon
rate poster "Employee Rights under the Davis Bacon Act" must be Contragfing Poster
posted in clear view of all employees at the job site.
Explain that apprentice or trainee rates cannot be paid unless the apprentice or training program is
registered and approved by the U.S. Department of Labor. In California, the state Department of
Industrial Relations, Division of Apprenticeship Standards (DAS) and the California Apprenticeship
Council (CAC) administer the registration of apprenticeship programs. If apprentices or trainees
are to be used, the contractor must provide the grantee with a copy of the state registration of
his/her apprentice program and a copy of the apprentice card for the worker.
Foremen or supervisors that regularly spend more than 20% of their time performing construction
work must be paid at least the hourly rate of any job that they perform.
If the contract is $100,000 or greater, explain that workers must be paid overtime if they work more
than 40 hours in one week, including otherwise exempt salaried construction workers. Only a
waiver from the Secretary of Labor can override the Contract Work Hours and Safety Standards
Law.
Indicate that failure to pay workers at least time and a half whenever CWHSS Liquidated
overtime occurs violates the Contract Work Hours and Safety Damages Penalty
Standards law (more than 40 hours per week) and makes the
contractor liable for not only restitution but also liquidated damages of
$27 per day for every day each worker exceeded 40 hours a week without being paid time and a
half. (The $27 penalty amount is applicable as of January 16, 2021 and adjusts annually. See web
link for current liquidated damages amount.)
Explain that no payroll deductions can be made that are not specifically listed in the Copeland Anti -
kickback Act provisions as, permissible payroll deductions. In addition, some of the permissible
deductions require written permission of the employee. An unidentified payroll deduction is a
method used by unethical contractors to get their workers to "kickback" a portion of their pay. This
is a particularly common problem in times of high unemployment and in areas of minority
concentrations. Unspecified payroll deductions are aserious discrepancy and should be resolved
prior to further contractor payments.
Explain debarment proceedings relative to violation of labor standards and equal opportunity
Published July 2021
Chapter 7: Labor Standards
requirements. Obtain any outstanding documents including Contractor/Subcontractor Eligibility
Certifications Regarding Debarment, Suspension and Other Responsibilities.
Provide contractor with posters for the site, including
"Employee Rights under the Davis Bacon Act," as well as other Other DOL Reguired Posters
worksite posters such as "'Notice to All Employees Working on CA Department of Industrial
Federal or Federally Financed Construction Projects," "Safety Relations WorkpIace Postings
and Health Protection on the Job," and "Equal Employment
Opportunity is the Law." These posters are available via the Cal/OSHA Posters
DOL website. The website also contains a feature called DOL FrstStep PosterAdvWsor
"FirstStep Poster Advisor" that will help employers determine
all posters that they are required to display at their business.
Posters, available in English and other languages, may be downloaded free of charge and printed
directly from the DOL website.
0 Inform the contractor that it is his/her responsibility to employ only eligible subcontractors who have
certified eligibility in a written subcontract containing federal labor standards and equal opportunity
provisions.
Provide handouts explaining everything covered and obtain the contractor's signature to document
receipt in Pre -Construction Meeting Checklist (see Appendix 7-2 above).
The grantee should also describe the compliance review that will be conducted during the project
and indicate that discrepancies and underpayments discovered as a result of compliance review
must be resolved prior to making further payment to the contractor. Remind the contractor that
labor standards provisions are as legally binding as the technical specifications, and failure to pay
specified wages will result in contractor payments being withheld until all such discrepancies are
resolved.
IIIII 11111rill Iii, 11!1111111�
Once construction is underway, the general contractor must obtain weekly payrolls (including signed
Statements of Compliance) from all subcontractors as they work on the project. The payrolls must be
reviewed by the general contractor to ensure that there are, no discrepancies or underpayments. Remember
that the prime contractor is responsible for the full compliance of all subcontractors on the project and will
be held accountable for any wage restitution that may be found. This includes underpayments and
potentially liquidated damages that may be assessed for overtime violations.
