Loading...
HomeMy WebLinkAbout2.28.22 Emergency Action Plan Updates and ReprintsFEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections — San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 Office — (415) 369-3322 Facsimile BUTTE COUNTY ADMINISTRATION FEB 2 8 2022 OROVILLE, CALIFORNIA Mr. Jan Nimick, Vice President Pacific Gas and Electric Company Mail Code N11E P.O. Box 770000 San Francisco, CA 94177-0001 Re: 2021 Emergency Action Plan Updates and Reprints Dear Mr. Nimick: February 22, 2022 In reply refer to: Project Nos. 77-CA, 137-CA, 233-CA, 619-CA, 803-CA, 2105-CA, 2106-CA, 2130-CA, 2687-CA This is in response to a letter dated December 29, 2021 from Mr. Andrew Hagen that submitted notification of the 2021 Emergency Action Plan (EAP) Updates and Reprints that could not be fully eFiled for the Pacific Gas and Electric Company (PG&E) projects listed in the table in the Enclosure. It is not acceptable to transmit EAP documents via PG&E's Electronic Secure File Transfer system. EAP documents are noted to be in the portable document format (PDF), which is a format acceptable for upload to the Commission's eFiling system. All documents capable of being uploaded to the eFiling system should be transmitted to the Commission accordingly. If an individual file is too large to be submitted via the eFiling system (i.e. greater than 50MB), it should be broken down into multiple smaller components for eFile. If an individual file is too large to be submitted via the eFiling system and it is not able to be broken down into smaller components, please contact this office to discuss alternative methods for transmittal. 2 Within 45 days of the date of this letter, please submit the EAP Updates and Reprints as described above. File your submittal using the Commission's eFiling system at https://www.ferc.gov/ferc-online/overview. For all Dam Safety and Public Safety Documents, select Hydro: Regional Office and San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport(a)ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your cooperation in this aspect of the Commission's public safety program. If you have any questions, please contact Mr. Ryan Tom at (415) 369-3347. Sincerely, Fraann��kk L. Blackett, P.E. Regional Engineer Enclosure cc: Ms. Sharon Tapia, Division Manager Division of Safety of Dams California Department of Water Resources P.O. Box 942836 Sacramento, CA 94236-0001 2021 EAP Annual Updates and Reprints PG&E Project List Enclosure Projects Included in PG&E's December 29, 2021 Letter 2021 EAP Annual Updates and Reprints Project No. Project Name 77 Potter Valle 137 Mokelumne River 233 Pit No. 3, 4, and 5 619 Bucks Creek 803 DeSabla-Centerville 2105 Upper North Fork Feather River 2106 McCloud -Pit 2130 Spring Ga-Stanislaus 2687 Pit No. 1 1oft