NOTE: A construction manager that executes the contracts with other construction firms is considered a
general contractor. The references in this chapter to general contractor include such construction
managers or construction management firms. These construction managers have the same, responsibilities
to comply with labor standards as a general contractor.
Published July 2021
Chapter 7: Labor Standards
Grantees must obtain copies of all general contractor and subcontractor weekly
payrolls (accompanied by the Statements of Compliance that include Payroll Falsification
completed statements of how fringe benefits will be paid), and review them to, Indicators
ensure that there are no discrepancies or underpayments in accordance with
HUD guidelines. See Payroll Falsification Indicators from the HUD Guidebook,
Making Davis Bacon Work, for guidance on detecting falsification through frequent payroll review and
interview comparison. If contractor/subcontractors use an approved apprentice or training program, verify
that the ratio between trade journeymen and apprentices complies with the approved apprenticeship
program.
Certified Payroll Reports must be submitted by the contractor to the grantee
within seven to eleven working days of the end of the payroll period. A Payroll DOL Payroll Form &
Form and Statement of Compliance is provided can be found on the DOL Statement of Compliance
website. This form is also commonly called a Certified! Payroll Report (CPR). (WH 347)
Note that an empllo,yee's full social security number and address are not to be
included on these Certified Payroll Reports. Instead, an alternative individual
identity number should be used, such as the last four digits of the employee's social security number or an
employee ID. This form does not have to be used, but alternative payroll documentation must include all of
the same elements in order to determine compliance with applicable regulations. A Statement of
Compliance must accompany each payroll submission.
Payroll reports must be reviewed by the grantee upon receipt so that any necessary corrective action can
be initiated before the problem multiplies. Payroll forms must be initialed by the grantee to indicate that they
have been reviewed.
In addition to the falsification indicators described in the HUD guidance, items to be spot-checked should
include:
a The correct classification of workers;
A comparison between the classification and the wage determination to determine whether the rate
of pay is at least equal to the rate required by the determination;
A review to ensure that work by an employee in excess of 40 hours per week is being compensated
for at rates not less than one and one-half times the basic rate of pay;
a, Review of deductions for any non -permissible deductions; and
The Statement of Compliance (part of the weekly Certified Payroll Report form in Appendix 7-7)
has been completed and signed by the owner or an officer of the firm.
HUD Handbook 1344.1 is a good resource for labor standards HUD Handbook 1344.1
information.
Published July 2021
Chapter 7. Labor Standards
Any discrepancies and/or willful falsification indicators resulting in underpayments of less than $1,000
should be addressed by the grantee. Where underpayments of wages have occurred, the grantee is
responsible to make sure the correct wages are paid and that the employer will be required to pay wage
restitution to the affected employees. Wage restitution must be paid promptly in the full amounts due, less
permissible and authorized deductions. As part of this process the grantee must request that the employer
submit a Correction Certified Payroll Report (Form 347) showing the restitution and a signed restitution
form. Whenever an employer is found to have underpaid its employees by $1,000 or more or committed
willful falsification, grantees should contact HCD staff for assistance, See Taking Corrective Actions and
Wage Restitution in Section 7.7 Labor Standards Compliance Requirements.
The contractor and subcontractor(s) must number and date each Certified Payroll Report. The first week in
which work is performed, the Certified Payroll Report must be marked 'Initial' or 1 and the last payroll report
must be marked 'FinaI'. Contractor(s) and subcontractor(s) are required to submit a Certified Payroll Report
for each consecutive week from the Initial Report to the Final Report. 'No work' Certified Payroll Reports
must be submitted whenever there is a temporary break in the work on the project. If a contractor completes
a portion of the work identified in his contract and is required to be off the job site for a period of time while
project construction continues to the point where he can complete the remainder of the work identified in
his contract, this contractor may submit a written statement to the grantee, signed by the owner or officer
of the company that no work will be performed on the job site from Month, Day, and Year to Month, Day
and Year. When this statement is received, the contractor is not required to submit weekly Certified Payroll
Reports until their work on the project resumes.
All Certified Payroll Reports must have an original signature by the owner, or an owner designated
representative. DOL has authorized the acceptance of certified electronic signatures. Please contact HCD
for further guidance if you have contractors that wish to utilize electronic signatures.
Caution: Owner -operators of power equipment, like self-employed mechanics, may not submit their own
payrolls certifying to the payment of their own wages but must instead be included on the responsible
contractor's Certified Payroll Report.
Fringe Benefits listed on the applicable wage determination must be paid to the employee or for the
employee for every hour worked on the federafly assisted project. Those benefits may be provided to the
employee in the form of a fringe benefit package or the cash equivalent of the fringe benefits due may be
added to the amount of the base wage with the totall amount due reflected in the hourly rate column on the
Certified Payroll Report.
Paragraph (a) or (b) on the Statement of Compliance must be marked on every Certified Payroll Report to
indicate the method by which fringe benefits will be paid. If the fringe benefits are being paid to a bona fide
fringe benefit plan, the grantee must obtain verification from the contractors or subcontractors of the
calculation of benefits paid and proof of plan validity. Bona fide fringe benefit plans are identified at 29
CFR4.171. Examples include but are not limited to:
1. Health, life or other similar insurance premiums paid by the employer. Documentation
Published July 2021
Chapter 7: Labor Standards
includes:
a. Most recent insurance statement with a breakdown of each covered employee's premium,
and
b. A signed letter by an officer of the company that states how much of the premium they
cover (percentage or dollar amount).
2. Pension or retirement contributions recognized by the Internal Revenue Service (IRS) and
contributed by the employer. Documentation includes
a. Letter from Pension Provider stating which employees participate in the program,
b. Signed letter by an officer of the company that states what percentage of contributions they
match, or if it is automatically given to the employee even if they do not contribute, and
c. Monthly statements throughout the project that show how mulch the employee contributed
and how much the employer contributed.
3. Holiday and/or vacation pay contributed by the employer. Documentation includes:
a. Copy of Employee Handbook that states the number of paid vacation and holidays
provided to employees and
b. Copy of employer's calculations for the amount of fringe benefit credit claimed for vacation
and holiday pay listed by employee.
4. Union (Fringe Benefit Packages. Documentation includes:
a. Copy of the Union Benefits Breakdown provided by each specific Union to the contractor,
and
b. Monthly statement listing covered employees and verifying payment to the plan.
Fringe benefits do not include employer payments or contributions required by other federal, state, or local
laws, such as the employer's contribution to Social Security or Workmen's Compensation. The grantee
must verify that the base rate plus fringe benefit amount paid to each employee is equal to or greater than
the amount stated in the wage determination assigned to the project. To determine the hourly amount of
fringe benefits being paid by the contractor for the employee, the annual amount paid must be divided by
2080 hours.
�I g 1 127 11 1 ME! 111 11111111 111
190", M I
During construction, the grantee is responsible for monitoring the labor
standards and equal opportunity requirements described in this chapter. I HUD's Davis -Bacon Forms
This role for the Labor Standards Officer may be fulfilled by the
archftect/engineer or grantee, and if so, should be included in: the scope of services for that professional
services contract.
PUblished July 2021
Chapter 7; Labor Standards
•
R ff MIT am
Construction management requirements include conducting job site Record of Employee Interview
interviews with workers using Record of Employee Interview Form (HUD (HUD Form 11)
Form 11). HUD's website provides links to many of HUD's Davis -Bacon
Forms.
The grantee should use on-site interviews as a proactive enforcement tool rather than as a means to meet
a "representative sampling" quota. Instead of conducting interviews randomly for the sake of assembling a
sample, the Labor Standards Officer is encouraged to target interviews to groups of workers where
violations are suspected or alleged, being especially attentive to Payroll Falsification Indicators. The
targeting approach is a more efficient and effective means of utilizing on-site interview resources. The Labor
Standards Officer must also ensure that a sufficient sampling of all trades inciuded in the project are
interviewed.
The grantee should ensure the following actions are performed:
0 Interviews are conducted periodically during each phase of construction on each project.
Payrolls should be used to verify data obtained during on-site interviews. Check to see that
employees are being paid the amounts specified in the wage determination, the amount shown on
the payrolls, and the hours shown on the payrolls. Include hours of the supervisor.
0 Identification and correction of any discrepancies between on-site interviews, payrolls, and wage
rates.
0 A fully completed and signed Record of Employee Interview form is maintained in the contract file,
M1029MMIJUSTIM
The following guidelines should be observed by persons conducting job site interviews:
e The interview should take place on the job site if it can be conducted properly and privately (this is
a one-on-one process). If there is reason to suspect fallsification or intimidation, the employee
interview can be conducted by mail.
e The interviewer should see that the wage determination and other required posters are properly
displayed.
e The interviewer should observe the duties of workers before initiating interviews. Employees of
both the prime and subcontractors should be interviewed.
o This should be posted adjacent to the wage determination and other required posters on the job
Published July 2021
Chapter 7: Labor Standards
site at a location readily accessible to workers.
To initiate the interview, the authorized person shall:
0 Properly identify himself/herself;
0 Clearly state the purpose of interview-, and
Advise the worker that information: given is confidential, and his/her identity will be disclosed to the
employer only with the employee's written permission.
A grantee may need to seek language assistance to interview non-English
speaking workers or may seek to gather information using the Labor Labor Standards
Standards Questionnaire, HUD Form 4730, either in person or requesting Questionnaire Form (HUD
it back by mail. The results from the questionnaire must be transferred to a Form 4730)
Record of Employee interview, HUD Form 11, When conducting employee
interviews, the interviewer should pay particular attention to: Record of Employee, Interview
Form (H U D Form 11
9 The employee's full name.
0 The employee's permanent mailing address.
e The last date the employee worked on that project and number of hours worked on that day.
a The interviewer should make it clear that these questions relate solely to work on the project and
no other work,
o The employee's hourly rate of pay. The aim is to determine if the worker is being paid at least the
minimum required by the wage determination.
The interviewer should be sure the worker is not quoting their net hourly rate or "take-home" pay. if it
appears the individual may be underpaid, the, interviewer should closely question the worker:
®, Ask for any records.
& Arrange to re -interview the employee.
* Enter the worker's statement of his/her classification.
a Observe duties and tools used:
c Enter any comments necessary.
o Enter date interview took place.
Published July 20211
C'hapter 7. Labor Standards
If the interviewer senses that the employee is reluctant to offer honest answers or appears to be under
pressure from the employer about answering questions on the job site, the interviewer can provide or mail
a questionnaire to gather information needed.
The payroll examiner must compare information on the Record of Employee Interview form with the
Certified Payroll Report submission: If no discrepancies appear, "None" should be written in the comment
space of the Record of Employee Interview form. If discrepancies do appear, appropriate action should be
initiated. When necessary action has been completed, the results must be noted on the interview form.
Where underpayments of wages have occurred, the employer will be required to pay wage restitution to
the affected employees. Wage restitution must be paid promptly in the full amounts due, less permissible
and authorized deductions. All wages paid to laborers and mechanics for work performed on the project
including wage restitution, must be reported on a Certified Payroll Report. Whenever an employer is found
to have underpaid its employees by $1,000 or more or committed willful falsification, grantees should
contact HCD staff for assistance.
Notification to the Prime Contractor
The Labor Standards Officer will notify the prime contractor in writing of any underpayments that are found
during payroll or other reviews. The notice will describe the underpayments and provide instructions for
computing and documenting the restitution to be paid. The prime contractor is allowed 30 days to correct
the underpayments. If wage violations are not corrected within 30 days after notification to the prime
contractor, the grantee may withhold payment due to the contractor of an amount necessary to ensure the
full payment of restitution. Note that the prime contractor is responsible to the Labor Standards Officer for
ensuring that restitution: is paid. If the employer is a subcontractor, the subcontractor will usually make the
computations and restitution payments and furnish the required documentation through the prime
contractor.
Computing Wage Restitution
Wage restitution is simply the difference between the wage rate paid to each affected employee and the
wage rate required on the wage determination for all hours worked where underpayments occurred. The
difference in the wage rates is called the adjustment rate. The adjustment rate times the number of hours
involved equals the gross amount of restitution due.
Correction Certified Payroll Reports
The employer will be required to report the restitution paid on a Correction Certified Payroll Report, The
correction payroll will reflect the period of time for which restitution is due (for example, Payrolls #1 through
#6, or payrolls for a specified beginning date through a specified ending date). The Correction Certified
Payroll Report will list:
Published July 202 1
Chapter 7: Labor Standards
* Each employee to whom restitution is due and their work classification,
as The total number of work hours,
0, The adjustment wage rate (the difference between the required wage rate and the wage rate paid),
®, The gross amount of restitution due,
0 Deductions,..and
0 The net amount to be paid.
A property signed Statement of Compliance must be attached to the Correction Certified Payroll Report
Pay and Document Restitution Wages
The employer should pay and document payment of restitution wages. Appendix 7-3: Restitution
Appendix 7-3 contains instructions on paying restitution wages and an affidavit Wages & Affidavit
to be signed by workers receiving restitution wages.
Review of Correction Certified Payroll Report
The LSO or contractor administrator will review the Correction Certified Payroll Report to ensure that full
restitution was paid. The prime contractor shall be notified in writing of any discrepancies and will be
required to make additional payments, if needed. Additional payments must be documented on a
supplemental Correction Certified Payroll Report within 30 days.
Sometimes, wage restitution cannot be paid to an affected employee because the employee has moved or
otherwise cannot be located. After wage restitution has been paid to all of the workers who could be located,
the employer must submit a list of any workers who could not be found and paid including name, employee
identification number, last known address and the gross amount due. At the end of the project, the prime
contractor will be required to establish a deposit or escrow account in an amount equal to the total amount
of restitution that could not be paid. The grantee must continue to attempt to locate the unfound employee(s)
for three years after completion of the project. After three years, any amount remaining in the account must
be credited and/or forwarded to HUD. Grantees should contact HCD for repayment instructions.
MEM39=
The U.S. Department of Labor regulations require all agencies administering labor standards to submit two
reports. HCD coordinates the submission of those reports for CDBG grantees.
Published July 2021
Chapter 7: Labor Standards
R IN
Section 57 Enforcement Report DOL requires a report regarding all Section 5.7
enforcement actions where underpayments by a contractor or Enforcement Report
subcontractor occurred in excess of $1,000 or where there is reason
to believe that the violations were willful. Grantees, generally the LR -92-02
LSO, must prepare and submit such reports called Section 5.7
Enforcement Reports to HCD to then be forwarded to HUD. The Section 5.7 Enforcement Report
should be submitted after completing an investigation and after final disposition is reached at the
local level. HUD has provided guidance, on completing the report in Letter Number LR -92-02.
Semi -Annual Labor Standards Enforcement Report: All enforcement
Sema -Annual Labor
activities, including any activities described in a Section 5.7 Standards
Enforcement Report AND enforcement activities that did not reach Enforcement Report (HUD
the threshold requiring a Section 5.7 Enforcement Report are listed Form 47101
and summarized in the semi-annual report. This report also lists all
contracts that were issued during the six-month reporting period that
are subject to Davis -Bacon wage decisions. This semi-annual report is sent to HCD.
Labor standards reporting requirements are also referenced in Chapter 12: Reporting and Recordkeeping.
As mentioned previously, failure to pay workers at least time and a half
whenever overtime violates the Contract Work Hours and Safety Standards CWHSS Liquidated
Act (more than 40 hours per week) makes the contractor liable for liquidated Damages Penafty
damages of $27 per day (updated annually) for every day each worker
exceeded 40 hours a week without being paid time and a half. Grantees
should contact their HCD staff for assistance if a violation occurs. See the web link for current CWHSS
penalty amount.
Section 7.9 Economic Opportunity Requirements During
Construction
Economic Opportunity is different than the non-discrimination in hiring requirements described in Chapter
4-. Grantee Requirements. Section 3 of the Housing and Urban Development Act of 1968 requires that
contracting and employment opportunities be offered to businesses located in and lower-income people
residing in the area of the project. (Additional information regarding provisions of Section 3 impacting a
grantee's contracting and contractor hiring is discussed in Chapter 5: Procurement.) This sectionbriefly
summarizes the duties of prime contractors related to subcontracting and employment efforts for both prime
contractors and subcontractors.
For covered projects, Section 3 establishes goals for job training, employment and contracting that the
grantee must track and report. For construction activities, the grantee should develop procedures to track
the following:
0 Employment and Job Training: new hires of Section 3 Residents
Published July 2021
Chapter 7: Labor SOndards
Contracting for Construction; total dollar amount of construction contracts and subcontracts with
Section 3 Businesses
Businesses seeking to confirm whether a resident meets the definition of Section 3 Resident or a firm meets
the definition of Section 3 business should consult with the LSO or other project contact identified by the
grantee or sub -recipient during the Pre -Construction Meeting.
Section 7.10 Guidance & Best Practice
AMPININUMMUT mol
Construction, alteration, or repair work of more than $2,000 that is financed in whole Appendix 7-4
or in part with CDBG or other federal funds, regardless of the CDBG amount will Construction versus
trigger Davis -Bacon wage rates for the project. installation work does not require installation
payment of Davis -Bacon wage rates if it involves only incidental construction work.
The applicability also may depend on the location of the incidental work. Appendix 7-4 provides
additional clarification regarding construction versus installation to help determine whether Davis -Bacon
wage rates must be paid for the work performed.
It is recommended that the grantee shares a copy of the Davis Bacon Labor Standards: Contractor's Guide
with the contractor (Appendix 7-2). This reference manual can be provided either at the pare -bidding
conference (optional) or the pre -construction conference,
While the following steps are not required, IACD recommends them as best practices to facilitate Iabor
standards compliance. If used, this documentation should be distributed when conducting the Pre -
Construction Conference.
The contractor should complete a State/Federal Wage Verification Appendix 7-5:
Form, listing each anticipated job classification and the required state Sample State/Federal
and federal wage rates for the project. The grantee should review and Wage Verification Form
approve to ensure compliance.
0 Each contractor must also complete the Fringe Benefit Certification Appendix 7-&
form to document all fringe benefit payments are to bona fide DOL- Fringe Benefit
approved plans. The LSO must receive this document in order to Certificatibn Form
review payrolls for compliance.
The contractor will need to provide a current employee roster, listing all persons currently employed
prior to the start of the project. The contractor should update this roster as work progresses and
employment hires are made.
The employee roster then can be used to cross check against future job opportunities for the project to
Published July 2021
Chapter 7: Labor Standards
determine completeness and accuracy of weekly payroll reports and if new hires were made to determine
if Section 3 hiring goals are being achieved. The roster is also helpful determining random selection of
employees for onsite or mail interviews and assisting in restitution payments when required.
When conducting interviews, administrators may choose to complete the
Project Wage Rate Sheet found in HUD Form 4720. This form will facilitate
Project Wage Rate Sheet
(HUD Form 4720)
interview questions with workers and completion of the required Record of
Employee Interview.
Record of Employee Interview
(HUt D Form 113
California state law requires that, on public works projects, pay to workers must equal: "the general
prevailing rate of per,diern wages for work of a similar character in the locality in which the public work is
performed, and not less than the general prevailing rate. "
California's prevailing wages are determined by the Director of the Department of Industrial Relations (DI:R).
The director sets the prevailing wage rate according to "collective bargaining agreements and rates
predetermined for federal public works, within the locality and the nearest labor market" under California
Labor Code § 1773.
Public works projects are construction projects financed: by the government for the benefit or use of the
general public. A more detailed definition can be found in California Labor Code § 1720.
Grantees are responsible for compliance with all state prevailing wage requirements when Davis Bacon is
not applicable.
For additional information regarding the State prevailing wage law and rates contact the California
Department of Industrial Relations at (844) 522-6734. State Prevailing Wage rates can also be requested
through the DIR web site at: http://www.ctdol.state.ct.us/wgwkstnd/prevailwage.htm.
Published July 2021